ConstructabilityPRESENTER: AMANDA PODBELSEK (CLAYCO)
Critical Players• Builder: Clayco• Design: Forum Landscape• Engineering: Stock and
Associates• Arborist: Davey Resource
Group
Successful Implementation1) Educating Ourselves
2) Coordination
3) Collective Goal and Reinforcement Onsite
Educating Ourselves
• BIM laser scanning
• After scanning the existing trees and overlaying on the proposed building layout, it was decided to rotate the building corners clockwise
Educating Ourselves• Arborist walkthroughs
(biweekly)• Tree applications• Establishing
expectations• Tree Protection Plans in
Civil Drawings
Coordination• Clayco installed fencing at onset• Direction on saving extra trees
(Forum/Davey)• Direction on preserving trees (Davey)• Design Coordination (Stock)• Site Logistics/Coordination• Site Utilities• Limestone Cladding• Precast Panel Erection• Bioswales• Grading• Drilled Piers
Coordination
Coordination
• Tree Protection in Drawings• Subcontract Language• Preconstruction Meetings• Excavation permits- Site Superintendent
Collective Goal/Reinforcement
Site Logistics and Coordination Challenges
Crane Road
Bald Cypress • arborist inspection for
stress• consulting on how to
excavate around tree• at one time, a new
design was reconsidered
Stormwater Line South of Building• Reroute stormwater line• Reconfigure Bioswale #11• Root pruning, cambistat
South Elevation LogisticsStaging of materials
Access for precast patching, metal drip edge