Leaning Project Delivery

Altering the “Cost = Risk” Equation

Agenda1.Design Technology2.Construction Technologies3.The “Risk = Cost” Equation

The Design Partnership LLP

Architects + Planners

Waste Reduction

• 40% of US solid waste stream is construction waste.1

1. US Green Building Council

Image courtesy of Washington Times.

The Design Partnership LLP

Architects + Planners

Waste Reduction

The Design Partnership LLP

Architects + Planners

1. Design Technology

• Virtual Simulation/Pre-visualization

• Building Information Modeling (BIM)

• Clash Detection (Pre-coordination)

The Design Partnership LLP

Architects + Planners

Virtual EnvironmentsPre-visualization

Simulation

The Design Partnership LLP

Architects + Planners

The Design Partnership LLP

Architects + Planners

Virtual Equipment Simulation

The Design Partnership LLP

Architects + Planners

Design Visualization

The Design Partnership LLP

Architects + Planners

Design Visualization

The Design Partnership LLP

Architects + Planners

Simulation & Virtual Prototyping

• Test Equipment Layout for Critical Spaces– Surgery Suites– Nurse Stations

• Test Sightlines• Test Processes• Test Aesthetics

Reduced waste of User Changes after construction.

The Design Partnership LLP

Architects + Planners

Building Information Modeling (BIM)

The Design Partnership LLP

Architects + Planners

BIM is a Database

The Design Partnership LLP

Architects + Planners

Building Information Modeling (BIM)

The Design Partnership LLP

Architects + Planners

BIM is a 3D Database

The Design Partnership LLP

Architects + Planners

A Federated Model

The Design Partnership LLP

Architects + Planners

• Reduced Document Coordination Effort• No duplication of effort between A/E• Real-time Project Metrics

Time for Efficient Design & Systems Coordination

Documentation Waste

The Design Partnership LLP

Architects + Planners

Clash Detection(Pre-coordination)

The Design Partnership LLP

Architects + Planners

3D Laser Survey

The Design Partnership LLP

Architects + Planners

Clash Detection & Coordination

Where is the coordination

error?

Structural Plan

Mechanical Plan

The Design Partnership LLP

Architects + Planners

The Design Partnership LLP

Architects + Planners

Rework Waste Prevention

• Coordination with existing conditions• Coordination between building systems• Increased systems awareness• Architects & Engineers (and sometimes

the contractor and subcontractors) communicate and share knowledge

Reduced waste of rework due to spatial coordination.

The Design Partnership LLP

Architects + Planners

2. Construction Technology

• 3D Shop Drawings• Direct Fabrication• Prefabrication• Capabilities

The Design Partnership LLP

Architects + Planners

3D Shop Drawings

The Design Partnership LLP

Architects + PlannersImage courtesy of Marelich Mechanical

The Design Partnership LLP

Architects + PlannersImage courtesy of Marelich Mechanical

The Design Partnership LLP

Architects + Planners

Direct Fabrication

The Design Partnership LLP

Architects + PlannersImages courtesy of Marelich Mechanical

Direct Fabrication

The Design Partnership LLP

Architects + Planners

Direct Fabrication

The Design Partnership LLP

Architects + Planners

Direct Fabrication

The Design Partnership LLP

Architects + Planners

Direct Fabrication

The Design Partnership LLP

Architects + Planners

Prefabrication

The Design Partnership LLP

Architects + Planners

Prefabrication

The Design Partnership LLP

Architects + Planners

Just-in-time Delivery

The Design Partnership LLP

Architects + Planners

Prefabrication

The Design Partnership LLP

Architects + Planners

Prefabrication

The Design Partnership LLP

Architects + Planners

Prefabrication

The Design Partnership LLP

Architects + PlannersImage courtesy of Marelich Mechanical

The Design Partnership LLP

Architects + Planners

The Design Partnership LLP

Architects + PlannersImage courtesy of Marelich Mechanical

The Design Partnership LLP

Architects + Planners

The Design Partnership LLP

Architects + Planners

Construction Waste Prevention

• Material efficiency algorithms• No part duplication/no lost parts• Reduced labor with direct fabrication• No storage/ just-in-time delivery• Prefabrication labor in shop

Reduced waste of due to field labor.

The Design Partnership LLP

Architects + Planners

Capabilities

The Design Partnership LLP

Architects + Planners

3D Capable Trades

• HVAC• Plumbing• Structural Steel• Precast Concrete• Rebar• Steel Stud Walls• Curtain Walls, etc.• Millwork• Unit Restrooms• Laboratories

The Design Partnership LLP

Architects + Planners

Relative Sophistication DisparityGeneral Contractors (Very Low to Low)

Engineers (Very Low to Moderate) Architects (Low to Moderate) Subcontractors (Varies, some extremely

high)

Maximize advantage of sophisticated players

Enhance process for Subs already using 3D

Mentor less advanced members Integrated Project Delivery

The Design Partnership LLP

Architects + Planners

3. “Risk = Cost” Equation

• Decrease in Contractor’s Risk• Decrease in Owner’s Risk• Increase in Architect’s

Exposure• Reduced Risk for All = Reduced

Cost

The Design Partnership LLP

Architects + Planners

Automatic Document Coordination

3D Systems Coordination

Virtual Building Simulation

Direct Fabrication

Project Delivery Improvement

The Design Partnership LLP

Architects + Planners

The Big BIM/IPD/Lean Idea

The Design Partnership LLP

Architects + Planners

Reduced Coordination Errors Reduced Unknown Conditions More Efficient Workflow Cooperation & Collaboration Reduced Contingency

Increased Confidence & Reduced Risk

Decrease in Contractor’s Risk

The Design Partnership LLP

Architects + Planners

Decrease in Owner’s Risk Reduced Bids Due To Reduced

Contractor Risks Reduced Risk Of

– Change Orders From Unknown Conditions

– Coordination Changes– Fighting Among AEC Entities

Reduced User Changes Due To Better Pre-visualization And Planning

Reduced Risk

The Design Partnership LLP

Architects + Planners

Unknown Consequences Of Sharing BIM Information

Design Only Information In BIM ModelExtensive Pre-coordinationFabrication From Design Models

Increased Exposure to Risk

Increase in Architect’s Exposure

The Design Partnership LLP

Architects + Planners

Reduced Risk for All = Reduced Cost

Architect’s Exposure However

Architect’s Risk

THE DESIGN

PARTNERSHIP Architects + Planners

Sincerely,Eric Peabody

Questions?