HR User Group 12 th November 2008 Tim Wells. Briefing. What have we achieved so far? Who is the Preferred Supplier? What the next steps are?. Achievements in the last quarter. Evaluation ITT scoring Demonstrations Technical clarification Reference site visits Conference calls - PowerPoint PPT Presentation

TRANSCRIPT

HR User Group12th November 2008Tim Wells

Briefing

• What have we achieved so far?

• Who is the Preferred Supplier?

• What the next steps are?

Achievements in the last quarter

• Evaluation– ITT scoring– Demonstrations– Technical clarification– Reference site visits– Conference calls

• Preferred supplier appointed

Preferred supplier

Project plan• Project website: http://www.ucl.ac.uk/hr/rome

Description Estimated completion date

Preferred Supplier appointed Nov 08

Live system Mar / Apr 09

Rolled out to departments July 09

Next steps

• Finalise contract

• Finalise specification design

• Begin system build

• Plan for User Acceptance Testing (UAT)

• Planning for pilot and rollout

Thank you

• HR– Clara Ferrer-Lopez– Helen Brown– Mark Rice

• Departments– Denise Beales – Richard Sharp– Mark Tiwarri

• Finance– Pam Reel

• Procurement– Bob Swan

• Everyone who came to the demonstrations

Any questions?

top related