dasco intro

Post on 13-Jul-2015

202 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Dasco Engineering

24747 Crenshaw Blvd.

Torrance, Ca. 90505

310-326-2277

Background - Who is Dasco ?

• 45 years supplying machined parts to the aerospace industry.

• Recognized as a leader in machining complex hardware.

• Specialize in machining titanium and other hard and exotic alloys.

• Strong engineering team utilizing state-of-art software and hardware.

Core Business Strategy

• Support Prime aerospace manufacturers

• Industry leader for titanium machining

• Increase value added product deliveries

• Gold Quality and Delivery recognition

• Offer partner/risk relationships

Torrance Facility66,000 sq. ft.Main facility: machining, sub-assembledstructures and final source inspection.

Long Beach Facility40,000 sq. ft.Multi-spindle rough and finishmachining of hard metals

Total 106,000 sq. ft.

FacilitiesFacilities

Manufacturing Equipment

Torrance Main Facility

Vertical Machining

Horizontal Machining

• Makino MC1210, 50-taper, pallet changer, 99 tools, 36” sq. pallets, 49” x 39.5” x 31.5” work envelope, 6,600 lb. pallet load.

• Nigata 4-Axis HN100B, 50-taper, pallet changer, 60 tools, 49” sq. pallets, 78” x 55” x 40” work envelope, 6,600 pallet load.

Multi-Spindle Machining

(17) Multi-Spindle Gantries and CNC Profilers

Multi-Spindle Machining

(5) Cincinnati 5-axis Gantries with(75) HP high torque spindles

Hinge Manufacturing

Hinge machining and drilling upTo (20) feet in length

Assembly Shop

Experienced with riveting, hardware installation, bushing and bearinginstallation for small to medium assembled components up to 20 feet in size

Manufactured Products

Titanium wing spars

Titanium wing attach fitting

Titanium Frames

Manufactured Products cont.

Addition products manufactured include: engine mounts, stringers,cords and machined frames

Assembled Products

Main landing gear structureSheet metal assemblies

Assembled aircraft hinges

Assembled Products

Business Jet

Upper Cabin Door Assembly

Assembled Products

Aircraft Hinges

6-Axis CNC Tool Grinding

•State-of-the-art CNC equipment.

•Design and Manufacture of high-precision carbide cutting tools.

•Advanced tool design software.

•Development and test of advanced geometry tools.

•Highly accurate/repeatable tool regrinding.

CNC Programming

• CATIA V4 and V5• NCL 502, Version 9.6 CAD/CAM System• Vericut 6.1 Tool Path Verification• Postworks, 6-Axis Post-Processor

Quality System

• AS9100 – certified third party approved.• Mitutoyo “Bright 1230” 5-Axis CMM, 118” x 48” x 40” work envelope• Mitutoyo “Bright 916” 5-Axis CMM, 80” x 36” x 36” work envelope.

Management Systems

• “JobBOSS” manufacturing management software system in use since 1998 – provides real-time data capture via barcode.

° Quote Processing° Order Processing° Material Control° Shop Floor Control

° Labor Reporting

° Cost Analysis

° Shipping

° Accounting

With over 4,300 installations worldwide, JobBOSS is the established leader in shop management for the machine shops.

“JobBOSS” system coordinated with MS Access data base.

MASTER MONTHLY SHIP PLANStatus: 1=On Time, 2=Schedule Concern, 3= Late

JOB NO. CUSTOMER P/N DESCRIPTION PM COMMENTS QTY DATE QTY DATE QTY DATE QTY

S2467 BAC MIL-WA 5-96763-19 HINGE ASSY JFK SEAN - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED

S2468 BAC MIL-WA 5-96763-20 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED

S2469 BAC MIL-WA 5-96763-23 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED

1673 BAC MIL-WA 5HF75308-105 SUPPORT FITTING JFK X X X 1 TMG 2 3/18 2

1883 BAC MIL-WA 5HF75712-105 AFT FRAME JK STAGED FOR CNC 6/5/02

1883-NRE BAC MIL-WA 5HF75712-105 S/UP JK

1884 BAC MIL-WA 5HF75712-107 AFT FRAME JK NEED PROGRAM 2 3/22 2

1884-NRE BAC MIL-WA 5HF75712-107 NRE JK

1727 BAC MIL-WA 5HW82316-101 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03

1725 BAC MIL-WA 5HW82316-101 STRUT SUPPORT JK X X X 1 CNC - FADAL(2) PCS STOCK

1726 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADAL(2) PCS. STOCK 5 4/7

1728 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03

1873 BAC MIL-WA 5HW82492-103 SPLICE JK

1682 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15

1379 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING

1874 BAC MIL-WA 5HW82492-104 SPLICE JK

1683 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15

1380 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING

1875 BAC MIL-WA 5HW82492-105 SPLICE JK

1684 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15

1381 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X X 1 STOCK THRU SEPT.

1382 BAC MIL-WA 5HW82492-106 SPLICE JFK X X X X 1 STOCK THRU SEPT.

1876 BAC MIL-WA 5HW82492-106 SPLICE JK

LATE

NC

PR

OG

.

TO

OL

ING

PR

OD

. RE

L.

ST

AT

US

PL

AN

NIN

G

MAR MAYAPR

5/2

4

6/14

5/31

6/1

2

7/22 6/3

6/5

6/14 7/2

7/2

6/1

8

7/9

7/1

2

7/16 8/8

8/1

2

8/6

8/2

6

9/2

5

9/4

10/

2

170

4

170

6

1711

174

9

175

1

1755

175

7

1761

1763

176

4

1758

174

3

176

6

1745

176

0

175

3

1746

174

8

185

5

1842

184

4

KURAKI 05 913

0

913

0

9430

943

0

943

0

9230

923

0

9330

9330

933

0

9230

913

0

933

0

9130

923

0

943

0

9130

913

0

933

0

9430

943

0

SNK 3-SPIND. #1 11

CIN. 5-AXIS 04

SNK 5-AXIS #1

SNK 5-AXIS #2

SNK 3-SPIND. #2

2677-102 / 1321J

9/286/16

2675-102 / 1689B

2679-104 / 1323J

2685-103 / 1696B

6/28 7/306/30

7/9

6/2

2305-102 / 1331

7/27

9955843-5/-6S2458-1/-2

6/16 7/27 6/30

0055-2013/ 1465

7/22

1752

933

0

9/4

184

39

430

7/12

175

97

/9

7/1

617

44

9330

913

0

943

0

923

0

9430

9230

933

0

180'S 9130

8/6

8/1

2

185

61

0/2

1854

8/26

174

7

175

4

2305-101 / 1330

6/30

2675-102 / 1319J

2682-103 / 1694B

2675-101 / 1688B

2682-103 / 1694C

2682-103 / 1694A

2685-103 / 1696B, C

5/24 6/3

9130

5/31

1705

6/1

2

1756

171

2

1750

9/4

943

0

9430

9230/9330

9/4

2677-101 / 1690E,F,G

7/13

2679-103 / 1692C

7/30 7/30

2677-102 / 1691C

7/13 7/13

2685-104 / 1697A

2305-102 / 1331

2685-104 / 1697C

2685-103 / 1696C

9/9 8/25

2685-104 / 1697B

2679-103 / 1692D,E,F

2305-102 / 1331

2675-102 / 1689A

2685-103 / 1696G,H,I

2685-104 / 1697G,H,I

2682-103 / 1694D,E,F

9230/93309230/9330

2685-103 / 1696D,E,F

2685-104 / 1697D,E,F

2685-103 / 1696A

9130/9430

6/18

7/9

1765

176

2

9330

9130/9430

9/4

2685-104 / 1697A, B, C

2677-101 / 1690C,D

2677-102 / 1691C

2305-101 / 1330

2677-102 / 1691D,E,F

9/24

2685-103 / 1696D

10/22 10/22

8/25 9/14

2685-103 / 1696E

2685-103 / 1696F

2679-104 / 1693C

2677-101 / 1690C

9130/9430

Master Ship Plan

Machine Loading

Production Control System

top related