generic presentation eeis
Post on 12-Jun-2015
153 Views
Preview:
TRANSCRIPT
Energy Efficiency Information System (EEIS)
Prepared forCadmus College
March 23, 2010
2
How EEIS Began• 2006 - Aquila engages Quantec to fix their
excel-based tracking system after it freezes…
• Tracking system for utilities:– Multiple implementers– Web-based interface
• Participants – refreshed regularly from utility db.• Equipment – one db alone has over 200k entries• Program rules – very complex; frequent tweaks.
• 2 utilities running programs across 7 territories
3
Market Evolution
• Excel spreadsheets for tracking single programs, to…
• Multi-state, multi-portfolio, multi-program implementations
• Integration of external databases, Treasury functions, project management and sophisticated real time analytics.
4
System Structure
5
Integrated Tracking Perspective
EEIS tracks: Participant data
Baseline energy data
Customer calls
Energy audit &
education
Contract work
completed
Work approved
Energy Auditor
completes check
Revised energy data
Customer Satisfaction
survey completed
Implementer tracks deployment stages, not performance.
Piedmont CIS data
Equipment efficiency
data
Codes & Standards
EEIS tracks only data relevant to program performance from implementer and external databases.
7
How do we deploy EEIS?
Kickoff meeting: Program structure, rules & input pages.
EEIS configuration, and set-up including minor
customization Data maintenance & user support.
Documentation, training & user
acceptance
Major customization
Standard deployment: 1 1/2 to 2 monthsIncluding major customization approx. 2-3 months
Design phase InstallationTraining &
acceptanceFurther Customization & ongoing support
8
Tracking Basics
Goals and Rules
9
Tracking Basics
Goals and Rules
Data Entry
10
Tracking Basics
Quality Control
Goals and Rules
Data Entry
11
Tracking Basics
EvaluationQuality Control
Goals and Rules
Data Entry
12
Reporting
• Evaluation through reporting• Reports give access to
– Goals and expectations– Participation data– Comparison of participation against
goals
EvaluationQuality Control
Goals and Rules
Data Entry
13
Reporting
Portfolio/Program Status Reports– Executive Summary– Expenditures– Installations– Participation– Savings Impacts
EvaluationQuality Control
Goals and Rules
Data Entry
14
Reporting
Ad Hoc Reports– Data Entry Summaries– Program Summaries
EvaluationQuality Control
Goals and Rules
Data Entry
15
Data Integration
EvaluationQuality Control
Goals and Rules
Data Entry
EEIS
CIS Equipment
Treasury
ProgramRules
Participation
Imports
Exports
16
Data Validation
EvaluationQuality Control
Goals and Rules
Data Entry
• Uses data integration to validate– CIS– Equipment– Participation– Program Rules– Treasury
17
Data Entry
• Participation can be hand entered• Step-by-step process• Usually done by implementers
Quality Control
Data Entry
EvaluationGoals and
Rules
18
Rules
• Program rules defined in program planning (e.g. Portfolio Pro)
• Rules include– Eligible participant base– Eligible equipment or measures– Efficiency requirements
Quality Control
Data Entry
EvaluationGoals and
Rules
19
Goals
• Program goals defined in program planning (e.g. Portfolio Pro)
• Goals include– Participation targets– Savings targets– Budget targets
Quality Control
Data Entry
EvaluationGoals and
Rules
22
What Sets EEIS Apart• Capture, report and export of data required by utilities for
assessing the effectiveness of programs
• Real-time validation of both participants and equipment – this reduces errors and confusion for customers and the utility
• Sophisticated analytics to assess net energy savings, program costs - tracks programs against the utilities' key performance goals
• Flexible software allows accurate tracking for extremely complex programs
• Ad Hoc Reporting allows DSM program managers to design targeted queries that arrange data from unique perspectives
23
Contact Information
Business Contacts Technical Contacts
Jim ThayerSenior AssociateThe Cadmus GroupTel: (503) 467-7137jim.thayer@cadmusgroup.com
Ryan KilkennyApplication Development LeadThe Cadmus GroupTel: (503) 467-7135ryan.kilkenny@cadmusgroup.com
Ken SeidenPrincipleThe Cadmus GroupTel: (503) 467-7124ken.seiden@cadmusgroup.com
Spencer LittleApplication DeveloperThe Cadmus GroupTel: (503) 467-4558Spencer.little@cadmusgroup.com
24
Questions?
top related