Residential Steps and DecksAugust 10 2011
Melissa Pressnail B.Eng
James Regier
Ebi Moradi P.Eng
Tony Hof
2
Residential Steps and Decks
1.About Armtec
2.What are Precast Steps ?
3.Benefits
4.Steps vs. Decks
5.Finishes
6.Support Requirements
7.Site Preparation
8.Installation
9.The Process
10.Testimonials
11.Full Package From Armtec
About Armtec1/
4
Since:
1908
About Armtec
5
About Armtec
• Armtec is a leading global infrastructure and construction materials company
• 48 locations in Canada, including production facilities and offices in every region
• Global customer base with projects around the world • Approximately 2,000 employees, $500M • Toronto Stock Exchange trading symbol: ARF.UN
6
Introduction
• BEBO Concrete Arches
• Bin-Wall
• Bin-Wall Bridge Abutments
• Bridge Girders and Beams
• Bridge-Plate
• Communications
• Concrete Sound Fencing
• Corrugated Steel Pipe
• Double Tees
• Durisol Precast Noise Barriers
• Electrical
• Geosynthetics
• HDPE Pipe
• HDPE Tubing
• Mechanically Stabilized Earth Retaining Walls
• Multi-Plate
• PARAGLAS SOUNDSTOP
• Platon
• Precast Concrete Steps
• Precast Concrete Structures and Elements
• Precast Tunnel Liner
• Precast Utility Pads
• Prestressed Hollowcore Slabs
• Sports Venues
• Stormwater Treatment/Detention Systems
• Streetlight Bases and Traffic Control
• Sumps and Trenches
• Tunnel Liner Plate
• Ultra Flo Steel Pipe
• Water Control Products
What are Precast Steps ?2/
8
What are Precast Steps ?
“Precast concrete is a construction product produced by casting concrete in a reusable mold or form which is then cured in a controlled environment, transported to the construction site and lifted into place”
- wikipedia
Finishes3/ Benefits
10
Benefits
Why use Precast Steps ?
•Durability
•Ease of installation
•Quality appearanceFully customizable
•Speed of install• In and out in less than an hour• All weather install
•Consistent factory quality & certification• CSA, ISO• Consistent finish quality• Climate controlled manufacturing
environment
4/ Steps vs Decks
12
Steps vs Decks
Steps
• The risers are cast monolithic with the top slab
• The risers are the same width as the front edge of the top slab
• Available in any size with any number of risers
• Angles available on top slab
13
Steps vs Decks
Decks (Verandah)
• The risers are cast separate from the verandah
• The risers are not necessarily the same width as the verandah
• Angles on verandah is available
• Available in recessed configuration for brick or rock feature
Finishes5/ Finishes
15
Finishes
Etched Risers
• Broom surface on treads and top slab as a result of face up casting. The vertical surfaces on the risers between the bullnose and the tread are exposed
16
Finishes
Etched Sides & Risers
• Broom surface on treads and top slab
• The vertical surfaces on the risers between the bullnose and the tread are exposed
• All vertical surfaces on the risers between the bullnose & the tread and on the sides of the unit below the bullnose are exposed
17
Finishes
Recessed Deck
• Broom surface on treads and top slab as a result of face up casting
• The vertical surfaces on the risers between the bullnose and the tread may be plain or exposed
• The top slab overhangs the deck apron to allow brick or stone to be built up on vertical face
18
Finishes
Exposed
• All surfaces (vertical and horizontal) are exposed aggregate
• Aggregate colour options of grey or brown
19
Finishes
Plain
• Broom surface on treads and top slab as a result of face up casting.
• All vertical surfaces are steel form finished
Finishes6/ Support Requirements
21
Support Requirements
• Brackets
• Smaller Steps (up to 4’ deep and 8’ wide)
• Smaller Decks (up to 4’ deep and 8’ wide)
• Post loads require double brackets
• Piles
• Minimum requirement for larger steps and decks
• Option for post loads
• Wing Walls
• Extension of the foundation wall• Best option for any installation
7/ Site Preparation
23
Site Preparation
Wing Walls
• When used with overpoured deck aprons, they allow for grade variance, eliminating the void under the deck
• Allows backfilling prior to step installation
24
Site Preparation
25
Site Preparation
Access to homes and sites
• Siding should be installed after step installation. Siding contractors should not be moving steps for siding installation.
8/ Installation
27
Installations
• Rear mount knuckle booms on 8 ½ ton tandem truck
• Steps and decks are installed using the inserts on the top slab
Finishes9/ The Process
29
The Process
• Orders are received by the customer service representatives
30
The Process
• Drawings are reviewed
31
The Process
• CAD drawings for production are produced
• Orders are sent to production
32
The Process
Step Form Deck Form
• Shape is laid out
• Rebar is placed
• Lifting inserts placed on rebar
33
The Process
Installers process on site:
• Installer check location for proper fitting of step• Ensures wing wall is at proper height
34
Installers process on site:
• Truck is backed in as close as possible to maximize crane efficiency
The Process
35
Installers process on site:
• Step is lifted off truck and put into place, shims are adjusted as required
The Process
36
The Process
Finishes9/ Testimonials
38
Testimonials
“…more efficient timeline”
“… consistent quality of the finished product”
Summary
• Ease / speed of installation
• All weather install• Installation in less than a half hour
• Superior Appearance
• Consistent finish quality• Highly customizable
• Designed to Perform:
• Produced in controlled manufacturing environment• Built to last
39
Full Package From Armtec
• Platon
• Sound Walls
• Lock + Load Retaining Walls
• Prestressed Hollowcore Slabs
• Window Wells and Basement Stairs
40
Full Package From Armtec - Platon
• Impermeable damp proof barrier
• A uniquely dimpled 24-mil high-density polyethylene (HDPE) sheet
• The dimples form an AIR GAP under the impermeable surface of Platon
41
Full Package From Armtec - Platon
Foundation Protection
•If any water does manage to get by the Platon sheet it flows through the air gap to the footing drain.
Flooring Protection:
•Lifts finished floor off cold damp concrete
•Protects finished floor from slab moisture
42
Full Package From Armtec – Sound Walls
• Absorptive
• Reflective
• Transparent
43
44
Full Package From Armtec – Sound Walls
Solid Rock Fencing – Stone Tree
45
Full Package From Armtec – Sound Walls
Durisol - Sound Absorbing Panels
46
Full Package From Armtec – Sound Walls
Paraglas Soundstop
47
Full Package From Armtec – Sound Walls
Paraglas
Soundstop
48
Full Package From Armtec – Lock + Load
Full Package From Armtec – Lock + Load
COUNTERFORT
PANEL
Full Package From Armtec - Hollowcore
50
Prestressed Hollowcore Slabs:
• Sound barrier between floors• Provide excellent fire resistance• Lightweight
Full Package From Armtec
Window Wells and Basement Stairs
51
52
Melissa Pressnailmelissa.pressnail@armtec.com
(604) 349-8323