Rick Farthing, P.E. Deputy Chief Facilities Officer

Facilities Management Services

23 Colleges on 40 Campuses

Complete 2021 Six Year Strategic Plan for Virginia’s Community Colleges

• Over the next ten years, Virginia will need to fill 1.5 million jobs.

• Majority of these jobs will require a postsecondary credential - an associate’s degree and the certifications and licensures that are our bread-and-butter

• To accommodate the demand for these middle-skill-level jobs (more than a high school degree but less than a bachelor’s)

• Virginia’s Community Colleges are embarking on a new six-year strategic plan to triple the number of credentials that our students earn by the year 2021.

Capital Construction Program

Tidewater Community CollegeVirginia Beach Campus - Renovate Bayside Building

Tidewater Community CollegeVirginia Beach Campus - Renovate Bayside Building

John Tyler Community CollegeMidlothian Campus - Academic Building

John Tyler Community CollegeMidlothian Campus Parking Deck

Southside Virginia Community CollegeDaniel CampusLearning Resources Center

Northern Virginia Community CollegeWoodbridge Campus Workforce Building

Buildings in Design or Under Construction

• Renovation to Georgiadis Hall, JSRCC Parham Campus – Under Construction with CM

• Replace Anderson Hall, VWCC - In design with CM

• Renovation to Fairfax Hall, LFCC Middletown Campus, Under construction with CM

Northern Virginia Community CollegeAlexandria Campus -Tyler Building Replacement

Tidewater Community CollegeChesapeake Campus - Parking Deck

Blue Ridge Community College Addition to Houff Student Center

Current VCCS Projects in Design

• Renovate Engineering & Industrial Technologies Building / Workforce Development, DCC – Out to Bid

• Expand Workforce Development Center – New Welding Building, DCC – Summer 2016 Bid

• Construct Parking Garage, BRCC – Fall 2016 Bid

2016 Bond Bill - VCCS Projects Approved to Move to Construction• Replace Academic and Administration Building, ESCC –

Bid Summer 2016• Renovate Seefeldt Academic Building/Replace Building

Envelope, NVCC Woodbridge Campus – A/E• Renovate Howsmon/Colgan Building, NVCC Manassas

Campus– A/E• Improve Life Safety, System Wide – A/E• Repair or Replace Major Mechanical Systems, NVCC,

NRCC, MECC – A/E

2016 Bond Bill - VCCS Projects Approved to Move to Construction (continued)

• Construct Student Service and Learning Resources Center, SVCC - Christianna – A/E

• Construct Bioscience Building, BRCC – A/E• Renovate Bird Hall and Renovate/Expand Nicholas

Center, JTCC Chester Campus – CM Summer 2016• Construct Academic Building, LFCC Fauquier Campus –

CM Summer 2016

2016 Bond Bill - VCCS Projects Approved to Move to Detailed Planning 2016 • Replace French Slaughter Building, GCC Locust Grove

Campus

• Renovate Diggs/Moore/Harrison Complex, TNCC Hampton Campus

• Construct Advanced Technical Training Center, PVCC

• Renovate Amherst/Campbell Hall, CVCC

2016 – 2022 Top 25 Capital Projects

• TCC-C Science and Engineering Building $25-$50M

• CVCC Renovate Amherst and Campbell Hall $10-$25M

• TNCC-H Replace Diggs/Harrison/Moore Halls $25-$50M

• VHCC Renovate Learning Resource Center $10-$25M

• VCCS Umbrella Request for Life Safety $10-$25M

2016 – 2022 Top 25 Capital Projects

• VCCS Umbrella Request for Major HVAC $10-$25M

• GCC-LG Replace Locust Grove Building $10-$25M

• SWVCC Renovate Buchanan & Tazewell Halls $10-$25M

• TCC-VB Renovate and Expand Princess Anne Bldg. $10-$25M

• NVCC-M Construct Learning Support Bldg. $10-25M

2016 – 2022 Top 25 Capital Projects

• NRCC Construct Advanced Manufacturing Bldg. $10-$25M

• PVCC Construct Student Success Center/LRC $10-$25M

• BRCC Renovate Houff Student Center $0-$10M

• PHCC Renovate Stone Hall Building $10-$25M

• VWCC Renovate Brown Library/LRC $10-$25M

2016 – 2022 Top 25 Capital Projects

• MECC Construct LRC and Renovate Robb Hall $10-$25M

• PDCCC-F Franklin Campus Improvements $10-$25M

• NVCC–AL Construct Phase IV Academic Bldg. $10-$25M

• TCC-VB Construct Academic – Engr. & Tech. $10-$25M

• PHCC Renovate A.L. Philpott Technical Center $10-$25M

2016 – 2022 Top 25 Capital Projects

• WCC Renovate and Expand Fincastle Hall $10-$25M

• RCC Renovate Academic/Administration Bldg. $0-$10M

• SVCC Renovate Student Services/LRC Main Bldg. $0-$10M

• TCC-N Renovate Walker Building $10-$25M

• TCC-P Construct Academic Bldg.-Tech. & Visual Arts $25-$50