GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

ATLAS RPC distribution racksChannel mapping after LS2 upgrade

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

New P&ID for future racks:

-Instead of High and Low flow line => One line with regulation valve. Goal: Smooth regulation

GAS group weekly meeting 04/03/2019 Kacper KapusniakEP/DT/FS

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

Rack 63:

-New manifold to be added

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

Summary:

-All channels will be displayed in SCADA. Unused/not connected will have indication.-2 channels will be moved inside the rack to empty space for dummy chambers.

-Dummy chambers – installed in last available place in manifold and in SCADA.