Earned Value Dashboard
PV(BCWS)
EV(BCWP)
ActualCost
BaselineCost
Name PercentComplete
SV CV CPI
$6,296$6,703$13,924$19,873 PROJECT SUMMARY $407.05 ($7,221) 0.48
$1,489$1,480$3,000$3,523TEST MOTOR DESIGN AND SUPPORT ($9.01) ($1,520) 0.49
$1,803$1,907$3,050$4,333ANALYSIS PLAN $103.47 ($1,143) 0.63
$1,900$1,984$2,050$4,222TEST & VERIFICATION PLAN $84.44 ($66) 0.97
$429$508$3,600$1,452DESIGN PLAN $78.78 ($3,092) 0.14
$675$825$2,224$6,343SYSTEM DESIGN ANALYSIS $149.37 ($1,399) 0.37
$0$0$0$2,555SYSTEMS ENGINEERING AND INTEGRATION $0.00 $0 0.00