PO B2B Add-on implementation
scenarios.
Applies to: SAP NetWeaver Process Orchestration 7.31, 7.4, 7.5 and B2B add-on SP04
Summary:
With the introduction of NetWeaver Process Orchestration B2B add-on SAP is covering all aspect of business to
business integration w ithout necessary deploy of others vendors adapters, it’s true that PO license is higher that only
PI AEX but from our point of view invest could be easy returned.
This article describe step by step procedure of basics configuration on your PO to integrate OTC and P2P scenarios
fast and quick.
Author: Integration Community
Created on: 2016/03/17
PO B2B Add-on implementation scenarios.
Table of Contents
B2B add-on and Process Orchestration 2
Netweaver PO design and configuration 2
Step-by-Step procedure 3
References 20
Version
number Purpose / Changes Author Date
1 Initial draft show n to line manager Integration Community 07/03/2016
PO B2B Add-on implementation scenarios.
B2B add-on and Process Orchestration With latest versions of PO (7.31, 7.4 and 7.5) B2B add-on is included w ithout extra license payment. SAP provide
w ith these versions a pow erful tool for B2B integrations in an easy and quick w ay w ithout obligation to include any
other supplier as Seeburger.
There is a bunch of documents and blogs w hat explain w hat it’s B2B add-on and how to do basis installation on your
PO server, objective of that document it’s to clarify and put all those explanations on a step by step document
together and create tw o different examples scenarios. We have implemented these f low s to use TPM configuration.
You can f ind a great explanation on that TPM blog post series about w hat it’s TPM and how to use it. We are not
using all TPM possibilities and only simple agreements and set up are develop to simplify scenarios.
In order to emulate AS2 client connection w e are using Mendelson softw are follow Dimitri Sannen Mendelson blog
post series to configure tool on your machine.
Netweaver PO design and configuration 1. Order to cash: Incoming orders
2. Supplier Invoice: Incoming Invoices.
SAP ERP3rd Party
FTP/VAN
EDISeparator RCV
SAP PO
EDISeparator SND
EDISeparator SND
INVOIC02
ORDERS05
AS2/FTP
RFC(IDOC)
EDIFACT
(Orders &
Invoices)
Tw o interfaces corresponding w ith next integration f low s at PO:
Integration f low I: from 3rd Party to EDISeparator (Asynchronous)
Integration f low II: from EDISeparator to Order Reception (SAP ERP system asynchronous)
Integration f low III: from EDISeparator to Invoice Reception (SAP ERP System synchronous)
Prerequisites Next installations are required to follow step by step document.
Mendelson softw are.
SMP: Installation Guide/Master Guide/Supported EDI Formats/Security Guide
SAP Note 1695520 : SMP Dow nload location of Business to Business Add-On B2B SP04
NWDS installation
PO B2B Add-on implementation scenarios.
Step-by-Step procedure All objects to use on ESR part al already deploy and created at B2B MAPPING KIT 1.0 SWC w e are going to follow
EDIFACT D96D standards so no object should be created at ESR. We w ill assume too that corresponding connection
from ECC and PO for iDoc are already in place and business system and technical system created.
We can start at configuration level on NWDS.
Step
Description
Screenshot
Start NWDS development – Process Integration Designer perspective and create Integration directory objects for
Integration flow I: from 3rd Party to EDISeparator (Asynchronous)
1 Run NWDS and open PI designer
perspective
Click: OK
2 Under PI Explorer --> Right click on
Systems
Create two news Parties:
1 Party_ABC: VAN/Group of Client
Click: Finish
2 Party_DEF : Will be SAP ERP
system.
Click: Finish
and
PO B2B Add-on implementation scenarios.
3 Right Click on Party_ABC and
create Business component:
BC: EDI_VAN
Click: Finish
and
4 Under EDI_VAN BC create AS2
Sender Communication channel:
EDI_Mendelson_AS2_Sender
Click: Finish
PO B2B Add-on implementation scenarios.
5 Set up:
EDI_Mendelson_AS2_Sender
1 Choose AS2 adapter type
2 Direction: Sender
3 on Adapter-Specific tab
configure those 3 parameters
according your Mendelson
configuration
Keep others parameters as default.
ll
PO B2B Add-on implementation scenarios.
4 Configure MDN
MDN tab on channel set up on
Application Acknowledgement
Click: Save
and
6 Create business component without
party:
BC: EDI_Separator
Click: Finish
and
7 Under EDI_Separator BC (without
Party) create EDISeparator
Communication channel:
EDI_Separator_Receiver
Click: Finish
PO B2B Add-on implementation scenarios.
8 Set up: EDI_Separator_Receiver
General tab
1 Choose EDISeprator adapter type
2 Direction: Receiver
Click: Save
9 Set up: EDI_Separator_Receiver
Adapter specific
Check: Read from Dynamic Headers
Click: Save
10 Set up: EDI_Separator_Receiver
Module: add modules is not needed
Click: Save
and
Create Integration flow I: from 3rd Party to EDISeparator (Asynchronous)
11 Right Click on: Integration Flows:
New Integration Flow
PO B2B Add-on implementation scenarios.
Name:
_Party_ABC_EDI_VAN_Dummy_S
eparator_to_EDI_Separator
ID: _Party_ABC_EDI_VAN_
Click: Finish
Set up Integration Flow:
Sender: EDI_VAN from Party_ABC
Receiv er: EDI_Separator
Use dummy interface for that iflow
Click: Save
and
Integration flow I created.
Sender:
Receiv er:
PO B2B Add-on implementation scenarios.
Create Integration directory objects for Integration flow II: from EDISeparator to Order Reception (SAP ERP system
asynchronous)
12 1 Under EDI_Separator create
Sender Communication channel:
EDI_Separator_ORDERS_Sender
Click: Finish
2 set up channel on General Details
tab:
Adapter Type: EDISeparator
Direction: Sender
Protocol: EDIFACT
Click: Save
13 Set up:
EDI_Separator_ORDERS_Sender
Adapter specific tab:
Message type: ORDERS
Click: Save
14 Set up:
EDI_Separator_ORDERS_Sender
Modules Tab:
Number Module Name Type Module Key
1 localejbs/TPMContentAccessModule Local Enterprise Bean
TPM
2 localejbs/EDISearchParametersModule Local Enterprise Bean
EDISEA
3 localejbs/EdifactConverterModule Local Enterprise Bean
EDIFAC
4 localejbs/CallSapAdapter Local Enterprise Bean
entry
Module key Parameter Name Parameter Value
TPM enable.ediAckProfile true
TPM enable.edisepUsage true
EDIFAC edif act.audit true
EDIFAC tpm.enable true
PO B2B Add-on implementation scenarios.
1 Process Sequence
Follow same sequence as picture
2 Module Configuration
Sort is not relevant
Click: Save
and
**note: We are not mention related object about iDoc communication with SAP ERP (nothing about BS and
communication iDoc channels please refer next link to create necessary connections)
Create Integrated Flow II: from EDISeparator to Order Reception (SAP ERP system asynchronous) 15 1 Right Click on: Integration Flows:
New Integration Flow
Name:
_EDI_Separator_ORDERS_to_SA
PSystemDev __
ID:
_EDI_Separator_ORDERS_ECC
Click: Finish
PO B2B Add-on implementation scenarios.
2 assign System
3 Assign Interface
4 Assign referenced channel at
Sender
5 Assign your receiver system:
**SAP Business system
PO B2B Add-on implementation scenarios.
Assign Operation
7 assign Operation Mapping:
OM_ORDERS96A_TO_ORDERS05
8 assign Interface at receiver
9 assign Channel at receiver
Idoc sender channel.
Integration flow II created.
Click: Save
and
PO B2B Add-on implementation scenarios.
Create Integration directory objects for Integration flow III: fr om EDISeparator to Invoice Reception (SAP ERP System
synchronous)
16 1 Under EDI_Separator create
Sender Communication channel:
EDI_Separator_INVOICE_Sender
Click: Finish
2 set up channel on General Details
tab:
Adapter Type: EDISeparator
Direction: Sender
Protocol: EDIFACT
Click: Save
17 Set up:
EDI_Separator_INVOICE_Sender
Adapter specific tab:
Message type: INVOICE
Click: Save
18 Set up:
EDI_Separator_INVOICE_Sender
Modules Tab:
Number Module Name Type Module Key
1 localejbs/TPMContentAccessModule Local Enterprise Bean TPM
2 localejbs/EDISearchParametersModule Local Enterprise Bean EDISEA
3 localejbs/EdifactConverterModule Local Enterprise Bean EDIFAC
4 localejbs/CallSapAdapter Local Enterprise Bean entry
Module key Parameter Name Parameter Value
TPM enable.ediAckProfile true
TPM enable.edisepUsage true
EDIFAC edif act.audit true
EDIFAC tpm.enable true
PO B2B Add-on implementation scenarios.
1 Process Sequence
Follow same sequence as picture
2 Module Configuration
Sort is not relevant
Click: Save
and
Create Integration directory objects for Integration flow III: from EDISeparator to Invoice Reception (SAP ERP System
synchronous)
19 1 Right Click on: Integration Flows:
New Integration Flow
Name:
_EDI_Separator_INVOICE_to_SAP
SystemDev __
ID:
_EDI_Separator_INVOICE_ECC
Click: Finish
PO B2B Add-on implementation scenarios.
2 assign System
3 Assign Interface
4 Assign referenced channel at
Sender
5 Assign your receiver system:
**SAP Business system
6 Assign Operation
PO B2B Add-on implementation scenarios.
7 assign Operation Mapping:
8 assign Interface at receive
9 assign Channel at receiver
Idoc sender channel.
Integration flow II created.
Click: Save
and
20
At these point we have created 3
integrated flows on NWDS and we
need to deploy
Right click on each iFlow and deploy
them
We have to set up Partners and agreements on TPM http:<localhost:port>/b2bic
21 Log on http:<localhost:port>/b2bic
And click on Trading Partner
Management
PO B2B Add-on implementation scenarios.
22
1 add new Partner for Customer
(sender system).
2 at General tab insert a name and
assign to an existing Party
(mandatory)
Partner type: Customer
3 at identities tab:
Add identifier and agency code 014
Identifier is sender GLN incoming
EDIFACT file
4 Add messages types
Click:
Others tabs are not relevant.
23
1 add new Partner for Owncompany
(receiver system).
PO B2B Add-on implementation scenarios.
2 at General tab insert a name and
assign to an existing Party
(mandatory)
Partner type: Self
3 at identities tab:
Add identifier and agency code 014
Click:
Others tabs are not relevant.
24
Once we have created Partners now
i t’s time to add agreements:
One agreements per message.
25
Create INVOICE agreement
between partners
Use match code to fulfi ll right picture
Click:
PO B2B Add-on implementation scenarios.
26
Create ORDERS agreement
between partners
Use match code to fulfi ll right picture
Click:
Configuration is done and now you have to test And monitoring it.
T1 Prepare test fi le to use it.
T2 Open Mendelson tool and send a
fi le to your PO system:
1 send fi le to Partner
2 Choose fi le
3 Click: OK
T3 Message is sent to PO OK from
Mendelson and MDN received.
T4 Go to monitoring in PO server
PO B2B Add-on implementation scenarios.
As you can see fi le is spited and
flows processed.
T5 You can click on success messages
and change to B2B monitoring
And see all details about MDN,
Functional ACK, etc…
To check first ICO MDN by
separated you can check under tab
B2B ACK on monitor.
To get all these details it’s importat
to set up module
localejbs/EDISearchParametersModule
Under EDI separator Sender
Channel.
References ADD-On Solutions for SAP NetWeaver Process Orche stration
Simple Use Cases for B2B NRO and Archive Module Configuration
B2B- EDI Inbound -Step by Step Configuration
Wiki B2B addon
END OF DOCUMENT
top related