fred luna, sbcag paul martinez, caltrans district 5 project information state route 246 passing...

Post on 15-Jan-2016

216 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Fred Luna, SBCAG

Paul Martinez, Caltrans District 5

Project Information

State Route 246 Passing Lanes

1

Project TeamCaltrans

SBCAG- Santa Barbara CountyAssociation of Governments

Santa Barbara County

City of Lompoc

State Route 246 Passing Lanes

2

Purpose•Improve traffic flow by reducing the length of traffic queues•Increase sight distance at the Tularosa Road intersection and reduce the length and steepness of the approaching grades

Need•Drivers spend 65% of their time behind slow-moving traffic during peak hours•Passing opportunities are limited by oncoming traffic during peak hours•Through -traffic is delayed by left-turning traffic•Sight distance at the vertical curve at Tularosa Road is non-standard

State Route 246 Passing Lanes

3

State Route 246 Passing Lanes

4

Project Features•Eastbound passing lane Cebada Cyn Rd. to Tularosa Rd.•Westbound passing lane Hapgood Rd. (west) to Tularosa Rd.•Left-turn lanes at Tularosa Rd., Hapgood Rd. (west)•Flatter grades for improved sight distance at Tularosa Rd.•Left-turn lanes at 9 driveways and private roads•Upgrading of drainage culverts•Wildlife crossings for CA Tiger Salamander and small animals•36 Acre credit - CA Tiger Salamander Mitigation Bank

State Route 246 Passing Lanes

5

• Construction Cost: $17.24 million

• Construction to Begin: June 2015

• Construction Complete: April 2017

• Construction Contractor: Papich Construction Company, Inc.

• Landscape Project to Follow Road Construction

State Route 246 Passing Lanes

6

Eastbound Passing Lane 1.5 miles longPM 12.78 to PM 14.24

Left-turn Lane at Purisima Golf Course Shown

State Route 246 Passing Lanes

7

Westbound Passing LanesEastbound Passing Lane Transitions to Left-

turn LaneTularosa Rd. at PM 14.75

State Route 246 Passing Lanes

8

Westbound Passing Lane 2.1 miles longPM 14.06 to PM 16.06

Typical Left-turn Lane at Driveway

State Route 246 Passing Lanes

9

State Route 246 Passing Lanes

Construction•Overall duration about two years (weather permitting)•Periodic one-way traffic control with short delays•Construction to be completed behind concrete barriers•Provide access for bicyclists through the project work zone•Maintain access to driveways and public road connections•Provide regular updates on construction to interested parties •Use CHP to promote safety and reduce speeds during construction

10

State Route 246 Passing Lanes

Construction Cross Section Stage 10.3 miles long

Approximately 2 months Duration

11

State Route 246 Passing LanesConstruction Cross Section Stage 1

1.5 miles longApproximately 7-8 months

duration

12

State Route 246 Passing LanesConstruction Cross Section Stage 1

2 @ 0.9 miles long (at each end of previous section)

Approximately 7-8 months duration

13

State Route 246 Passing Lanes

Construction Cross Section Stage 21.8 miles long

Approximately 6 months duration

14

State Route 246 Passing Lanes

Buellton to Lompoc Route 24617.5 miles22 minutes by car1 hour 36 minutes by bicycle

Alternate Route – Santa Rosa Road20.5 miles44 minutes by car1 hour 57 minutes by bicycle

15

Paul Martinez, Caltrans (805) 549-3407

paul.martinez@dot.ca.gov

Fred Luna, SBCAG(805) 961-8926

fluna@sbcag.org

http://www.dot.ca.gov/dist05/projects/lompoc246/index.htm

For More Information:

16

top related