ps02 guide quality assurance guide for suppliers 01-03 quality assurance guide for... · quality...
Post on 07-Jul-2018
228 Views
Preview:
TRANSCRIPT
QUALITY ASSURANCE GUIDE
FOR SUPPLIERS
Version of 01/03/2017
VersIon 01/03/2017 Page 2 of 29
Quality Assurance Guide for Suppliers
Index
INDEX _________________________________________________________________________________________________________ 2
INTRODUCTION _______________________________________________________________________________________________ 3
GOAL___________________________________________________________________________________________________________ 3
1. Request for Quotation – RFQ _______________________________________________________________________________ 4
2. Selection and evaluation ___________________________________________________________________________________ 5
3. Development of New Products _____________________________________________________________________________ 7
3.1. Inputs for quotation request _____________________________________________________________________________ 7
3.2 Initial samples report _____________________________________________________________________________________ 7
3. Validation ___________________________________________________________________________________________________ 8
4. Serial Supply of Direct Materials ___________________________________________________________________________ 9
4.1. Technical Reception ______________________________________________________________________________________ 9
4.2. Non-conforming Products _________________________________________________________________________________ 9
4.3. Costs related with non-conformities_____________________________________________________________________ 10
5. Environmental Requirements ______________________________________________________________________________ 11
ATTACHMENTS _______________________________________________________________________________________________ 12
VersIon 01/03/2017 Page 3 of 29
Quality Assurance Guide for Suppliers
Introduction
The mission of Simoldes Group Plastics Division is to be the preferred choice of its customers,
employees and suppliers, contributing to a sustained growth of their shareholders satisfaction.
To achieve this goal it is fundamental that all the products produced and purchased by Simoldes Group
comply with the required specifications.
Acquisition of world–class performance levels is only possible by associating suppliers to a common quality
assurance policy which allows that all quality procedures are applied throughout the whole productive flow.
The development of a close collaboration between Simoldes and its suppliers, from the product conception
stage to serial supply, is crucial to reach the zero defects target.
The present guidebook sets out the product quality principles that must guide the relationship between
Simoldes and its Suppliers.
Goal
To guarantee products quality assurance from the reception phase in our facilities till the final customer use,
establishing a common way of communication and share of good practices between Simoldes Group
companies and their suppliers.
VersIon 01/03/2017 Page 4 of 29
Quality Assurance Guide for Suppliers
1. Request for Quotation – RFQ
Request for Quotation (RFQ) is the process that precedes supplier selection and allows the supplier to offer
goods or services. The documents associated to this stage are:
I. Tools
a. Injection Tool Specification – M041PP02 (Attachment A ) – allows the identification of specific
characteristics of the tool of the part
b. Tool specifications – defines the general specifications for all tools of Simoldes Group
II. Equipment
a. Equipment Specification – M037PP02 (Attachment B ) – allows identifying the equipment specific
characteristics
b. Equipment Specifications – defines the general specifications for all the Equipment of Simoldes
Group
III. Checking Fixtures
a. General Checking Fixtures Specifications for construction of checking fixtures and Specific
Checking Fixtures Specifications for construction of checking fixtures – define the characteristics /
specifications required to build checking fixtures.
IV. Materials / Components e Subcontracting
a. RFQ - M011PS02.I (Attachment C ):
● Part Price Breakdown – allows identifying what is included in the price offered
(materials/processes/logistics...);
● Packaging Concept – defines general rules to concept packaging of products and
components.
V. Logístics Services / Shipments
a. Specific Requirements for Logistics Services/ Regular Transports – defines the specific
characteristics associated to Logistic Services and Transports.
Besides these documents, others may be sent as a complement to the reference file.
At this stage, the “General Purchase Conditions” of Simoldes Group are sent to the supplier and applied to all RFQ.
VersIon 01/03/2017 Page 5 of 29
Quality Assurance Guide for Suppliers
2. Selection and Evaluation
The materials purchased by the companies of Simoldes Group are classified in two families:
I. Direct Materials : materials that are fully part of the customer final product (raw materials,
product components and packaging)
II. Indirect Materials : materials which are not included in the customer’s final product and
services in general.
a. Related to the final product: production and control tools, engineering and laboratory services
b. Not related with the product - NPR (Non Product Related): Services and transport/general,
equipment and materials to the maintenance and production.
All adjudications are preceded of a supplier selection process.
There are two processes in the supplier selection:
● Supplier belonging to the Simoldes Panel and previously qualified
● Supplier out of the panel (new)
In this last case (supplier out of Simoldes panel), it is necessary to fulfill the “Supplier Identification Sheet
/ Quality Assurance System Inquiry” M007PS02 (Attachments D(1) and D(2) ). In this document, besides
identification data, it’s made an inquiry about the elements of the Supplier’s Quality Assurance System.
The supplier’s quality certification proof must be sent by the supplier.
An audit of the supplier’s processes may be requested by Simoldes, at this stage.
Panel suppliers are biannually evaluated by Simoldes, according to M016PS02.
This Supplier evaluation generates three types of classification levels: A, B and C.
• Supplier A – Low Risk;
• Supplier B – Moderate Risk;
• Supplier C – High Risk.
All suppliers evaluated with B must submit an improvement action plan, related to the points
identified in the evaluation. Suppliers evaluated with C may not be awarded w i t h new products
or services, till i m p l e m e n t ation of corrective actions for the deviations identified in the
evaluation.
VersIon 01/03/2017 Page 6 of 29
Quality Assurance Guide for Suppliers
Biannual Evaluation of Direct Materials Suppliers – M016PS02 (Attachment E(1)
This evaluation covers different areas, namely:
Q - “Quality”: PPM; Quality Claims; Ner of Customer Disruptions; Quality System Certification level;
8D Answer delay for step 4
D - “Logistics”: Logistic Claims
Annual Evaluation of Direct Materials Suppliers – M 016PS02 (Attachment E(2)
This evaluation covers different areas, namely:
Q - “Quality”: PPM; Quality Claims; Ner of Customer Disruptions; Quality System Certification level;
8D Answer delay for step 4
C - “Cost”: Productivity, Price vs Market
D - “Logistics”: Logistic Claims
D - “Development”: Innovation hability; Codevelopment
M - “Managment”: Attitude; Organization; Financial Situation
Annual Evaluation of Indirect Materials Suppliers – M016PS02
This evaluation covers the following purchase areas:
Calibration and Lab Tests, Engineering Serv. : Service performance, price, reply delay, delivery delay,
geographic proximity – M016PS02 (Attachment F(1) )
Production Means : Capacity and Technical Autonomy, delivery delay, financial capacity, quality of
execution, technical assistance and reply delay – M016PS02 (Attachment F(2) )
Shipments : Service performance, price, reply delay and financial capacity – M016PS02 (Attachment
F(3))
Annual Quality Commitmen t - M006PS02
Applying the zero defect strategy, annually, we share with our Suppliers a Quality Commitment, structured by
business area, which must assure Simoldes’ and Customers’ requirements, through partnerships and
Improvement Processes.
The document M006PS02 (Attachment G ) is annually sent to each Supplier / Economic Group and defines
the Quality Targets, PPM’s, Incidents (Quality and Logistics) and Answer delay 8D –Step 4 of the current year.
In case of deviations on the defined Targets, the supplier will be alerted biannually and an action plan will be
required for its correction.
VersIon 01/03/2017 Page 7 of 29
Quality Assurance Guide for Suppliers
Note: The suppliers of materials included in products supplied to VW Group, must appoint and communicate
(if requested) a Product Safety Representative (PSB). This demand is required to their sub-suppliers. (VDA
6.3).
3. Development of New Products
3.1. Offer Inputs
Matrix “Product Specification: components & subcontracting” - M008PS02 (Attachments H(1) and H(2) ) -
determines the particular specifications required for the product and i t ’ s supplied by Purchasing
Direction, during the quotation phase, through Matrix. This matrix mentions the applicable specific
requirements, such as standards, drawings, expected volumes, logistics, quality targets, critical characteristics
definition, necessary documentation to Initial sample report, etc.
As a specialist, Supplier must request, through Purchasing Direction, all the complementary information
needed to quote its goods or services to guarantee that they meet the targets.
In order to clarify all issues related to specifications, i t may be held a meeting between technical teams.
3.2. Initial sample report
After acquisition, the supplier must submit, in the requested date (see “Product Specifications” matrix),
samples together with the Initial Sample Report (*).
The Initial Sample Report aims to demonstrate the conformity of the product according to the requested
specifications and must include all required items in the “Product Specifications” matrix.
This Initial Sample Report must present a front page duly fulfilled. For this purpose, supplier can use the
“Suppliers Initial Samples Front Page” or “VDA/PSW” format according to M017PS02 / M018PS02 from
Attachments I(1) and I(2) .
Initial samples must be produced in serial conditions, without reworks or any other type of treatment that
doesn’t represent the process to implement in serial.
A new Initial Sample Report must be presented whenever there are:
● Technical / specifications ions changes
● Changes in the supplier’s production process or in the production location
● Changes of materials/components of the supplied product
● Product Requalification every 3 years: Dimensional, Functional and Laboratory tests
VersIon 01/03/2017 Page 8 of 29
Quality Assurance Guide for Suppliers
In the absence of an express statement, it is understood that supplier, understand and applies the hereby
specifications and Final Customer Specific Requirements (OEM), as well its application within their suppliers.
In order to ensure the quality of the products supplied to Simoldes Plásticos Group, supplier must regularly
requalify them in accordance to ISO/TS 16949 (section 8.2.4.1 - Lay out inspection and functional testing). For
this, it’s necessary a complete requalification, at least every 3 years.
Supplier must keep the productive capacity according to the Initial Sample Report, during product serial life
and aftersales (+15 years after serial production). That’s why it is demanded to supplier to keep the initial
sample report during this period.
(*) Initial Sample Report: PPAP (“Production Part Approval Process”) or PSW (Parts Submission Warrant)
3.3. Validation
From the Initial Sample Report analysis, one of the following decisions will be taken:
● Approved: Authorization for supply, without restrictions.
● Conditionally Approved: Authorization for limited supply, in quantity or time.
The conditional supply period must allow the implementation of the action, in order to conclude the
validation processes, for definitive approval.
● Rejected: No authorisation for supply. Demands corrections; a new presentation of initial
samples and correspondent initial sample report.
The correction of non-conformities must be implemented during a period of time agreed between both sides,
before the start of supplies (pre-serial or serial).
Any supply can be started without previous validation of Simoldes Quality Direction.
Products that do not have Initial sample report (ex: raw-materials and masterbatches) must also be submitted
to the samples validation process.
VersIon 01/03/2017 Page 9 of 29
Quality Assurance Guide for Suppliers
4. Serial Supply of Direct Materials
4.1. Technical Reception
In its productive and logistic process, the supplier is responsible for the implementation of adequate methods
and tools to assure the supply of products, according to the specifications and Initial Sample Report
presented. Having this assumption as a fundamental base, the technical reception of the products in the
companies of the Simoldes Group is done according to the following methodology:
Condition I - Control 20 samples in 5 consecutive lots, if OK change for condition II
Condition II - Control 5 samples in 3 consecutive lots, if OK change for condition III; change for condition
I if 1 non-conform part has been detected
Condition III - Product in Quality Assurance, control 5 samples of 1 lot per semester; change for
condition II if 1 non-conform part has been detected
According to the product, the companies of Simoldes Group, determine the characteristics to be controlled, as
well as the checking fixtures.
4.2. Non-conforming Products
Non-conformities may be detected by the companies of Simoldes Group in different process phases,
namely:
● In the incoming inspection
● In the manufacturing process
● In the final customer
Non-conformities may be of different types:
● Quality: Dimensional, functional, aspect, expiration date, mix of references/parts
● Logistics : Quantities, delivery delay and packaging NOK
● Documentation: Related to q uality of the product (documentation about expiration date; certificates,
batch number, others) and logistics (delivery notes or other non-existing documents or wrongly fulfilled)
In case of non-conformity detection, companies of Simoldes Group will send to supplier a Report of Non-
conformity (RNC), identifying the problem, b y u s i n g the document m a t r i x M015PP06 of Attachment
J(1) or other equivalent document (same content).
VersIon 01/03/2017 Page 10 of 29
Quality Assurance Guide for Suppliers
It is expected from the supplier the following treatment:
a) Promote the sorting of all suspect/non-compliant material in supplier facilities or in Simoldes Group
facilities
b) Define and inform containment actions to the problem within a period of 24h
c) Send new products after sorting, duly identified, to stocks replacement
d) Identify the causes of the incidents and implement the respective corrective and preventive action
plan. This action plan must be submitted in 8D format (example M016PP06, Attachment J(2) ) and
sent in a period of 7 days after receiving the Non-conformity Report
4.3. Costs related with non-conformities For each non-conformity it is made a survey of the costs involved during the whole supply chain, according
to the Costs Synoptic of Attachment K .
All costs involved will be previously sent to the supplier, with the respective detail, through the Non- conformity
Report.
The supplier have 24 hours to clarify any related doubt before debit is issued by the companies of Simoldes
Group.
5. Environmental Requirements
Within the scope of Environmental Management System, Simoldes Group intends to sensitize its suppliers to
the adoption of environmentally sustainable practices.
The suppliers of Simoldes Group must:
• Assure compliance with all environmental requirements imposed by applicable legislation
• Develop productive practices in order to minimize the generation of solid wastes, emission of air
pollutant and emission of liquid effluents
• Assure the implementation of policies to control the consumption of natural resources
• Implement, whenever possible, environmental management systems that allow its sustainable
development
Note for all the suppliers of hazardous substances and mixtures: These suppliers must assure that the
product safety data file and their respective labels are in the language of the destination country of the
supplies.
VersIon 01/03/2017 Page 11 of 29
Quality Assurance Guide for Suppliers
Attachments
VersIon 01/03/2017 Page 12 of 29
Quality Assurance Guide for Suppliers
Attachment A
VersIon 01/03/2017 Page 13 of 29
Quality Assurance Guide for Suppliers
Attachment B
VersIon 01/03/2017 Page 14 of 29
Quality Assurance Guide for Suppliers
Attachment C
VersIon 01/03/2017 Page 15 of 29
Quality Assurance Guide for Suppliers
Attachment D(1)
VersIon 01/03/2017 Page 16 of 29
Quality Assurance Guide for Suppliers
Attachment D(2)
VersIon 01/03/2017 Page 17 of 29
Quality Assurance Guide for Suppliers
Attachment E(1)
VersIon 01/03/2017 Page 18 of 29
Quality Assurance Guide for Suppliers
Attachment E(2)
VersIon 01/03/2017 Page 19 of 29
Quality Assurance Guide for Suppliers
Attachment F(1)
VersIon 01/03/2017 Page 20 of 29
Quality Assurance Guide for Suppliers
Attachment F(2)
VersIon 01/03/2017 Page 21 of 29
Quality Assurance Guide for Suppliers
Attachment F(3)
VersIon 01/03/2017 Page 22 of 29
Quality Assurance Guide for Suppliers
Attachment G
VersIon 01/03/2017 Page 23 of 29
Quality Assurance Guide for Suppliers
Attachment H(1)
VersIon 01/03/2017 Page 24 of 29
Quality Assurance Guide for Suppliers
Attachment H(2)
VersIon 01/03/2017 Page 25 of 29
Quality Assurance Guide for Suppliers
Attachment I(1)
VersIon 01/03/2017 Page 26 of 29
Quality Assurance Guide for Suppliers
Attachment I(2)
VersIon 01/03/2017 Page 27 of 29
Quality Assurance Guide for Suppliers
Attachment J(1)
VersIon 01/03/2017 Page 28 of 29
Quality Assurance Guide for Suppliers
Attachment J(2)
VersIon 01/03/2017 Page 29 of 29
Quality Assurance Guide for Suppliers
Attachment K Costs Synopsis
Complaints Treatment Costs
125€
25€/h
Yes Parts destruction 25€/h
No
Semi-finished stock
100€ Complaint
formalisation
Non-compliance
management
Corrective
containment actions
Components in stock
Sorting action
Finished-product stock
(plant, warehouse, customer)
Semi-finished stock
Part's destruction by Group
Issuance of Debit Note
top related