Michigan Bridge Conference2015

Michigan Bridge ConferenceMarch 2015 - FHWA

UpdateMetrics:

• Results – 15/23 in compliance• Inventory – new, closed, and missing bridges • UW Inspections – review for correct coding• FHWA OIG audit 2/15/2015

LAP Bridges:• FHWA “Strategic Goal – Program Delivery” for PY

2016 includes LPA Administration of projects• 2012 Program review for Bridge Design QC/QA

to current LAP QA review

2015 Likely Focus Areas Critical Path Management ◦ (CIR finding)

Maintaining pedestrian traffic◦ (CIR and CAP finding)

Utility delays ◦ (CIR finding)

Job site posters ◦ (CIR and CAP finding)

2 CFR 200 (OMB)streamlines guidance on administrative and audit

requirements and cost principles for Federal awards

• New: Went into effect 12/26/2014• Cancels 49 CFR Parts 18 & 19• Requires a period of performance in the

agreement defining project start and end dates

• Establishes greater responsibilities for sub-recipient (LPA) monitoring

Inactive Projects

•Currently required as part of 23 CFR 630.106

•FHWA Policy to enforce

SHRP2 Education ConnectionRound 5 Implementation

Save lives.

Save money.

Save time.

• Nondestructive Testing for Concrete Bridge Decks (R06A)

• Innovative Bridge Designs for Rapid Renewal (R04) – Prefab Elements

• Service Life Design for Bridges (R19A)• - select durable bridge systems• Performance Specifications for Rapid

Renewal (R07)

State-based model to identify and rapidly deploy, proven but underutilized innovations to shorten the project delivery process, enhance roadway safety, reduce congestion and improve environmental sustainability.

What is EDC?

Focused, State-based approach for rapid deployment of proven

innovations

Every Day Counts (EDC)

10

Other Proven

InnovationsAASHTO

TIG

Accelerated Innovation Deployment (AID) Program

AID Demonstration Grant

• MDOT received $1,000,000 award for the US 131 @ 3 Mile Bridge Slide

Accelerated Innovation Deployment (AID) Program

AID Demonstration Grant

• MDOT/Dickinson Co. Road Commission received $600,000 award for hot in-place recycling to rehabilitate 4.5 miles of road in Kingsford.

https://www.youtube.com/watch?v=UKNVKa6WoTI&feature=youtu.be

The 3rd Round of Every Day Counts: features ELEVEN technologies and practices that can shorten the project delivery process, enhance safety and improve environmental sustainability.

• Ultra-High Performance Concrete connections

• GRS-IBS• e-Construction• e-NEPA and IQED• Road Diets• Smarter Work Zones• Data-Driven Safety Analysis

EDC-3 Innovations (2015-2016)