Project Report
Investing in energy efficiency to reduce
climate changeNational Center for Energy Saving
and Energy Efficiency,The National Party Concerned
The reason: Memorandum of Understanding between UNECE and the National
Party Concerned
Project № ECE-INT-04-318
Slide 2
Action Plan calls for the preliminary works execution
including the following:
•Website building;• National Energy Policy Data for the purposes of regional studies;• Case Study.
Slide 3
- Briefly about Kazakhstan;- About the Project;- Summary and the Project objectives;- Purpose;- Events;- Public-Private Partnership based Investment Fund ;- Kazakhstan as the Project member;- National Coordinator (NC);- National Institutions Concerned (NIC).
Slide 4
www.energy-effect.kz,1.National Project websiteContent:
- News - Activities in the field of Energy Efficiency and Renewable Energy
in Kazakhstan; -Institutional Structure in Power Supply, Thermal Energy and Gas
sectors; -Brief description of Power Sector; - Kazakhstan Energy Policy; -Kazakhstan Energy Efficiency and Renewable Energy Policy; -Investment Programs and Projects; -Legislation and investment climate in Energy Efficiency and
Renewable Energy.
Slide 5
National Project website
Performance:
�Concept and Structure were developed�English and Russian versions are created
Specific Projects realized by Ministries and Agencies, private
structures of the Republic of Kazakhstan were inserted to the
National Project website.
2. National Energy Policy Data
National Energy Policy Data was realized and submitted to the Department of Steady-state Energy within the established deadline.
National Energy Policy Report includes:�Status Information of key energy sectors of the state;
�Policy Reforms Performance Data aimed at market-based Energy Systems formation, including information in energy, electricity market, gas, energy efficiency, energy saving and renewable energy;
�Information about political peculiarities, legal, administrative and institutional bottlenecks that impede energy efficiency and using of renewable energy markets formation.
Slide 6
Slide 7
3. National Case Study
National Case Study has been executed on the following theme:
“Analysis of power reforms introduced in the Republic of Kazakhstan and
implementation of the renewable energy related projects”
Legislation�Government Resolution "On Electric Power Development Program 2030»№ 384 from 09.04.1999, the�Law of supporting renewable energy resoures from 04.07.2009
The Principals of supporting support the use of renewable energy fixed by law:
� Investment preferences in accordance with the law on investment.� Energy transmitting companies are obliged to purchase renewable energy generated energy to offset the standard losses.� Conclusion of contracts for sale of electricity to the entire payback period of RES projects at reasonable prices in the feasibility study.� Local executive bodies shall reserve and provide land for construction of facilities for the use of renewable energy in accordance with land legislation.� Exemption from payment RES energy transmitting organizations to transfer electricity.� Granting priority for transferring electricity produced by renewable energy reasourses, in the case of capacity constraints of electrical networks energy transmitting organizations.� While dispatching of electric power used by power generating facilities is a priority for the use of renewable energy.� Expansion and reconstruction of existing power networks to connect the objects to the use of renewable energy made by the owner of electrical networks.
Slide 8
Investor
«Zhetisu»
Jointenterprise
Share - max 49%
Funds
- Purchase and provision of land;formation of contracts for
electricity sales;Obtaining all approvals and
permits.
Share - min 51%
FinancialInstitutions
Loansto 80% of Projectvalue
Consultingcompany
Development of PIN and PDD documents
ConstructionOf RES
OperationOf RES
Sales shares (amount, timing and% - agreed by the parties)
Scheme implementation of RES projectsScheme implementation of RES projects
Annual receiving of additional proceeds from the sale of emission reductions of CO2
Mechanism of Kyoto report(IPCC and the UNFCCC
Slide 9
№ The name of an indicatorUnit of measure
megawattMean annual production of electric power, million kWh
Approximate cost of the project,
million tenge
Almaty region
1 Cascade HPPs on the River. Kaskelen 22,6 116,7 8 470
2 Cascade HPPs on the River. Aksai 18,8 97,7 7 050
3 Cascade HPPs on the River. Talgar 11,5 61,5 4 312
4 Cascade HPPs on the River. Chilik 94,3 600,1 35 300
5 Cascade HPPs on the River.BAC 13,9 50,5 5 213
6 HPP-1 and HPP-2 on the River Karkara 43,0 228,0 16 125
Total for Almaty region 204,1 1 154,5 76 480
Taldykorgan region
7 Cascade HPPs on the River. Chizha 36,0 198,1 12 596
8 Cascade HPPs on the River. Borohudzir 10,0 69,8 2 841
9 Cascade HPPs on the River. Usek 25,6 130,5 7 905
10 Cascade HPPs on the River. Keskenterek 6,7 35,2 1 981
11 Cascade HPPs on the River. Hargos 118,2 724,6 44 325
12 Bodarevskaya HPPs (r. Koksu) 31,0 139,0 11 625
13 Rudnichnye HPPs -1,2 (r. Koksu) 42,0 191,1 10 650
14 HPPs Kysylkungei 150,0 520,0 56 250
15 HPPs Kysylbulak 40,0 233,0 15 000
16 HPPsTalapty 18,0 114,0 6 750
17 Cascade HPPs on the River. Aksu 26,1 142,8 9 787
18 Cascade HPPs on the River. Sarkand 11,9 73,0 4 462
19 Cherkaskaya HPPs 8,0 40,0 3 000
20 Konstantinovskaya HPPs (r. Тentek) 100,0 445,7 37 500
21 Gerasimovskaya HPPs-4 (r. Тentek) 44,0 201,0 16 500
22 Zhungarskaya HPPs 50,0 180,1 18 750
23 Tunkuruzskaya HPPs 31,0 156,0 11 625
24 Cascade HPPs on the River. Orta-Tentek 15,6 91,0 5 850
25 Cascade HPPs on the River. Irgaity 34,6 167,9 12 975
Total for Taldykorgan region 799,3 3 852,8 290 373
Total for Almaty region 1003,1 5 007,3 366 853
Plans for construction of small hydropower plants till the 2020Plans for construction of small hydropower plants till the 2020КазНИИЭнергетики
(Ka
zak
h R
ese
arc
h I
nst
itu
te o
f P
ow
er
En
gin
ee
rin
g)
Slide 10
Project of LLP “EnergoAlem "Issyk hydroelectric -2
Technological parametersInstalled capacity megawatt 5.0Firm capacity megawatt 1.8Average long-term manufacture, million kilowatt-
hour28,1
Maximum water flow of hydroelectric power station 4,0
calculation pressure (gross) 160,0average annual water flow of the river
in winter / summer3,8
2,2/5,3
One of the priority directions of development of electricity andenvironmental problems of Kazakhstan is the use of renewable energy resources. July 4, 2009 by № 165-IV was adopted by the Law of the Republic of Kazakhstan "On supporting the use of renewable energy.
The greatest prospects for the development of small hydropower exist in the Almaty region, with considerable potential.
In 2008, a small hydroelectric Issyk-2 was commissioned (Enbekshikazahsky district, pp. Issyk) total power - 5 MW, the payback period of the project is - 2 years.
Slide 11
LLP «ASPMK-519»
The joint enterprise for the realization of projects were created:
•Feasibility study was developed.•Positive assessments are produced in the feasibility study: Energy and Mineral Resources, Department of Emergency, Kazakhtelecom, Almaty irrigatsiya, Yuzhkaznedra, Gossanepidnadzor.•Feasibility Study for endorsement in the Department of Ecology and State expertise.•Work is underway to arrange financing from the NB for 2010-2012.•Construction documents are being developed at the 1-th HPP on river Chizha
The name of an indicatorUnit of measure
megawatt
Mean annual production of electric power, million
kWh
Approximate cost of the project,
million $
Cascade HPPs on the River. Borohudzir 10,0 69,8 2 841Cascade HPPs on the River. Chizha 36,0 198,1 12 596Cascade HPPs on the River. Keskenterek 6,7 35,2 1 981Cascade HPPs on the River. Usek 25,6 130,5 7 905
Total 78,3 433,6 25 323
Slide 12
RudnichnyieRudnichnyie HPPsHPPs№№1 1 andand№№2 2 on the River Koksuon the River Koksu
LLP “TT-Group”, and Chinese company Datang
Joining SEC "Zhetisu" in the joint venture for the construction of HPPs №1 and №2 on the river koksu.
Total installed capacity - 42 MWEstimated cost - $ 71.73 millionAverage annual production - 191.14 million kWhDebt capital - 80%Equity - 20%
Feasibility study was developed, all the necessary conclusions were received.CAP is being developed.Determine the proportion of SPK "Zhetisu" in the joint venture (approximately 13-15%).
Slide 13
Bortagaiskayia HPP and cascade of the small HPP on the river Tekes
Construction of Bartogayskayia HPP
Power - 20 MWAverageAnnual production of electric power - 119,7 million kWh / year.Application for funding of $ 30 million from the Republic of Belarus for 2010 - 2012.
Restoring Tekesskaya HPPConst. capacity - 1,1 MWFor the restoration needs about 200 million tenge.
Construction of cascade hydropower TekesskihPower - 20 MWAverage Annual production of electric power -105,3 million kWh / year.Application for funding of $ 23.3 million from the National Bank for 2010 - 2012.
Slide 14
MicroMicro --hydro (up to 0,5 MW)hydro (up to 0,5 MW)In order to provide with electricity to remote farms, villages, etc. The
possibility of a joint venture for the construction of micro-hydro.
Advantages:
�water supply from 0,2 to 10 m3 / s at the height of the fall of
1-10m, in those circumstances where the use of conventional
turbines uneconomic
�unimpeded floating of fish
�natural river channels don’t change
�high efficiency (85%), especially in the field of partial loads,
which ensures a high annual output
�simplicity and high speed of construction (3-6 months).
�reliable and simple in design
�Low maintenance costs
�long operation life (25 years)
� small payback period (4-7 years)
Slide 15
WPS Construction
Almaty region has unique potential for the WPS construction sites - Alataw gates Shelek corridor.
in Alataw Pass: average wind speed - 9,7 m / s flux density - 1050 W/m2 number of hours WPS with full load - 4400 h / year.
in Shelek corridor: average wind speed - 7,8 m / s flux density - 310 W/m2 number of wind farms in full-time - 3100 h / year.
December 3, 2008 between JSC "NC" SEC "Zhetisu and LLP « Energieteam KZ» Memorandum of Understanding was signed, under which the parties will work together toinstall 1000 MW wind farm.
Currently out to tender for the development of pre-feasibility study for construction of wind power station of 50 MW, with theprospect of expanding to 300 MW in Jungar gate and Shelek corridor.
Work on reservation land in Jungar gate and Shelek corridor.
Slide 16
�The relatively close location of wheat fields to human settlements;
�Projects for the use of biomass as a fuel in industrial scale, within the scope of the
Kyoto Protocol;
�Heat of combustion of straw is 15.9 MJ / kg, which is only 13% below Ekibastuz
coal (18.3 MJ / kg);
�The reliability of fuel supplies, as renewable resources of straw and in Kazakhstan
it is available in sufficient quantities for prolonged use;
�Reduces the cost of thermal energy.
Biomass – entirely renewable and the natural fuel in the storage of solar energy
The area of The area of cultivated landcultivated land
thousandthousand. . hectarehectare
Amount harvestAmount harvest
for 2008for 2008
thousandthousand. . tonstons
VolumeVolume
StrawStraw
thousandthousand. . tonstons
Specific amounts of Specific amounts of straw per hectare of straw per hectare of
landlandtonstons//hectarehectare
Almaty regionAlmaty region 492492 659,7659,7 1319,41319,4 2,72,7