1Amulsar – Path to ProductionNovember 2016 – Photo Journal

Lydianinternational.co.uk | TSX:LYD

2

Topsoil Removal at the Camp Platform.

3

Excavation for the Temporary Construction Office / Contractor Laydown Area Platform

4

Initial Upgrades to RD-5 from Gndevaz to Site 14

5

Sediment Control Near the Temporary Construction Offices Platform, at the Base of the HLF

Sediment Control on the Extended Side of the Temporary Construction Offices Platform

6

Widening of RD-5

7

Ripping and Removal of Materials as Part of Access Road Construction

8

RD-5 Widening

9

Slope Cutting and Material Removal

10

Re-Routed Powerline Near the HLF