rick farthing, p.e. deputy chief facilities officer ... · • construct student service and...
TRANSCRIPT
Rick Farthing, P.E. Deputy Chief Facilities Officer
Facilities Management Services
23 Colleges on 40 Campuses
Complete 2021 Six Year Strategic Plan for Virginia’s Community Colleges
• Over the next ten years, Virginia will need to fill 1.5 million jobs.
• Majority of these jobs will require a postsecondary credential - an associate’s degree and the certifications and licensures that are our bread-and-butter
• To accommodate the demand for these middle-skill-level jobs (more than a high school degree but less than a bachelor’s)
• Virginia’s Community Colleges are embarking on a new six-year strategic plan to triple the number of credentials that our students earn by the year 2021.
Capital Construction Program
Tidewater Community CollegeVirginia Beach Campus - Renovate Bayside Building
Tidewater Community CollegeVirginia Beach Campus - Renovate Bayside Building
John Tyler Community CollegeMidlothian Campus - Academic Building
John Tyler Community CollegeMidlothian Campus Parking Deck
Southside Virginia Community CollegeDaniel CampusLearning Resources Center
Northern Virginia Community CollegeWoodbridge Campus Workforce Building
Buildings in Design or Under Construction
• Renovation to Georgiadis Hall, JSRCC Parham Campus – Under Construction with CM
• Replace Anderson Hall, VWCC - In design with CM
• Renovation to Fairfax Hall, LFCC Middletown Campus, Under construction with CM
Northern Virginia Community CollegeAlexandria Campus -Tyler Building Replacement
Tidewater Community CollegeChesapeake Campus - Parking Deck
Blue Ridge Community College Addition to Houff Student Center
Current VCCS Projects in Design
• Renovate Engineering & Industrial Technologies Building / Workforce Development, DCC – Out to Bid
• Expand Workforce Development Center – New Welding Building, DCC – Summer 2016 Bid
• Construct Parking Garage, BRCC – Fall 2016 Bid
2016 Bond Bill - VCCS Projects Approved to Move to Construction• Replace Academic and Administration Building, ESCC –
Bid Summer 2016• Renovate Seefeldt Academic Building/Replace Building
Envelope, NVCC Woodbridge Campus – A/E• Renovate Howsmon/Colgan Building, NVCC Manassas
Campus– A/E• Improve Life Safety, System Wide – A/E• Repair or Replace Major Mechanical Systems, NVCC,
NRCC, MECC – A/E
2016 Bond Bill - VCCS Projects Approved to Move to Construction (continued)
• Construct Student Service and Learning Resources Center, SVCC - Christianna – A/E
• Construct Bioscience Building, BRCC – A/E• Renovate Bird Hall and Renovate/Expand Nicholas
Center, JTCC Chester Campus – CM Summer 2016• Construct Academic Building, LFCC Fauquier Campus –
CM Summer 2016
2016 Bond Bill - VCCS Projects Approved to Move to Detailed Planning 2016 • Replace French Slaughter Building, GCC Locust Grove
Campus
• Renovate Diggs/Moore/Harrison Complex, TNCC Hampton Campus
• Construct Advanced Technical Training Center, PVCC
• Renovate Amherst/Campbell Hall, CVCC
2016 – 2022 Top 25 Capital Projects
• TCC-C Science and Engineering Building $25-$50M
• CVCC Renovate Amherst and Campbell Hall $10-$25M
• TNCC-H Replace Diggs/Harrison/Moore Halls $25-$50M
• VHCC Renovate Learning Resource Center $10-$25M
• VCCS Umbrella Request for Life Safety $10-$25M
2016 – 2022 Top 25 Capital Projects
• VCCS Umbrella Request for Major HVAC $10-$25M
• GCC-LG Replace Locust Grove Building $10-$25M
• SWVCC Renovate Buchanan & Tazewell Halls $10-$25M
• TCC-VB Renovate and Expand Princess Anne Bldg. $10-$25M
• NVCC-M Construct Learning Support Bldg. $10-25M
2016 – 2022 Top 25 Capital Projects
• NRCC Construct Advanced Manufacturing Bldg. $10-$25M
• PVCC Construct Student Success Center/LRC $10-$25M
• BRCC Renovate Houff Student Center $0-$10M
• PHCC Renovate Stone Hall Building $10-$25M
• VWCC Renovate Brown Library/LRC $10-$25M
2016 – 2022 Top 25 Capital Projects
• MECC Construct LRC and Renovate Robb Hall $10-$25M
• PDCCC-F Franklin Campus Improvements $10-$25M
• NVCC–AL Construct Phase IV Academic Bldg. $10-$25M
• TCC-VB Construct Academic – Engr. & Tech. $10-$25M
• PHCC Renovate A.L. Philpott Technical Center $10-$25M
2016 – 2022 Top 25 Capital Projects
• WCC Renovate and Expand Fincastle Hall $10-$25M
• RCC Renovate Academic/Administration Bldg. $0-$10M
• SVCC Renovate Student Services/LRC Main Bldg. $0-$10M
• TCC-N Renovate Walker Building $10-$25M
• TCC-P Construct Academic Bldg.-Tech. & Visual Arts $25-$50
Rick Farthing