nash harbor, wak-i06 - alaska dec · personnel/shift wavecut platform, 7 ea. vessel crew/general...
Post on 10-Oct-2020
3 Views
Preview:
TRANSCRIPT
This is not intended for navigational use.
Geo
gra
ph
ic R
esp
on
se S
trate
gie
s fo
rW
est
ern
Ala
ska S
ubare
a, Is
lan
d Z
on
e
NUKA Research & Planning Group, LLC.June 26, 2012
Lege
ndMap
Aerial photography of this area is unavailable at this time, but may be included as it becomes available.
An example of the Free-oil Recovery Tactic. Actual deployment should be adjusted for local conditions.
An example of the Exclusion Booming Tactic. Actual deployment should be adjusted for local conditions.
Possible Recovery Point
Tidal-seal Boom
Tidal-seal Boom
INLET
V-Boom Configuration
Tow Vessel with containment boom
Towed Recovery Device or Vessel
Scale
2 nm2 mi.
2,000 yds.
Nash Harbor
FO-S02
FO-S02
01dEX
01cEX
01bEX
01aEX
Nash Harbor, WAK-I06Center of map at 60˚ 13.06' N Lat., 166˚ 52.90' W Lon.
Free-oil Recovery
Exclusion Booming
FO-S
EX
Protected-water Boom
Tidal-seal Boom
NUKA Research & Planning Group, LLC.NOTE: Sensitive resource information can be found on other maps which can be accessed through the sensitive area section of the Western Alaska Subarea Contingency Plan: http://dec.alaska.gov/spar/perp/plans/scp_wak.htm.
Site
Inf
orm
atio
n fo
r W
este
rn A
lask
a, W
AK
-I06
Western Alaska Subarea Geographic Response Strategies DRAFT June 2012
WAK-I06
ID Location and Description Response Strategy Implementation Response Resources Staging Area Site Access
Resources Protected (months)
Special Considerations
I-06-01
EX
Nash Harbor
a. Lat. 60° 12.29'N Lon. 166°56.34'W
b. Lat. 60° 12.19'N Lon. 166°51.10'W
c. Lat. 60° 13.38'N Lon. 166°48.45'W
d. Lat. 60° 14.20'N Lon. 166°47.70'W
Exclusion
Exclude oil from impacting the identified streams in Nash Harbor.
Deploy anchors and boom with skiffs (class 6) at high tide.
Place protected water boom in a chevron pattern in front of the entrances to the streams. Complete each array by placing 60 ft. of tidal seal boom on each leg.
Tend throughout the tide.
Boom Lengths:
a. 250 ft
b. 200 ft
c. 400 ft
d. 200 ft
Deployment Equipment
1050 ft. protected-water boom 480 ft. tidal seal boom 5 ea. anchor systems 16 anchor stakes
Vessels 1 ea. class 3 2 ea. class 6
Personnel/Shift 7 ea. vessel crew/general techs Tending
Vessels 1 ea. class 3 1 ea. class 6
Personnel/Shift 3 ea. vessel crew/general techs
Vessel Platform
Via marine waters
Chart 16006
Fish- intertidal spawning-salmon (June-Sept.)dolly varden, arctic char
Birds-waterfowl, seabird and shorebird nesting
Habitat- exposed rocky shore, marsh, peat shoreline, Exposed wavecut platform, sheltered tidal flats
Human use-subsistence
Vessel master should have local knowledge.
Title 41 permitting required from ADNR.
Surveyed: not yet
Tested: not yet
I-06-02
FO-S
Nash Harbor
Nearshore waters in the general area of:
Lat. 60° 13.06'N Lon. 166°52.90'W
Free-oil Recovery
Maximize free-oil recovery in the offshore & nearshore environment of Nash Harbor depending on spill location and trajectory.
Deploy free-oil recovery strike teams upwind and up current of the Nash Harbor.
Use aerial surveillance to locate incoming slicks.
Deploy multiple free-oil recovery strike teams as required to maximize interception of oil before it impacts sensitive areas.
Mekoryuk Via marine waters
Chart 16006
Same as I-06-01 Vessel master should have local knowledge.
Use extreme caution, shallow waters with numerous submerged hazards.
top related