Lean Project Delivery Fundamentals Workshop

Become certified by LCI-Canada in Lean Project Delivery Fundamentals

mguy@i-designs.ca or more info www.leanlab.ca

Traditional Lean Project Delivery

Over Budget, Late NetZero, Early Completion

Can we learn from Toyota?

How much success?

05/03/2023 LCI-C Overview 4

Is there a LEAN for Construction?

Greg Howell

Glen Ballard

2002

LCI-C Certification Program

WHY not provide Training in 3 levels? 1. Lean Fundamentals (Beginner)

– Make the Business Case for LPD– Understand the Basics– Exam for Certification

2. Lean Coordinator (Learning to Swim)– Competency in Lean Systems and Practices– Experience implementing LPD on projects– Exam/Document Experience/References

3. Lean Facilitator (Leading Others)– Competency to lead teams in the implementation of LPD Systems– Experience implementing LPD systems on three projects– Exam/Document Experience/References

Ok, Lets start with ...

Business Caseo Why Lean?o What is Possible ? o Show me the Money (Case Studies)

A way of THINKING?... Culture? … System?

Build a Good Foundation

Principles and Practiceso Valueo Flowo Efficiency

Moneyball

What does Beane know about Lean?

Billy Beane Keynote at LCI San Francisco

We also need to understand Lean works for all Projects

• Design/Bid/Build Least potential for value success

• Design/Build Fair opportunity for value success

• Construction Manager Fair opportunity for value success

• P3 High potential

• Lean/Integrated Project Delivery Greatest potentialCharles Pankow Foundation and Construction Industry Institute USA Report

Design-Tender-Bid Developer/CM

After Lean: LEED Gold On Budget• Save $1.6M plus used $600k of contingency

• Key: Wood to concrete structure

• Amazing results: Still delivering LEED Gold 50% less energy

with a $100k contingency

It takes a TEAM Effort

Before Lean: $2.2M Over

Next … Send the TEAM to BOOT CAMP

How does Variability affect work flow?

Next … Dice Game Simulation

We need to lean how to SEE the Seven + 1 Wastes

+ under utilized human capital

LPD 101: Lean Project Delivery Fundamentals

• Business Caseo Why Lean?o What is Lean? o Does it work for the Building Industry ?

• Hands on Simulationso Airplane Game Simulation 1 & 2o Dice Game o Lean Fundamentals

• Lean Project Delivery Systems Overviewo Last Planner Systemo Target Value Designo Pull Planning

Next Workshop Jan 27th SaskatoonLast Planner System BOOT CAMP

Overview [www.lcicanada.ca]