LHC Sync. Light Monitors Status and Plans. 05 Feb 2014 Emittance Meeting (~= BI-TB Jan 2014) F.Roncarolo A.Goldblatt , G.Trad , E.Bravin , S.Mazzoni , W.Andreazza , G.Shneider,M.Wendt , N.Chritin. Overview. BSRTM Design Option A: original design with ceramic pieces - PowerPoint PPT Presentation

TRANSCRIPT

LHC Sync. Light Monitors Status and Plans

05 Feb 2014Emittance Meeting (~= BI-TB Jan 2014)

F.RoncaroloA.Goldblatt, G.Trad, E.Bravin, S.Mazzoni, W.Andreazza,

G.Shneider,M.Wendt, N.Chritin

2Federico Roncarolo

Overview

• BSRTM Design– Option A: original design with ceramic pieces– Option B (BASELINE): Longer mirror, support behind RF screen, all metal

• Optics– Low wavelength optics– Interferometer (B1 only)

• New calibration line (B1 only)• Change tank support from ‘chair’ to 3 pillars (B1 only?)• New light shielding

• SW– New functionalities to cope with new optics layout– Filter wheels pneumatic IN-OUT– Interferometer– Possible request of tomography meas. (ABP) fastest and synchronized

camera acquisition• Discussion on Digital Cameras

3Federico Roncarolo

New Calibration Line BSRTR B1

4Federico Roncarolo

New Calibration Line BSRTR B1

ECR circulatingSystem (BSRTR = BTVSI modified) in productionexpected delivery: MarchScheduled installation: March

Components outside vacuum to be ordered, not critical, will be installed fall 2014

5Federico Roncarolo

BSRTM Option A (ceramic)

• 2 systems in fabrication• Expected delivery• Keep as backup solution

Mirror holder components (except springs)

made in ceramic

6Federico Roncarolo

BSRTM Option B

• BASELINE Option• ECR submitted• 2 systems in fabrication• Expected Delivery: February• Schedule

– RF tests in the LAB?– To TE-VSC for testing: 15 March– Installation: April ?

For both option A and B, see BI-TB Oct 2013 for details on RF studies

7Federico Roncarolo

Tank Support

• Decision: change B1 support from ‘chair’ to 3 pillars (existing) to free space on optical table

Proposal: change B2 immediately, to free space for halo monitor

8Federico Roncarolo

Optics Layout

9Federico Roncarolo

New mirrors

• 2 mirrors compatible with option B, coating visible : arrived, backup solution

• 3 mirrors with coating in the UV (down to 230nm) for option A + 3 for Option B– Expected delivery end of February– Can be the bottleneck for scheduling

10Federico Roncarolo

New Light Shielding

11Federico Roncarolo

Digital Cameras

12Federico Roncarolo

Summary

13Federico Roncarolo

14Federico Roncarolo

https://espace.cern.ch/be-dep-bi-tb/Lists/Calendar/Attachments/840/LHC%20PROPOSAL.pptx

https://dfs.cern.ch/dfs//Departments/AB/Groups/BI/Sections/PM/Projects/LHC/BSR/Docs-Litterature-Publications/BSRTWG/2013-09-10/BSRT_WakefieldAnalysis.pptx

RF Simu (M.Wendt)

top related