at , we rely on we have been delivering - canmec

Post on 02-Oct-2021

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

We have been delivering

Y O U R p r o j e c t s !

W e d e l i v e r

Y O U R p r o j e c t s !

What our clients say…

For 30 years!

« They have a strong team of project managers and designers and an efficient

installation crew. They have a high production capacity (150, 000 ft²) and an excellent

quality-cost-deadline ratio. »

canmec.com

4 1 8 . 5 4 3 . 1 5 1 51.844.533.1515

1750 La Grande Saguenay QC G7K 1H7 Canada

Hydropower

• Design• Manufacturing• Machining• Installation• Industrial mechanics

INNOVATION:ON SITE MACHINING

We have the ability to provide machining services directly on site.

At , we rely on a management team that is experienced in large-scale “turnkey” projects. That is how we can effectively manage every stage from design to commissioning in order to guarantee the quality of YOUR project.

ENGINEERING

MANUFACTURING

MAINTENANCE

INSTALLATION

Hydropower Generating StationWater intakes, draft tubes and spillways

• Gates and trash racks• Hoists and lifting

structures• Overhead cranes up to

300 tonnes• Gantry cranes• Embedded parts • Penstocks and

bifurcations• Turbine components• Steel structures

Proud partner in the development of the HYDROPOWERindustry

Manitoba Hyro, Keeask Project, ManitobaAndritz Hydro - Nalcor, Muskrat Falls Projet, LabradorOPG/Kiewit, Lower Matagamie, OntarioRio Tinto Alcan, Centrale Shipshaw, QuébecHydro-Québec, La Romaine 1, 2, 3 et 4, QuébecHydro-Québec, Centrale Paugan, QuébecHydro-Québec, Rivière Eastmain, QuébecManitoba Hydro, Wuskwatim, ManitobaHydro-Québec, Rapides-Des-Coeurs, Chute Allard, QuébecHydro-Québec, Ruper River, QuébecHydro-Québec, Eastmain 1-A, QuébecLitostroj, Rapide-Des-Coeurs, Chute Allard, QuébecHydro-Québec, Péribonka, QuébecHydro-Québec, Saguenay, QuébecHydro-Québec, Sainte-Marguerite, Québec

Ongoing and c omp l e t e d projects:

top related