fiif management board technology transfer status may 2012 a. kellner, may23rd, 2012
Post on 02-Jan-2016
212 Views
Preview:
TRANSCRIPT
FIIF Management BoardTechnology Transfer
Status May 2012
A. Kellner, May23rd, 2012
Page 2
Thi
s do
cum
ent i
s th
e pr
oper
ty o
f Ast
rium
. It s
hall
not b
e co
mm
unic
ated
to th
ird p
artie
s w
ithou
t prio
r w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
ASTRIUM ST CTO/CQO
Technology Transfer Phases
The long time-to-maturity of the development of the fusion power planttechnologies and the related engineering know-how leads to 2 transfer phases
Phase 1: • transfer of technologies for spin-off generation in non-fusion applications• to startups and SMEs
Phase 2: • transfer of technologies and engineering, integration and ops know-how to build power plants• to potential power plant builders
Page 3
Thi
s do
cum
ent i
s th
e pr
oper
ty o
f Ast
rium
. It s
hall
not b
e co
mm
unic
ated
to th
ird p
artie
s w
ithou
t prio
r w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
ASTRIUM ST CTO/CQO
Phase 1: Transfer Organisation and Processes
Set up a
Technology Transfer Programme Office (TTPO) coordinating:
a Technology Transfer Network (TTN) of technology brokers which get EU
contracts (basic reimbursement and incentives) to pro-actively foster the
knowledge dissemination
opportunities announced on a web-based Technology Market Place matching
technology push and business pull
Business Incubation Centers helping start-ups technologically and legally
funding support for start-ups, e.g. outsourced to Venture Capital companies
Page 4
Thi
s do
cum
ent i
s th
e pr
oper
ty o
f Ast
rium
. It s
hall
not b
e co
mm
unic
ated
to th
ird p
artie
s w
ithou
t prio
r w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
ASTRIUM ST CTO/CQO
Phase 2: Transfer Organisation and Processes
Extend the
Technology Transfer Programme Office (TTPO) to coordinate:
the short-term establishment of a knowledge management system to capture the
knowledge (*)acquired during the JET and ITER construction in configuration-managed,
structured formats easily retrievable in later times
in the long run the placement of a contract to a consortium of potential power plant builders
with the relevant associations as subcontractors for the pre-competitive transfer of know-
how on technologies, engineering, integration, and operations
(*) Comprising, apart from explicitly documented knowledge, in particular the implicit knowledge in the minds of staff w.r.t. best practices, lessons learned on mishaps, experience gained in manufacturing, integration and operations, etc.
Page 5
Thi
s do
cum
ent i
s th
e pr
oper
ty o
f Ast
rium
. It s
hall
not b
e co
mm
unic
ated
to th
ird p
artie
s w
ithou
t prio
r w
ritte
n ag
reem
ent.
Its c
onte
nt s
hall
not b
e di
sclo
sed.
ASTRIUM ST CTO/CQO
Current Status
Phase 1: 2-years pilot project piggy-back „on top“ of the ESA process and institutions Basic agreement with ESA reached Currently under EC-internal preparation
Phase 2: Pilot of a Lessons Learned System currently under development in F4E contract
and procurement unit Focused on knowledge sharing w.r.t. handling procurement procedures
top related