eaf mobile facilities (ie shima island)

Post on 25-Feb-2016

51 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

EAF Mobile Facilities (Ie Shima Island). QHR205 (please note: This is a MALS-36 MF CSC failure, beyond Repair capability.). ISO corners delaminating and coliflowering. . ISO corners delaminating and coliflowering. . QHR205. Bottom side rail damage/deteriorated by corrosion. . - PowerPoint PPT Presentation

TRANSCRIPT

EAF Mobile Facilities (Ie Shima Island)

QHR205(please note: This is a MALS-36 MF CSC failure, beyond Repair

capability.)

ISO corners delaminating and coliflowering.

ISO corners delaminating and coliflowering.

QHR205

Cracked ISO corner due to corrosion damage.

Bottom side rail damage/deteriorated by corrosion.

QHR205

Forklift pockets deteriorated beyond

repair capability. Brittle to the touch.

(All forklift pockets are in the same condition.

QHR171 (please note: This is a NADEP MF CSC failure, beyond Repair capability.)

ISO Corner Coliflowering.

QHR171

ISO Corner Coliflowering.

Corrosion damage on side rail

(structural member).

QHR171

ISO Corner Coliflowering.

QHR171/QHR205Please note: More pictures are available if needed.

top related