plan coast study tour 7/2007

Post on 02-Jan-2016

24 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Plan Coast Study Tour 7/2007. Territorial Impact Assessment of off shore projects By Bernhard Heinrichs Director of Spatial Planning Department Ministry of Transport, Building and Regional Development Mecklenburg - Vorpommern. Plan Coast Study Tour 7/2007. Contents. - PowerPoint PPT Presentation

TRANSCRIPT

Plan Coast Study Tour 7/2007

Territorial Impact Assessmentof off shore projectsBy Bernhard Heinrichs

Director of Spatial Planning DepartmentMinistry of Transport, Building and Regional Development Mecklenburg - Vorpommern

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Contents

1.) Introduction: about the Federal State of MV

2.) Sea borders and sea uses

3.) Instruments of Spatial Planning

4.) Territorial Impact Assessment (TIA) – the method

5.) Examples of TIA for off shore projects

6.) Conclusions

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Some basic facts about MV M-V Germany

Area: 23.000 km² 357.000 km²

Population: 1,7 million 82,5 million

GDP per capita: 19.100 € 28.000 €

Unemployment rate: 19,0 % 10,8 %

Economic sectors:

- agriculture 2,7 % 1,0 %

- industry 19,6 % 29,9 %

- services 77,7 % 69,1 %

Growth rate:

- GDP 3,4 % 3,1 %

- Manufacturing industry: 9,7 % 4,4 %

Administrative Borders in the Baltic Sea (12 miles-zone, EEZ)

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Uses in theBaltic Sea

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Uses in theBaltic Sea

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Main Instruments of Spatial Planning in Germany

1. Formal Instruments:

• Comprehensive plan for state terrritory

• Territorial Impact Assessment of complex projects

• Spatial Planning Statement on local plans or less complex projects

2. Informal Instruments:

• Moderation of spatial use conflicts

• Elaboration and concertation of nonbinding action programmes

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Hierarchy of Spatial Plans in the Federal States of Germany

Level Type of Plan Scale

State Spatial DevelopmentPlan or Programme

1:250.000

Regional Regional Development Plan 1:50.000or1:100.000

Municipal Land use plan 1:10.0001:20.000

Specific plan 1:1.000

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Which role does TIA play?

Check large-scale infrastructure projects at an early stage of planning

• for compliance with the objectives of spatial planning

• for mutual balance of conflicting objectives

• for optimum planning solutions

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Which issues are checked in TIA?

In principle: All relevant issues!

TIAEconomy Environment

Society Culture

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Who participates in TIA?

All relevant stakeholders!

• Project developer

• Spatial planning authority

• Sectoral authorities

• Institutions and NGOs

• Municipalities

• General public

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Which projects are subjected to TIA?

Large-scale development projects...

• which have considerable impact on

regional development

• where alternative options of route /

location can be considered

E.g. highways, high-voltage lines, major windmill parks,

large holiday villages...

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Which procedure does TIA follow?

2. Assessment phase

• Participation (stakeholders / public)

• Optimization of project design

1. Initial phase

Documentation of project and impacts

3. Final phase

Conclusion of TIA:Fully / partly / not in compliance with objectives

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Territorial ImpactAssessment(major steps)

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

TIA , SEA and EIA

TIATerritorial Impact

Assessment

SEAStrategic Environmental

Assessment

EIAEnvironmental Impact

Assessment

Environment Spatial Development

project level

programme level

Main issues :- Collision risk- nature protection- tourism

ExampleWindfarm Baltic 1

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Windfarm Baltic 1 -Bird migration -

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Impact on tourism: spoiled horizon ?

Planned Baltic Sea gas pipeline

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Planned Baltic Sea Pipe Line2 parallel pipe lines

Length: 1200 kmDiameter: 1067 mmPressure: 220 MPaConstruction time: 2008 - 2012

Planned Baltic Sea gas pipeline

Alternative routes

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

What are the benefits of TIA ?1) managing conflicts

by early participation of target groups

2) minimizing negative impacts and costs by optimizing the choice for location / routing / technical planning

3) ensuring planning reliability by giving early and reliable information about realisation chances

4) shortening the whole planning process by pre-checking crucial points

5)  securing spatial planning objectives by the duty to take TIA results into account in the following process

6) supporting local administrations in case of large-scale investments

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

summary:

TIA stands for...

• harmonization of project with all

public interests (incl. EIA)• stakeholder / public participation• pre-check at an early stage of

planning• being conducted by a neutral

authority

Plan Coast Study Tour 7/2007

Bernhard Heinrichs: TIA for offshore projects

Climate Changeuntil 2071

Berlin with an Italian climate

Source: Meteo-FranceDer Spiegel 21/2007

top related