Jeremy Aston BSc (Hons), FRICS

Chartered Building SurveyorPRINCE2 Practitioner

Education, Qualifications & Training

2014 – Passed the Assessment for Readiness – Planning Inspectorate2010 – CPD Approved by RICS Committee 2009 - Chartered Project Management Surveyor 2007 - APMG-UK - PRINCE2 Practitioner1997 – Elected a Fellow of the Royal Institution – FRICS1986 – Chartered Building Surveyor – MRICS1984 – University of Reading 2/1 Honours Degree Building Magazine Prize for ‘best in year’ at Graduation

1980 – Weston Technical College – A levels and TEC Engineering

Jeremy Aston

Examples of Estate and Project Work

Jeremy Aston

MOD, Defence Estate, Wessex

Estates Strategy• Represented MOD’s interests across Wessex in LDF/RSS.• Engaged with key stakeholders, LPA’s , Environment Agency etc.• Established best practice.

Projects• 1,000 new homes around the Salisbury Plain

• Full EIA• Flood modelling• Archaeological Investigations• Public Consultation

• Relocation of HM British Land Forces UK• Rescued the project when the PFI team failed to achieve consent• Achieved planning consent.• Negotiated the legal agreements.

• Dorset Heathland Protection• Represented MOD’s interests

Jeremy Aston

MOD, Defence Estate, Wessex – Example 1 – Housing Development

• NEQ – 1,000 new homes• Flood Risk Assessment• New Link/Relief Road• Full Environmental Impact Assessment

• Public Consultation• Stakeholders - Town Council, Environment Agency, Natural England, RSPB, County Highways, Cholderton Estate Water Co and Veolia

Jeremy Aston

MOD, Defence Estate, Wessex – Example 2 – Project Hyperion

• Project Hyperion £50M PFI• Relocation of HM British Land Forces UK • Symonds Capita and Capita Percy Thomas• Personally resolved complex planning issues

• Identified and engaged with key stakeholders – Test Valley Borough

Council, Highways Agency, Parish Council, County Highways.• Negotiated 106 and 278 agreements.• Dealt directly with CEO and 2* General

Jeremy Aston

Pershore Hydro – 240kW with 11kV private wire connection to Leisure Centre

• Joined project at pre-construction stage• Project assurance identified design issue• Unlocked final consents• Supported client on financing• Led the detailed HV design and construction• Delivered successfully

Jeremy Aston

Bespoke Residential

• Traditional and contemporary• Access for construction by water • Complex technical challenges

Jeremy Aston

NTL, WinchesterEstates Strategy

• Created and implemented an effective estates strategy.• Engaged with key stakeholders, LPA’s , Environment Agency etc.• Resolved sensitive neighbour issues

Projects• Relocated:

•Sewage Treatment Plant•Workshop and stores•A Business division

• Optimised the Use of Space• International satellite teleport

• identified, acquired, negotiated consents• led design and development of a £10M international satellite teleport.

I was also appointed to coordinate the integration of two £50M businesses into the parent company.

Jeremy Aston

Nationally Significant Infrastructure ProjectsThe River Humber Replacement Gas Pipeline

• £150M project replacing a 6km gas pipeline - new tunnel beneath the Humber.

• A project of National significance.

• A highly sensitive location with international environmental protection.

• Complex land rights and compulsory acquisition matters.

• Appointed sole examiner on behalf of the Secretary of State for Energy.

Jeremy Aston

Nationally Significant Infrastructure ProjectsDogger Bank A & B Offshore Wind Farm

• £6-8 Billion project - will become the worlds largest offshore windfarm.

• 1,200 Turbines (all x3 phases) generating 7.2 GW located 180miles offshore.

• A highly sensitive location - bird strike and harbour porpoise.

• Complex balance of business interests – route through 3rd party land.

• Appointed one of a panel of three on behalf of the Secretary of State for Energy.

Jeremy Aston

Estates and Maintenance PlanningMaintenance Plan

• Created a comprehensive estate record.

• Set up planned and reactive maintenance strategies.

• Migrated from paper drawings to CAD.

Projects• Refurbishment of operational branches.

• PM of the installation of new high street premises.

• Maintenance and service systems for fire and security.

• Statutory compliance and Health and Safety.

Jeremy Aston

Estates Maintenance and Services

Faculty Building Manager• Responsible for maintenance works and estates advice.

• Faculty of Science, School of Management, Library, Winchester School of Arts, Chaplaincy, Staff Association, Sports and Recreation Department.

• Supported the newly appointed Director of Estates during the implementation of business change.

Jeremy Aston

Estate Data Capture and Estate PlanningConsultant Building Surveyor – Cornwall County Education Estate:

• Statutory compliance audits• Condition Surveys

• DDA surveys

• External play space and safeguarding improvements

• Asbestos surveys

• Fire Risk surveys

Salisbury Health Authority:

• Estate surveys

• Feasibility and estate strategy

Jeremy Aston

NTL, Winchester

Jeremy Aston

25 acre, £10M, International Satellite Teleport & Science Education Facility

Identified the opportunity, led acquisition, delivered the planning consent, assembled a team and designed and constructed the facility.

NTL, Winchester

Jeremy Aston

A Millenium Project for Winchester• Intec 2000• NTL• Hotel

NTL, Winchester

Jeremy Aston

Aerial View

NTL, Winchester

Jeremy Aston

Fierce Opposition

NTL, Winchester

Jeremy Aston

NTL, Winchester

Jeremy Aston

The Vision..........

Achieved

FeedbackPershore Hydro – Charles Hudson, Wyke Manor (ICE Award – 2015)‘Jeremy joined the project at a crucial time with great enthusiasm and knowledge…I would certainly employ him again on future projects and have no hesitation recommending him to others’

Gloucester City – Director of Museums and Art ‘ we are all agreed – you did a ‘fantastic job’

Godfrey Tarling – Head of Projects, Glos City‘Achieving the tender of 4 projects, planning and Listed Building consent within a tight timescale is a clear mark of the professional way in which you enabled a critical stage of the project.’

Kendall Kingscott – Director Mark Stitson‘The arrangement has once again worked extremely well for us’

MOD, Defence Estate – David Wiltshire‘it has been a pleasure to work with you’’