Contractor and Facility Safety Programs

February 12, 2016By: Ryan Sawall and Kevin Maitland

Core Values

Agenda

�Bench Marks

�Effective Safety Programs

�Fire Protection

� Lockout Tagout

� IH Program

�Best Practices

�Questions/

Concerns

5

Upstream benchmarks

BIM 360

Bench Mark Data

�Downstream

�After incident

�Upstream

�Before incident

8

CHFM Summary

Agenda

�Bench Marks

�Effective Safety Programs

�Fire Protection

� Lockout Tagout

� IH Program

�Best Practices

�Questions/

Concerns

9

Safety orientations

Planning work

Enforcement of polices

Make It Count! 13

428 Violations by 88

14

� Assistant Superintendents

� Superintendents

� Project Engineers

� Assistant Project Managers

� Project Managers

� Director

� VP Operations

� Safety Geeks

Safety Enforcement

Make It Count! 15

Falls = 220 warning = 100time off = 115

removed = 5PPE = 94 warning = 83

time off = 8removed = 3

Other = 114 warning=76time off = 23

removed = 15TOTAL = 428

Safety training

4 Elements of Safety Program

�Management Commitment

�Workplace Analysis

�Hazard Prevention and Control

�Safety and Health Training and Education

17

CHFM Summary

Agenda

�Bench Marks

�Effective Safety Programs

�Fire Protection

� Lockout Tagout

� IH Program

�Best Practices

�Questions/

Concerns

18

Fire Protection

ABCK

PASS

Infrared Technology

Heat detects problem

before it occurs

CHFM Summary

Water Infiltration Protection

Fire Protection

�NFPA 99 –Healthcare Codes

�Fire Extinguisher Classes A B C K

�Extinguishers placed 150’ apart

� Infrared Camera

�Maintain sprinkled areas

25

CHFM Summary

Agenda

�Bench Marks

�Effective Safety Programs

�Fire Protection

�Lockout Tagout

� IH Program

�Best Practices

�Questions/

Concerns

26

LOTO Plan

Lock Out Tag Out (LOTO)

LOTO Energy Sources

Lockout Tagout

�All energy sources

�De-energize and bleed the system

� Individual locks with tags

�Never cut off a lock

�Maintain log

30

CHFM Summary

Agenda

�Bench Marks

�Effective Safety Programs

�Fire Protection

� Lockout Tagout

� IH Program

�Best Practices

�Questions/

Concerns

31

Site IH reminders

� Communicate and work with IC staff

� Preplan IC

� Establish primary project boundaries

� Locate fresh air intakes for HVAC

� Protect against recycle of exhaust into HVAC supply

Isolation

� Set isolation walls as required

� Hard vs. soft

� Floor to ceiling or floor to deck

� High Risk areas

� (ICU, OR, Labor and Delivery, Cancer, Dialysis)

� May require secondary walls

(Vestibules, 2 door entry/exit)

Containment

� Exhaust/Air Filtering

� Direct to outside space – May still need filtration

� Through existing exhaust – Make sure it is direct to outside with no tie-ins

� Negative Pressure –maintain 0.02” H2O

� Magnehelic Gauges

� Electronic Monitors with local display and alarms (local and remote)

Containment

� Monitor pressure drop across HEPA filters

� Walk-off mats

� Keep clean change as needed

� Tacky mats

� Change as needed – multiple times/day

Containment

� Keep material covered when removing

� Wipe down the outside

� Including tools, ladders and supplies

� Check workers for contamination

� Vac off clothes

� Use disposable coveralls

Infection Control ICRA

� Infectious Control meeting EARLY

�Risk assessment

�Specific hazards and protection levels

�Post plan at construction door

�Monitor 24/7

48

CHFM Summary

Agenda

�Bench Marks

�Effective Safety Programs

�Fire Protection

� Lockout Tagout

� IH Program

�Best Practices

�Questions/

Concerns

49

Site Specific Topics

� Glove use

� Electrical – assured grounding

� Fall protection

� Emergency evacuation

� Hazard communication

� Overhead protection

Site Inspections

� Scaffolds – daily

� Crane – daily, monthly, annual

� Aerial lifts – daily

� Forklifts – daily

Site Permits

� Hot work

� Roof access

� Confined space

Site Training/Certifications

� Certified crane operators

� Certified forklift operators

� Rigging and signaling

� Aerial lift

� Confine space

Safety focus items

� Post Incident Reviews

� Floor Opening Program

� High Visibility Vests/Shirts

� Falling Object Prevention /Protection

Safety focus items

� Properly using step ladders

� No keys in equipment/vehicles

� No free rigging

� Kevlar sleeves above ceiling tile

Above ceiling protection

Safety focus items

� Heat stress prevention/protection

� Managing the Human Element

� Stretching exercises daily

Agenda

�Bench Marks

�Effective Safety Programs

�Fire Protection

� Lockout Tagout

� IH Program

�Best Practices

�Questions/

Concerns

59

You would not be

allowed to do this at

work

Please don’t do this

at home

Take safety home