ConstructabilityPRESENTER: AMANDA PODBELSEK (CLAYCO)

Critical Players• Builder: Clayco• Design: Forum Landscape• Engineering: Stock and

Associates• Arborist: Davey Resource

Group

Successful Implementation1) Educating Ourselves

2) Coordination

3) Collective Goal and Reinforcement Onsite

Educating Ourselves

• BIM laser scanning

• After scanning the existing trees and overlaying on the proposed building layout, it was decided to rotate the building corners clockwise

Educating Ourselves• Arborist walkthroughs

(biweekly)• Tree applications• Establishing

expectations• Tree Protection Plans in

Civil Drawings

Coordination• Clayco installed fencing at onset• Direction on saving extra trees

(Forum/Davey)• Direction on preserving trees (Davey)• Design Coordination (Stock)• Site Logistics/Coordination• Site Utilities• Limestone Cladding• Precast Panel Erection• Bioswales• Grading• Drilled Piers

Coordination

Coordination

• Tree Protection in Drawings• Subcontract Language• Preconstruction Meetings• Excavation permits- Site Superintendent

Collective Goal/Reinforcement

Site Logistics and Coordination Challenges

Crane Road

Bald Cypress • arborist inspection for

stress• consulting on how to

excavate around tree• at one time, a new

design was reconsidered

Stormwater Line South of Building• Reroute stormwater line• Reconfigure Bioswale #11• Root pruning, cambistat

South Elevation LogisticsStaging of materials

Access for precast patching, metal drip edge

Questions?