Progress continues despite this late posting of month number three of TechTown’s 1st Floor Renovation Project. Every month I track and post the construction progress of this project. My firm Centric Design Studio designed this space for Detroit based TechTown. You can view the previous two slide share months of progress (starting in May 2013) to see how far we’ve come. Come back next month and see the progress. Thanks for viewing.

TRANSCRIPT

Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Mail Boxes ProgressTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Plumbing Work at Food Prep Room TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

View of Future Event SpaceTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Future Event Space ProgressTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Corridor 2 + Future Meeting RoomsTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Future Co-Working Area Facing Burroughs St.TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Concrete Repair (Before) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Concrete Repair (After) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Fire Extinguisher (Future Location) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Overhead Door Structural Steel (at Event Space 1) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Overhead Door Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Overhead Door Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Structural Steel for Operable Partition (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Structural Steel for Operable Partition (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Soffit Enclosure of Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Soffit Enclosure of Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Enclosure of Overhead Structural Steel (at Event Space 1) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Space - Polished Concrete Floor Mock-Up - 1 TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Space - Polished Concrete Floor Mock-Up - 2 TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Painting Begins (at Conference Room 5) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Existing Lighting (Retrofitted) Mock-Up TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Future Co-Working Area (Looking West) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Exterior View of Future Co-Working Area (From Burroughs St.) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

More Construction Progress Photos Will Be Posted Next Month TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com