Background - Who is Dasco ?
• 45 years supplying machined parts to the aerospace industry.
• Recognized as a leader in machining complex hardware.
• Specialize in machining titanium and other hard and exotic alloys.
• Strong engineering team utilizing state-of-art software and hardware.
![Page 3: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/3.jpg)
Core Business Strategy
• Support Prime aerospace manufacturers
• Industry leader for titanium machining
• Increase value added product deliveries
• Gold Quality and Delivery recognition
• Offer partner/risk relationships
![Page 4: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/4.jpg)
Torrance Facility66,000 sq. ft.Main facility: machining, sub-assembledstructures and final source inspection.
Long Beach Facility40,000 sq. ft.Multi-spindle rough and finishmachining of hard metals
Total 106,000 sq. ft.
FacilitiesFacilities
![Page 5: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/5.jpg)
Manufacturing Equipment
Torrance Main Facility
![Page 6: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/6.jpg)
Vertical Machining
![Page 7: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/7.jpg)
Horizontal Machining
• Makino MC1210, 50-taper, pallet changer, 99 tools, 36” sq. pallets, 49” x 39.5” x 31.5” work envelope, 6,600 lb. pallet load.
• Nigata 4-Axis HN100B, 50-taper, pallet changer, 60 tools, 49” sq. pallets, 78” x 55” x 40” work envelope, 6,600 pallet load.
![Page 8: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/8.jpg)
Multi-Spindle Machining
(17) Multi-Spindle Gantries and CNC Profilers
![Page 9: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/9.jpg)
Multi-Spindle Machining
(5) Cincinnati 5-axis Gantries with(75) HP high torque spindles
![Page 10: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/10.jpg)
Hinge Manufacturing
Hinge machining and drilling upTo (20) feet in length
![Page 11: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/11.jpg)
Assembly Shop
Experienced with riveting, hardware installation, bushing and bearinginstallation for small to medium assembled components up to 20 feet in size
![Page 12: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/12.jpg)
Manufactured Products
Titanium wing spars
Titanium wing attach fitting
Titanium Frames
![Page 13: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/13.jpg)
Manufactured Products cont.
Addition products manufactured include: engine mounts, stringers,cords and machined frames
![Page 14: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/14.jpg)
Assembled Products
Main landing gear structureSheet metal assemblies
Assembled aircraft hinges
![Page 15: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/15.jpg)
Assembled Products
![Page 16: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/16.jpg)
Business Jet
Upper Cabin Door Assembly
Assembled Products
![Page 17: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/17.jpg)
Aircraft Hinges
![Page 18: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/18.jpg)
6-Axis CNC Tool Grinding
•State-of-the-art CNC equipment.
•Design and Manufacture of high-precision carbide cutting tools.
•Advanced tool design software.
•Development and test of advanced geometry tools.
•Highly accurate/repeatable tool regrinding.
![Page 19: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/19.jpg)
CNC Programming
• CATIA V4 and V5• NCL 502, Version 9.6 CAD/CAM System• Vericut 6.1 Tool Path Verification• Postworks, 6-Axis Post-Processor
![Page 20: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/20.jpg)
Quality System
• AS9100 – certified third party approved.• Mitutoyo “Bright 1230” 5-Axis CMM, 118” x 48” x 40” work envelope• Mitutoyo “Bright 916” 5-Axis CMM, 80” x 36” x 36” work envelope.
![Page 21: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/21.jpg)
Management Systems
• “JobBOSS” manufacturing management software system in use since 1998 – provides real-time data capture via barcode.
° Quote Processing° Order Processing° Material Control° Shop Floor Control
° Labor Reporting
° Cost Analysis
° Shipping
° Accounting
With over 4,300 installations worldwide, JobBOSS is the established leader in shop management for the machine shops.
![Page 22: Dasco Intro](https://reader033.vdocuments.mx/reader033/viewer/2022042522/55a38ba01a28ab9b3d8b45e2/html5/thumbnails/22.jpg)
“JobBOSS” system coordinated with MS Access data base.
MASTER MONTHLY SHIP PLANStatus: 1=On Time, 2=Schedule Concern, 3= Late
JOB NO. CUSTOMER P/N DESCRIPTION PM COMMENTS QTY DATE QTY DATE QTY DATE QTY
S2467 BAC MIL-WA 5-96763-19 HINGE ASSY JFK SEAN - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
S2468 BAC MIL-WA 5-96763-20 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
S2469 BAC MIL-WA 5-96763-23 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
1673 BAC MIL-WA 5HF75308-105 SUPPORT FITTING JFK X X X 1 TMG 2 3/18 2
1883 BAC MIL-WA 5HF75712-105 AFT FRAME JK STAGED FOR CNC 6/5/02
1883-NRE BAC MIL-WA 5HF75712-105 S/UP JK
1884 BAC MIL-WA 5HF75712-107 AFT FRAME JK NEED PROGRAM 2 3/22 2
1884-NRE BAC MIL-WA 5HF75712-107 NRE JK
1727 BAC MIL-WA 5HW82316-101 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03
1725 BAC MIL-WA 5HW82316-101 STRUT SUPPORT JK X X X 1 CNC - FADAL(2) PCS STOCK
1726 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADAL(2) PCS. STOCK 5 4/7
1728 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03
1873 BAC MIL-WA 5HW82492-103 SPLICE JK
1682 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1379 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING
1874 BAC MIL-WA 5HW82492-104 SPLICE JK
1683 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1380 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING
1875 BAC MIL-WA 5HW82492-105 SPLICE JK
1684 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1381 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X X 1 STOCK THRU SEPT.
1382 BAC MIL-WA 5HW82492-106 SPLICE JFK X X X X 1 STOCK THRU SEPT.
1876 BAC MIL-WA 5HW82492-106 SPLICE JK
LATE
NC
PR
OG
.
TO
OL
ING
PR
OD
. RE
L.
ST
AT
US
PL
AN
NIN
G
MAR MAYAPR
5/2
4
6/14
5/31
6/1
2
7/22 6/3
6/5
6/14 7/2
7/2
6/1
8
7/9
7/1
2
7/16 8/8
8/1
2
8/6
8/2
6
9/2
5
9/4
10/
2
170
4
170
6
1711
174
9
175
1
1755
175
7
1761
1763
176
4
1758
174
3
176
6
1745
176
0
175
3
1746
174
8
185
5
1842
184
4
KURAKI 05 913
0
913
0
9430
943
0
943
0
9230
923
0
9330
9330
933
0
9230
913
0
933
0
9130
923
0
943
0
9130
913
0
933
0
9430
943
0
SNK 3-SPIND. #1 11
CIN. 5-AXIS 04
SNK 5-AXIS #1
SNK 5-AXIS #2
SNK 3-SPIND. #2
2677-102 / 1321J
9/286/16
2675-102 / 1689B
2679-104 / 1323J
2685-103 / 1696B
6/28 7/306/30
7/9
6/2
2305-102 / 1331
7/27
9955843-5/-6S2458-1/-2
6/16 7/27 6/30
0055-2013/ 1465
7/22
1752
933
0
9/4
184
39
430
7/12
175
97
/9
7/1
617
44
9330
913
0
943
0
923
0
9430
9230
933
0
180'S 9130
8/6
8/1
2
185
61
0/2
1854
8/26
174
7
175
4
2305-101 / 1330
6/30
2675-102 / 1319J
2682-103 / 1694B
2675-101 / 1688B
2682-103 / 1694C
2682-103 / 1694A
2685-103 / 1696B, C
5/24 6/3
9130
5/31
1705
6/1
2
1756
171
2
1750
9/4
943
0
9430
9230/9330
9/4
2677-101 / 1690E,F,G
7/13
2679-103 / 1692C
7/30 7/30
2677-102 / 1691C
7/13 7/13
2685-104 / 1697A
2305-102 / 1331
2685-104 / 1697C
2685-103 / 1696C
9/9 8/25
2685-104 / 1697B
2679-103 / 1692D,E,F
2305-102 / 1331
2675-102 / 1689A
2685-103 / 1696G,H,I
2685-104 / 1697G,H,I
2682-103 / 1694D,E,F
9230/93309230/9330
2685-103 / 1696D,E,F
2685-104 / 1697D,E,F
2685-103 / 1696A
9130/9430
6/18
7/9
1765
176
2
9330
9130/9430
9/4
2685-104 / 1697A, B, C
2677-101 / 1690C,D
2677-102 / 1691C
2305-101 / 1330
2677-102 / 1691D,E,F
9/24
2685-103 / 1696D
10/22 10/22
8/25 9/14
2685-103 / 1696E
2685-103 / 1696F
2679-104 / 1693C
2677-101 / 1690C
9130/9430
Master Ship Plan
Machine Loading
Production Control System