installation of new drainage systems and reshaping of “splitter” island rushden redevelopment...

Post on 01-Apr-2015

219 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

  • Slide 1

Installation of new drainage systems and reshaping of splitter island Rushden Redevelopment 2014 Slide 2 Digging out the bank in preparation for installing a pre-cast concrete wall adjacent to the new small item recycling area Rushden Redevelopment 2014 Slide 3 Digging out the grass bank in preparation for installing the pre-cast concrete wall Rushden Redevelopment 2014 Slide 4 Concrete has been removed from the skip bays in preparation for casting the concrete retaining wall in-situ Slide 5 Reinforced concrete broken out from the skip bays in preparation for casting the concrete retaining wall in-situ Rushden Redevelopment 2014 Slide 6 Groundworks in preparation for moving the on-site roads

top related