kangaroo ground - st andrews rd...garden bed (rock work) existing post and rail 198.73+ concrete...
Post on 17-Jun-2020
5 Views
Preview:
TRANSCRIPT
Cricket Nets
V
e
r
a
n
d
a
h
General
Store
Primary School
R
O
D
G
E
R
R
O
A
D
E
x
i
s
t
i
n
g
S
c
h
o
o
l
C
r
o
s
s
i
n
g
Bin
Bin
Garden
Garden
V
e
r
a
n
d
a
h
Petrol
Bowser
NEW BLUESTONE
STEPS 3M WIDE (3 X 140MM
RISERS, 300MM TREAD - PAVERS)
NEW BLUESTONE
KERB AND CHANNEL
NEW CONCRETE
PATH (1.2M WIDE)
NEW BLUESTONE
KERB AND CHANNEL
e.pole
NEW ASPHALT
SEALED CAR
PARKS
NEW SH RED
BRICK PAVERS
NEW ASPHALT
(GRADE EVENLY)
R
E
-
A
S
P
H
A
L
T
P
A
T
H
A
T
E
X
I
S
T
I
N
G
G
R
A
D
E
+200.10
2
%
F
A
L
L
NEW BLUESTONE
BLOCKWORK TO FACE
BOWSER PLATFORM
NEW BLUESTONE
KERB AND CHANNEL
(MATCH INTO EXISTING)
NEW BLUESTONE
KERB AND CHANNEL
(MATCH INTO EXISTING)
NEW BLUESTONE
KERB AND CHANNEL
(MATCH INTO EXISTING)
NEW CONCRETE
EDGESTRIP
(200MM WIDE
K
A
N
G
A
R
O
O
G
R
O
U
N
D
-
S
T
A
N
D
R
E
W
S
R
D
NEW BLUESTONE
BLOCK WORK RE WALL
(2 BLOCKS HIGH)
RAISE /MODIFY
EXISTING PIT
NEW PRAM
CROSSINGS
NEW PRAM
CROSSING
+198.80
+198.93
+198.40
+199.00
+198.60
8
.
5
%
F
A
L
L
COR TEN SCREEN
(BY OTHERS)
+198.73
+199.36 tow
+199.80
NEW SCHOOL
CROSSING
(LOCATION TBD)
2M RADIUS
CONNECT PROPERTY SW
OUTLETS TO NEW PIT
(150Ø PVC PIPE)
NEW 600 X 1500? SEP
CONNECT TO EXISTING
300Ø PIPE
3
0
0
Ø
E
X
I
S
T
I
N
G
150Ø PVC
CONNECT NEW
300Ø PIPE TO
EXISTING PIT
(BURIED)
NEW CONCRETE
PATH (CHARCOAL) -
BACK OF KERB TO
EXISTING FOOTPATH
B
U
S
P
I
C
K
U
P
/
D
R
O
P
O
F
F
A
A
B
B
GATE/CROSSOVER
Primary
School
Existing
driveway
Existing
driveway
SAWN FACE BLUESTONE
PITCHERS LAID FLUSH
WITH ASPHALT. CHARCOAL
MORTAR 1:6 NO ARRIS
(WIDTH TO MATCH KERB AND
CHANNEL)
+199.40
S
H
R
U
B
S
A
N
D
G
R
O
U
N
D
C
O
V
E
R
S
NEW 600 X 900 SEP (2)
CONNECT TO EXISTING
300Ø PIPE
300Ø
NEW
ASPHALT
PARKING
SIGNAGE
NEW BLUESTONE
BLOCKWORK
RETAINING WALL
6
.
3
0
5
.
4
0
6
.
3
0
5
.
4
0
6
.
3
0
2
.
3
0
3
.
8
0
2
2
EXISTING TREES
TO BE RETAINED
AND PROTECTED
1
.
2
M
1
.
2
M
1
.
4
M
2
.
3
0
+200.20
NEW BLUESTONE KERB AND CHANNEL
PROPOSED CONCRETE PATH
NEW ASPHALT CAR PARKS
NEW BLUESTONE BLOCK WORK -
PATH EDGING
EXISTING TREES
(TO BE RETAINED AND PROTECTED)
PROPOSED INDIGENOUS SHRUBS AND
GROUNDCOVERS (BY OTHERS)
LARGE FEATURE ROCKS -
(RETAINING EMBANKMENT)
LEGEND
PROPOSED CONCRETE EDGE STRIP
NEW ASPHALT - PROPOSED NEW LEVELS
NEW ASPHALT AT EXISTING GRADES
PROPOSED COR TEN SCREEN
PROPOSED SECOND HAND
RED BRICK PAVERS (NEW LEVEL)
1.201.8
2.30
.74
+198.80
+199.36
+200.10
ROAD
CAR PARK CONCRETE
PATH
UPGRADED ASPHALT
PATH (NEW LEVEL)
BLUESTONE
BLOCK KERB
AND CHANNEL
3% FALL
BLUESTONE
BLOCK WALL
GARDEN BED
(ROCK WORK)
EXISTING
POST AND RAIL
198.73+
CONCRETE
EDGE STRIP
199.60 BOW +
200.20 TOW +
BLUESTONE
BLOCK WALL
COR TEN STEEL
SCREEN
PROPOSED SECOND HAND
RED BRICK PAVING
(NEW LEVEL)
EXISTING ROAD
PAVEMENT
C
H
U
R
C
H
R
D
R
O
D
G
E
R
R
D
K
A
N
G
A
R
O
O
-
G
R
O
U
N
D
S
T
A
N
D
R
E
W
S
R
D
WORKS AREA
PANTON HILL
GENERAL STORE
WARNING
MGA94
AHD
1:200
I.D. COORDINATORS
MATHEW DEAYTON
PANTON HILL STREETSCAPE
KANGAROO GROUND - ST ANDREWS RD
STREETSCAPE DESIGN - PLAN & SECTIONS
JULY 2017
1 OF 2
Associated Drawings
DRAWING NO.
SHEET
DATE:
Scale:
Approved by
Manager Infrastructure Development
Checked byDesigned by
Coords:
Levels:
Date
REF REVISIONDATE APP'D
Signature
Open Table Drain
Proposed Sign
House Drain Connection
Property Inlet Connection
Stormwater Drain & Pit
Ex. Water Main & Valve
Ex. Gas Main
Ex. U/G Electrical Cable
Ex. Sewer Main & Manhole
Ex. Power Pole & O/H Lines
Ex. U/G Telecom Cable & Pit
Ex. Stormwater Drain & Pit
Permanent Survey Mark
Temporary Bench Mark
Proposed Light
Fire Hydrant (above ground)
Ex. Sign
Limit of Works
Tree
Fence
Tree to be removed
Ex. Telstra Pole & O/H Lines
Station Mark
Ex. Light Ex. Pole and Stay
Planting Area
Asphalt Road Seal
Asphalt Crossover
Fire Hydrant (ground level)
Concrete kerb & channel
Existing Surface Level
Design Pavement Level
Filling Deeper Than 300mm
Design Top of Kerb Level
Finished Surface Level
LEGEND
Batters
File Path:
File Name:
SAVED TO:
L:\CADBackups\PANTON HILL STREETSCAPE 2017
Panton Hill Streetscape design VER 5.dwg
JULY 2017
MC
17037
## DESCRIPTION DD/MM/YYYYM.D.
EXISTING SUB GRADE
SECTION AA
SCALE 1:25
SECTION BB
SCALE 1:25
EXISTING UNSEALED CAR
PARKS TO BE SEALED
EXISTING CONCRETE KERB
TO BE REPLACED WITH BLUESTONE BLOCKS
TO MATCH EXISTING KERB AND CHANNEL
EXISTING PIT TO BE MODIFIED
BLUESTONE EDGE STRIP TO BE
1.5M FROM ELECTRICTY POLE
(TBD ONSITE)
BUS BAY - PICK UP DROP OFF AREA
CONCRETE PAVE AREA
BETWEEN NEW KERB
AND EXISTING FOOTPATH
COR TEN STEEL PANEL - EXAMPLE
(BY OTHERS)
DRAFT
PROPOSED BLUESTONE STEPS
LOCALITY PLAN
General Notes:
1. All affected business owners are to be notified of access arrangements prior to commencement of works.
2. Asphalt to match existing levels of all utility service pits and street furniture unless otherwise specified.
3. The contractor must assess and verify the location of all other utility services on site prior commencing works.
4. Kerb setout details and levels are to be verified onsite with supervising officer.
5. All disturbed areas to be reinstated to match existing and to the satisfaction of the Supervising Council Officer.
6. Kangaroo - Ground St Andrews Rd is to remain open throughout the works. A copy of traffic management plan is to be provided to and
approved by the Supervising Council officer. Vic Roads approvals are to be supplied or a memorandum of consent obtained.
8. Affected business owners are to be notified of access arrangements prior to commencement of works.
9. Upon completion of works, the whole site shall be cleaned up, all rubbish removed to the satisfaction of the Supervising Council Officer.