Session 1

PPM ConceptsOrganizational Breakdown Structure (OBS)Different ViewsTo create new OBSRestrictionsEnterprise Project Structure (EPS)Different views.To Create newAssigning the responsible managerDifference between EPS & OBS

Session 2

ProjectsOverview of the ProjectCreation of new project through wizardCreation of new project through detailsCalendar Global, Resource, Project.New CalendarModification, Copying holidays from global.Making a Project or resource Calendar as global.Assigning a Calendar as default for the projects.

Session 3

Entering Activities through Wizard.Entering Activities through details.Explore the use of duration format including sub unit.Mile Stones, Activity Type.Inserting a new ColumnMoving the ColumnsTime Scale adjustments.Different kind of relationship between tasks.Different methods of linkingEstimating the project finish date.Identifying the project critical pathEditing the task linksApplying different calendars to activities & Estimating the finish date.Constraints in a Project.Different types of ConstraintsUse of Secondary Constraint

Session 4

Work Breakdown Structure (WBS)What is WBSExample for WBSDefining StructureApplying WBS for tasksActivity CodesCode DefinitionAssigning Code and Organizing.ReorganizingProject Codes

Code DefinitionAssigning Code and Organizing.ReorganizingResource CodesCode DefinitionAssigning Code and Organizing.Reorganizing

Session 5

Work Products & DocumentsDefining WPs & DocsDifference between WP & DocAssigning it for activities.CurrencyTo change the currencyTo Create new CurrencySetting exchange rateTo find the rate of project in another currency value.RolesImportance of RolesDefining the rolesGiving rates for the roles

Session 6

Resource Sheet PreparationDefining Resource through WizardDefining Resource through detailDefining Resource through CalendarTo create new unit of Measure for materials which is not available in the list.Resource AssigningThrough add rolesThrough add resourcesGiving different rate which has not mentioned either in resource or role.

Session 7

Analysis ResourcesResource Usage ProfileResource Usage Spread SheetResource CurvesResource LevelingConcepts of Stretching, Crunching & Splitting – ManualAutomatic LevelingUpdating Progress

Session 8

Setting DatabaseEntering Actual Start & Actual Finish date for tasksUpdating through durationUpdating through PhysicalUpdating through UnitsCost UpdatingComparative Study of Baseline and Actual Plan

Session Calculating earned Value analysis

9

FilterGlobal ChangeReportsTabularGraphicalImport / ExportFormatting BarsUser defined fields

Session10 Methodology Management