Corporate Presentation
Corporate Presentation Open-pit Gold Heap Leach Project in Ghana July 2015
FORWARD LOOKING STATEMENT
Certain statements in this document constitute “forward looking statements” which may not be based on historical fact. Such forward looking statements involve known and unknown risk, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results to be materially different from any future results, performance, or achievements expressed or implied by such forward looking statements. Such factors include, among others, the following: actual results of exploration and development activities; the estimation or realization of mineral reserves and resources; the timing and the amount of future production; the costs and timing of the development of new deposits; future prices of precious and base metals; accidents; risks inherent in mineral exploration; risks associated with development, construction and mining operations; restrictions on foreign ownership; the Company’s history of operating losses and uncertainty of future profitability; uncertainty of access to additional capital; environmental liability claims and insurance; and dependence on joint venture partners. Mr. Gregory Smith, P. Geo., Vice President of Exploration for Pinecrest Resources Ltd., is the qualified person as defined by NI 43-101 and has prepared and approved the technical data and information in this corporate presentation.
2
ENCHI GOLD PROJECT OVERVIEW
• 1M oz Inferred gold resource open-pit, heap leach project
• Located in Ghana’s prolific Bibiani Sheer zone which is host to several multi-million ounce gold deposits
• Preliminary Economic Assessment (“PEA”) completed in April 2015
• US$1,300 oz gold price: 61,749 oz per year, Pre-Tax NPV5% US$102M, IRR 34% and US$802 oz cash costs (including royalties) After-Tax NPV5% US$62M and IRR 25%
• Ashanti Style, shear hosted mesothermal gold system
• Shallow, near surface resources open in all directions, demonstrating excellent resource expansion and discovery potential
• 568km2 land package with several high priority targets
3
INVESTMENT HIGHLIGHTS
4 1. Inferred resource using a 0.5 g/t Au cut-off grade.
Strong PEA Results
Pre-Tax NPV5%: US$102M Pre-Tax IRR: 34%
Post-Tax5%: US$62M Pre-Tax IRR: 25%
Strong Exploration Upside
Substantially underexplored 696km2 land package located on
prolific Bibiani Shear zone
Over 1M oz Au1
April 2015 NI 43-101 compliant Technical Report
Stable Mining Jurisdiction
Ghana is Africa’s 2nd largest gold producer and the world’s 8th largest
Strong Management Skilled technical team
Strategic Partnerships 19.9% ownership by Kinross Gold 18.2% ownership by Sandstorm
Gold
Financing Acquisition
• Feb 2015 ~A$180M acquisition of Orbis Gold Limited announced
• Feb 2015 C$46M bought deal financing completed
• July 2014 US$150M debt facility with Red Kite Mine Finance Trust I secured
RENEWED FOCUS ON AFRICAN GOLD EQUITIES
African focused gold companies up ~22% year-to-date (“YTD”)
5
Select Transactions in Africa
US$135M US$150M
C$46M
US$63M
• June 2014 US$570M acquisition of Papillion Resources Limited
• Dec 2013 US$63M acquisition of Volta Resources Inc.
• Jan 2014 US$135M stream agreement with Franco Nevada Corporation completed on Senegal gold project
US$570M
A$180M
WEST AFRICAN GOLD DEPOSITS
• Gold assets in West Africa with deposits >0.5M oz Au and <2.0M oz Au
• Opportunity to consolidate nearby West African gold deposits
6
GHANA OVERVIEW
7 Source: 911 Metallurgist and Fraser Institute.
OVER 250 TONS The amount of gold
Ghana has produced in the last 25 years
Biggest gold producer in Africa
8th Biggest gold producer
in the world
$21.5 MILLION Royalties given back to Ghanaian
Communities between 2009 - 2011
$500 MILLION
The amount of tax resulting from gold
produced in Ghana for 2011
70%
The amount of West Africa’s Gold Ghana is
believed to hold
5-10% The amount of Ghana’s labor force
employed by gold mining
2nd
5th The rank among African
countries on Fraser Institute’s Investment Attractiveness Index
CORPORATE OVERVIEW
8
MANAGEMENT, DIRECTORS & KEY ADVISORS
9
GEORGE SALAMIS CHIEF EXECUTIVE OFFICER & DIRECTOR • Raised over $800M in equity and
completed M&A transactions valued over $1BN
• Chairman of Integra Gold Corp. • Senior experience with Placer Dome
Inc. & Cameco Corporation
RYAN KING PRESIDENT & DIRECTOR • Raised over $150M in equity and
completed M&A transactions valued over $500M
• Senior experience with Calibre Mining Corp. Edgewater and Terrane Metals (acquired for $750M)
GREG SMITH, P.GEO VP EXPLORATION • +25 years of exploration experience
for junior and senior mining operations
BLAYNE JOHNSON DIRECTOR • Chairman of Featherstone Capital
Advisors • Senior experience at First Marathon
DOUGLAS FORSTER, P.GEO DIRECTOR • +30 years experience, Senior
experience with over 12 publicly traded companies on N.A. stock exchanges
EDWARD FARRAUTO DIRECTOR • +30 years of experience with
publicly listed mineral exploration and development companies
DANIEL WILSON COUNTRY MANAGER • Senior experience with Ashanti
Gold Fields Corporation and Red Back
DR. JOHN THOMAS TECHNICAL ADVISOR
• 40 years experience, development, engineering and management of construction, and operation of mines
CAPITAL STRUCTURE & OWNERSHIP
10 Source: Capital IQ and SEDI.
Symbol TSX-V: PCR
Closing Price $0.11
Market Capitalization $6M
Shares Outstanding
Basic 54.9M
Options (avg exercise $0.22) 3.8M
Kinross Warrants (avg exercise $0.30) 5.0M
Warrants (avg exercise $0.30) 18.0M
Fully Diluted 81.7M
Fully Diluted Cash ~$11.0M
Working Capital ~$1.8M
Debt -
Fully Diluted Enterprise Value $25.8M
Management & Insiders (15%)
Capital Structure Top Shareholders
ENCHI GOLD PROJECT OVERVIEW
11
REGIONAL SETTING
• Pinecrest’s flagship Enchi Gold Project is located on the prolific Bibiani Shear zone which hosts multi-million ounce gold deposits − Enchi Gold Project covers 50km of the Bibiani Shear Zone
• Located within 70km of Kinross Gold Corporation’s Chirano gold mine which produced 286,542 oz Au in 2014
12
Bibiani Deposit Chirano Deposit
Ahafo Deposit
Esaase Deposit Obotan Deposit
Ashanti Deposit Perseus Deposit
Tarkwa Deposit
ENCHI GOLD PROJECT OVERVIEW
• 100%1 owned resource delineation stage gold project
• April 2015 NI 43-101 compliant Technical Report with an Inferred resource of +1M oz Au
• Substantially underexplored 696km2 land package
− VTEM airborne geophysical survey identified over 25 new exploration targets
• Resource zones Boin, Nyam and Sewum open in all directions
13 1. Subject to a 10% carried interest to the Ghana government.
Gold Producers
ENCHI MINERAL RESOURCE ESTIMATE (2015)
The April 2015 Mineral Resource estimate was based on 52,385 metres of diamond and RC drilling in 646 holes as well as data from 13,799 metres in 102 surface trenches. The drilling is spaced at 25 to 50 metre intervals 1. CIM definition standards were followed for the resource estimate. 2. The April 2015 resource models used ordinary kriging (OK) grade estimation within a three-dimensional block model with mineralized zones defined by wireframed solids. 3. A base cut-off grade of 0.5 g/t Au was used for reporting resources with a capping of gold grades at 18 g/t. 4. A US$1,300/ounce gold price, open pit with heap leach operation was used to determine the cut-off grade. 5. A density of 2.45 g/cm3 was applied. 6. Numbers may not add exactly due to rounding. 7. Mineral Resources that are not mineral reserves do not have economic viability.
14
Inferred Resource
Cutoff (g/t Au) Tonnes Gold (g/t) Contained Gold (oz)
0.30 72,611,000 0.65 1,526,065
0.40 53,366,000 0.76 1,304,918
0.50 37,357,000 0.90 1,078,697
0.70 20,816,000 1.15 768,000
0.90 12,933,000 1.36 569,879
1.00 10,127,000 1.49 484,388
EXPLORATION POTENTIAL
• Several high priority gold targets identified to expand the already substantial +1 million gold ounces near surface oxide resource with multi-million ounce opportunities
15
ENCHI NEAR SURFACE RESOURCE EXPANSION OPPORTUNITY
16
BOIN CLEAR EXPANSION OPPORTUNITY
17
BOIN PIT SHELLS Opportunity to expand resources between zones
BOIN GOLD ZONE Near surface oxide potential to expand with clear drilling gaps
MULTIPLE UNTESTED TARGETS
• Regional airbone study completed by Condor Geophysics • Several structures appear to correlate to known mineralization, while many other similar structure patterns
remain untested • Current resource zones only make up a small fraction of total land package – significant opportunity to expand
18
PEA OVERVIEW
19
Disclosure The NI 43-101 Preliminary Economic Assessment is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the Preliminary Economic Assessment will be realized. The Enchi Gold Project PEA Technical Report is available on SEDAR and was prepared by Joanne Robinson P.Eng of WSP Canada a professional independent mining engineer registered in Canada and a QP as defined by National Instrument 43-101. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
2015 PEA HIGHLIGHTS
20
*2.0% NSR to Kinross Gold and US$10 for each newly defined ounce of gold contained in any new NI 43-101 M&I mineral resource estimate or any ounce of gold mined, whichever occurs first. Such amount shall be payable in cash or, at Pinecrest’s option, in common shares of Pinecrest, provided that, Pinecrest shall not be entitled to elect to pay in common shares if such issuance would result in Red Back holding more than 20% of the issued and outstanding shares of Pinecrest. The Ghana government has a 10% free carry and a 5% royalty.
Average Annual Production (Au ounces) 61,749
Metallurgical Recoveries (Oxide/Transition/Sulphide %) 75/75/73%
Strip Ratio (w/o) 3.16
Mine Life (years) 8.7
Pre-Production Capital Costs (US$) $84.4M
LOM Sustaining Capital Costs (US$) $38.6M
LOM Cash Cost per Ounce (US$/oz) $802.03
US$1,200/oz US$1,250/oz US$1,300/oz US$1,350/oz
Pre-Tax Payback (years) 3.4 3.0 2.8 2.7
Pre-Tax IRR (%) 24% 29% 34% 38%
Pre-Tax NPV5% (US$) $61.9M $81.9M $101.9M $121.9M
After-Tax Payback (years) 4.1 3.7 3.4 3.1
After-Tax IRR (%) 18% 22% 25% 29%
After-Tax NPV5% (US$) $35.9M $49.0M $62.0M $75.0M
Enchi Gold Project April 2015 PEA – Base Case US$1,300/oz*
MINED TONNES, GOLD GRADE AND STRIP RATIO
21
PRE-PRODUCTION CAPITAL COSTS
22
US$84.4M
US$35.6M 42% Processing
US$18.8M 22% Mining
US$4.4M 5% Infrastructure
US$4.9M 6%
Engineering & Procurement
US$5.9M 7%
Construction (Indirect)
US$3.1M 4%
Owner’s Costs
US$11.8M 14%
Contingencies
23
SITE LAYOUT
24
PROCESS DESIGN
NEXT STEPS
25
NEXT STEPS & OPPORTUNITIES
26
Initiate Environmental Baseline studies
Complete metallurgical test work (heap leach opportunity)
Advance towards Prefeasibility Study, EIS, additional drilling and evaluate contract mining options to reduce initial capital and enhance already attractive project economics
Expand current resources at Sewum, Nyam and Boin deposits both along strike and at depth
Additional exploration work on high priority gold targets (Eradi, Kojina Hill (1.14 g/t Au over 68 metres)
Test multiple new drill targets identified by VTEM airborne survey