I. COMPANY PROFILE
II. STATEMENT OF PROBLEM
The local government of Quezon City is opening a bid for a project which is a proposed
construction of a pedestrian underpass located on Quezon Memorial Circle Promenade Area
and Main Entrances at Brgy. Vasra, Quezon City. The contractor may be any individual, form,
corporation, partnership or association who, by agreement with the local government of
Quezon City, will furnish the materials and/or labor, tool, equipment, plant and other
facilities needed for the completion of the project subject to the accompanying plans and
working drawings. Before submitting a bid, the contractor should first carefully examine the
premises in order to have full knowledge of conditions existing therein.
Since this is a project which would require closing down certain areas and roadways, the
project would entail inconveniences before its completion. That being the case, the local
government of Quezon City aims to find the contractor which would be able to meet all the
qualifications and requirements while being able to provide the fastest and most efficient
time frame for the project’s completion. The Contractor shall prepare and submit a
comprehensive work schedule covering the entire duration of the construction, including
the estimated number of days within which the project shall be finished.
III. BRIEF DESCRIPTION OF QA TECHNIQUE APPLICABLE
IV. APPLICATION OF MODEL
ResultsTask Early Start Early Finish Late Start Late Finish Slack
A 0 2 0 2 0B 0 1 1 2 1C 2 3 2 3 0D 3 7 3 7 0E 7 9 8 10 1F 7 10 7 10 0G 7 9 8 10 1H 10 12 10 12 0I 12 16 12 16 0J 16 18 16 18 0
Project 18
Early start computationsA 0 0 0 0 0 0B 0 0 0 0 0 0C 2 1 0 0 0 0D 3 0 0 0 0 0E 7 0 0 0 0 0F 7 0 0 0 0 0G 7 0 0 0 0 0H 9 10 9 0 0 0I 12 0 0 0 0 0J 16 0 0 0 0 0