New Ringgold Middle School
Project SlideshowFebruary 25, 2017
Aerial Photo from East
Provided by Hudson Group – Taken 2.20.2017
Aerial Photo from Southeast
Provided by Hudson Group – Taken 2.20.2017
Aerial Photo from South
Provided by Hudson Group – Taken 2.20.2017
Aerial Photo from Northwest
Provided by Hudson Group – Taken 2.20.2017
Aerial Photo from North
Provided by Hudson Group – Taken 2.20.2017
Building Areas
Provided by Hudson Group – Taken 2.20.2017
Masonry Installation – Kitchen - Area A
Masonry Installation – Kitchen - Area A
Masonry Installation – Kitchen - Area A
Masonry Installation – Area A
Brick Installation – Area A
Bulkhead Framing - Cafeteria – Area A
Work Progress – 1st Floor - Area A
Stud Wall Framing - 2nd Floor – Area A
Framing – Radius – Area A
GlasRoc Installation at Radius - Area A
Work Progress – 2nd Floor – Area A
Brick Installation – Area B
Work Progress – 1st Floor - Area B
Masonry Installation – 1st Floor – Area C
Work Progress – 1st Floor - Area C
Masonry Installation – 2nd Floor- Area B
Masonry Installation – 2nd Floor- Area B
Masonry Installation – 2nd Floor- Area B
Brick Installation – Area B
Work Progress – 2nd Floor - Area B
Masonry Installation – 2nd Floor – Area C
Masonry Installation – 2nd Floor – Area C
Masonry Installation – 2nd Floor – Area C
Work Progress – 2nd Floor - Area C
Masonry Installation - Area D
Masonry Installation - Area D
Masonry Installation - Area D
Masonry Installation - Area D
Brick Installation - Area D
Work Progress – Area D
Roof Decking – Area A
Roof Installation – Area A
Bar Joist/Roof Structure Installation – Area B
Bar Joist/Roof Structure Installation – Area B
Long Spans Installation – Auditorium - Area D
Steel Detailing – Auditorium - Area D
Bar Joist Installation – Area D
Bar Joist Installation – Area D
Roof Deck Installation – Low Roof – Area D
Roof Deck Installation – Gym – Area D
Roof Progress
Continue Setting Door Frames
Window Installation – Area A
Window Installation – Area B
Window Installation – Area C
Cuts for Sleeves at Tennis Courts
Plumbing Rough In – Kitchen – Area A
Plumbing Rough In – 2nd Floor – Area A
Installation of Water Line
Installation of Water Line & Fire Hydrant
Water Lines – Fitness Center
West Penn – Installation of Permanent Power
Installation of Conduit for Telecommunications from HS to MS
Electrical Rough In – 2nd Floor – Area A
HVAC Piping Installation - Kitchen – Area A
HVAC Piping Installation – 2nd Floor - Area A
HVAC Piping Installation – 2nd Floor - Area A
HVAC Ductwork Installation – 1st Floor - Area A
Sprinkler Piping Installation – Area B
School Board Tour – February 18, 2017
• Finish Masonry Installation – 2nd Floor – Areas C• Continue Masonry Installation – Area D• Continue Brick Installation – Area B• Continue Plumbing & Electrical Wall Rough In• Parapet Framing - Fitness Center• Complete Roof Decking – Gym - Area D• Roof Decking – Auditorium – Area D• Continue Roofing – Area A • Roofing - Fitness Center• Continue Stud Wall Installation• Continue Window Installation – Area A, B & C• Continue Door Frame Installation• Continue HVAC Piping Installation – 1st Floor - Areas A, B, & C• Continue HVAC Ductwork Installation• Sprinkler Piping Installation – Area A, B & C• Site Concrete – Loading Dock
Scheduled Work for Next Few Weeks
The End