To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

D D

D D

G G

G G

G G

M M

M M

M M

A A

A A

L

L L

L L

L L

L

Process LayoutProcess Layout

Chapter 7Chapter 7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Implementchanges

6

Redesign Process (Revise layout)

5

Redesigning a Process Redesigning a Process Through Layout RevisionThrough Layout Revision

Documentprocess

3

Definescope

2

Evaluateperformance

4

Figure 7.1Figure 7.1

Identify opportunity

1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Absolute LocationsAbsolute Locations

(a) Original layout(a) Original layout

Frozen foods

Dry groceries

Bread Vegetables

Meats

Figure 7.2Figure 7.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Absolute LocationsAbsolute Locations

(b) Revised layout(b) Revised layout

Frozen foods

Dry groceries

BreadVegetables

Meats

Figure 7.2Figure 7.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Layout TypesLayout Types

FoundryMilling

machines

LathesGrinding

Painting Drills

Office

Welding

Forging

(a) Layout of a job shop(a) Layout of a job shopFigure 7.3Figure 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Layout TypesLayout Types

(b) Layout of a production line(b) Layout of a production line

Figure 7.3Figure 7.3

Station 1 Station 2 Station 3 Station 4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Group TechnologyGroup Technology

Machine 1

Machine 2

Machine 3

Machine 4Machine

5

Materials in

Finished goods out

Figure 7.4Figure 7.4

One Worker, Multiple MachinesOne Worker, Multiple Machines

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Group TechnologyGroup Technology

Figure 7.5Figure 7.5

Drilling

D D

D D

Grinding

G G

G G

G G

Milling

M M

M M

M M

Assembly

A A

A A

Lathing

Receiving and shipping

L

L L

L L

L L

L

(a) Jumbled flows in a job shop without GT cells(a) Jumbled flows in a job shop without GT cells

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Group TechnologyGroup Technology

(b) Line flows in a job shop with three GT cells (b) Line flows in a job shop with three GT cells

Cell 3

L M G G

Cell 1 Cell 2

Assembly area

A A

L M DL

L MShipping

D

Receiving

G

Figure 7.5Figure 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Department Area Needed (ft2)

1. Administration 3,5002. Social services 2,6003. Institutions 2,4004. Accounting 1,6005. Education 1,5006. Internal audit 3,400

Total 15,000

100'

150'

Office of Budget Office of Budget ManagementManagement

3 6 4

1 2 5

Figure 7.6Figure 7.6

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Office of Budget Office of Budget ManagementManagement

Trips between Departments

Department 1 2 3 4 5 6

1. Administration —

2. Social services —

3. Institutions —

4. Accounting —

5. Education —

6. Internal audit —

3 6 5 6 10

8 1 1

3 9

2

1

100'

150'

3 6 4

1 2 5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Office of Budget Office of Budget ManagementManagement Departments 1 and 6 close together Departments 3 and 5 close together Departments 2 and 3 close together

Figure 7.7Figure 7.7

100'

150'

1 5

6

100'

150'

3 6 4

1 2 5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Office of Budget Office of Budget ManagementManagement Departments 1 and 6 close together Departments 3 and 5 close together Departments 2 and 3 close together

Figure 7.7Figure 7.7

100'

150'

1 5

6 3

100'

150'

3 6 4

1 2 5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Office of Budget Office of Budget ManagementManagement Departments 1 and 6 close together Departments 3 and 5 close together Departments 2 and 3 close together

Figure 7.7Figure 7.7

100'

150'

1 5

6 32

4

100'

150'

3 6 4

1 2 5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Office of Budget Office of Budget ManagementManagement

100'

150'

3 6 4

1 2 5

Departments 1 and 6 close together Departments 3 and 5 close together Departments 2 and 3 close together

Figure 7.7Figure 7.7

100'

150'

1 5

6 32

4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Distance MeasuresDistance Measures

Euclidian DistanceEuclidian Distance

Rectilinear DistanceRectilinear Distance

ddABAB = (= (xxAA –– x xBB))22 + ( + (yyAA – – yyBB))22

ddABAB = |= |xxAA –– x xBB| + || + |yyAA – – yyBB||

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Office of Budget Office of Budget ManagementManagement

100'

150'

3 6 4

1 2 5

Load Distance Analysis

Current Plan Proposed Plan

Dept Closeness Distance DistancePair Factor, w d wd Score d wd Score

1,2 3 1 3 2 61,3 6 1 6 3 181,4 5 3 15 1 51,5 6 2 12 2 121,6 10 2 20 1 102,3 8 2 16 1 82,4 1 2 2 1 12,5 1 1 1 2 23,4 3 2 6 2 63,5 9 3 27 1 94,5 2 1 2 1 25,6 1 2 2 3 3

ld =112 ld = 82Example 7.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Office of Budget Office of Budget ManagementManagement

100'

150'

3 6 4

1 2 5

Figure 7.8Figure 7.8

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Office of Budget Office of Budget ManagementManagement

100'

150'

3 6 4

1 2 5

Figure 7.9Figure 7.9

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Out-and-Back WarehouseOut-and-Back Warehouse

Figure 7.10Figure 7.10

Dock Aisle

Storage area

Storage area

3 5 5 6 4 2 7

1 5 5 4 4 2 7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Zone SystemsZone Systems

Figure 7.11Figure 7.11

Click to add titleZones Zones Control

station Shipping doors

Tractor trailer

Tractor trailer

Overflow

Feeder lines

Feeder lines

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing

Green Grass, Inc.Green Grass, Inc.Big BroadcasterBig Broadcaster

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

A

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

3030

B

A

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

5050

B

C

A

3030

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

5050

3030

4040

D

B

C

A

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

66

5050

E3030

4040

D

B

C

A

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

66

5050

E3030

2525

4040

D

B

FC

A

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

66

5050

1515

E3030

2525

4040

D

B

FC

A

G

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

66

2020

5050

1515

E3030

2525

4040H

D

B

FC

A

G

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 3030 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G

TotalTotal 244244

WorkWork TimeTime ImmediateImmediateElementElement DescriptionDescription (sec)(sec) Predecessor(s)Predecessor(s)

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Example 7.3Example 7.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

Figure 7.12Figure 7.12

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

Example 7.4Example 7.4

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Desired output rate = 2400/weekPlant operates 40 hours/week

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Desired output rate = 2400/weekPlant operates 40 hours/week

r = 2400/40 = 60 units/hour

Example 7.4Example 7.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Desired output rate = 2400/weekPlant operates 40 hours/week

r = 2400/40 = 60 units/hour

c = 1/60 = 1 minute/unit= 60 seconds/unit

Example 7.4Example 7.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unit

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Desired output rate = 2400/weekPlant operates 40 hours/week

Example 7.4Example 7.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unit

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Desired output rate = 2400/weekPlant operates 40 hours/week

TM = 244 seconds/60 seconds= 4.067 or 5 stations

Example 7.4Example 7.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unit

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Desired output rate = 2400/weekPlant operates 40 hours/week

TM = 244 seconds/60 seconds= 4.067 or 5 stations

Efficiency = [244\5(60)]100 = 81.3%

Example 7.4Example 7.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Desired output rate = 2400/weekPlant operates 40 hours/week

TM = 244 seconds/60 seconds= 4.067 or 5 stations

Efficiency = [244\5(60)]100 = 81.3%

Example 7.4Example 7.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

4040

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

40

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

40

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

40

66

2020

5050

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

S2 B,C C 50 10

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

40

66

2020

50

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

S2 B,C C 50 10

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

S240

66

2020

50

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

S2 B,C C 50 10

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

S240

66

2020

50

1515

1818

E3030

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

S2 B,C C 50 10

S3 B,F,G B 30 30

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

S240

66

2020

50

1515

1818

E30

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

S2 B,C C 50 10

S3 B,F,G B 30 30

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

S240

66

2020

50

1515

1818

E30

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

S2 B,C C 50 10

S3 B,F,G B 30 30

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

S240

66

2020

50

1515

1818

E30

2525

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

S2 B,C C 50 10

S3 B,F,G B 30 30E,F,G F 55 5

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

S1

S2

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

40

66

2020

50

1515

1818

E30

25

4040H

I

D

B

FC

A

G

Cumm IdleStation Candidate Choice Time Time

S1 A A 40 20

S2 B,C C 50 10

S3 B,F,G B 30 30E,F,G F 55 5

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

S2S3

40

66

2020

50

1515

1818

E30

25

4040H

I

D

B

FC

A

G

S1 A A 40 20

S2 B,C C 50 10

S3 B,F,G B 30 30E,F,G F 55 5

Cumm IdleStation Candidate Choice Time Time

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1S3

S240

66

2020

50

1515

1818

E30

25

4040H

I

D

B

FC

A

G

Example 7.5Example 7.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Line BalancingLine Balancing Big BroadcasterBig Broadcaster

cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%

S1

S2S3

S5S4

Figure 7.13Figure 7.13

40

6

20

50

15

18

E30

25

40H

I

D

B

FC

A

G

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Solved Problem 1Solved Problem 1

B FE

A C D B

FE

A

C

D

Figure 7.14Figure 7.14 Figure 7.15Figure 7.15

TRIPS BETWEEN DEPARTMENTSDEPT A B C D E F

A — 8 3 9 5B — 3C — 8 9D — 3E — 3F —

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved.

Solved Problem 2Solved Problem 2

2020

E

145145

H

130130

I

2525

D

8080

B

1515

F

5050

C

4040

A

120120

G115115

J

Figure 7.16Figure 7.16