architecture portfolio braden pedersen
Post on 06-Mar-2016
230 Views
Preview:
DESCRIPTION
TRANSCRIPT
BRADEN PEDERSENArchitecture Portfolio
University of SydneyMaster of Architecture Student
Selected Works
BRADEN PEDERSEN1118/2 Chippendale WayChippendale, NSW 2008
E | mail@bradenpedersen.com W | bradenpedersen.com
M | 0411554020
| 2 |
Contents01 Digital Masters Research Studio | Terra-form Eyre
02 Sustainable Masters Research Studio | Student Housing03 Flinders St Station Design Compertition | Melbourne Opera House
04 Masters Contract Documentation | Maitland Art Gallery
Masters Digital Reserch StudioTerra-form Eyre
Semester 2, 2013Tutor: Alex Jung
In partnership with:Emma Mackellar
| 4 |
| 6 |
Reversing the force of desertification is the primary objective of this proposal. Through this simple act, issues of overpopulation, food production and climate change are drastically reduced globally. Australia is a land of vast plains of desert. Much of this region is lower than sea level- Lake Eyre is at the heart of this basin. Its catchment area is 1,200,000 m2. Lake Eyre flooded in 2010 and lowered the mean global sea level by 10mm because it took over 6 months for water to evaporate and slowly be returned out to sea. Through its capacity to seed clouds the vast structure enables the water within lake eyre to be retained permanently and increased. In doing so it alters the regional climate, terraforming the desert into fertile land.
Structure:The city is conceived as a singular structure- a physical manifestation of the conceptual ideal of a city that is ‘self supporting.’
The cloud seeding tower must be 600 metres tall in order for the air collumn to affect the troposphere . This height is enabled by percieving the structure like a suspension bridge. enabled by percieving the structure like a suspension bridge. The large central pylon is in compresion while cables allow the bridge to be suspended. The entire city acts in tension- its form generated by efficient membrane structures exempliied in Frei- Otto’s Olympic stadium in Munich.
Vertical City:Existing modes of urban densiication cause desertiication. Natural vegetation prevents the nutrient rich bio-diverse top-soil from eroding. As demand on agricultural regions in-creases, this vegetatiation is removed.
By concieving the city as vertical rather than horizontal it is By concieving the city as vertical rather than horizontal it is possible to mitigate desertiication. Greater efficiency in transort and land usage also result.
When urban and agricultural land is integrated, the city unit can become independant of external supply. It can expand limitlessly without affecting its efficiency. =
Masters Sustainable Reserch StudioStudent Housing
Semester 1, 2013Tutor: Paul Berkemeier
In partnership with:Mark Szekely
| 8 |
There is a desperate need for additional student housing at the University of Sydney. Current housing options are limited and insufficient to match student demand. This project is aimed at maximising the number of students housed whilst minimising the cost of housing to the students. The project is built on a small left over site on campus, the roof of the electrical engineering building, to reduce costs and re-adapt an existing building. The building creates a rich and sustainable living environment for students through passive design principals such as solar access, ventilation, thermal mass, water harvesting and power generation.
| 10 |
Flinders St Station Design CompertitionMelbourne Opera House
2012Tutor: Samantha Donally
| 12 |
| 14 |
Melbourne is known to be the cultural capital of Australia but is missing one important land- mark in the city. The central location of the Flinders Street Station site made it a desirable location for a cultural precinct which included an Opera House. The Opera House has been integrated in to the existing Banana Ally Vaults which are used for performances and events. The site has been linked to the cultural precinct on Southbank creating additional connections over the Yarra River. The landscape has been folded to create a sense of intrigue for the visitors and to form pocket spaces for the train station and performance venues. The forms add to the strong geometries already evident in Melbourne creating a noticeable icon for the city. The form came from a combination of digital and analogue processes exploring spaces with strong geometries to complement the architecture already existing in Melbourne.
Masters Contract DocumentationMaitland Art Gallery
2013Tutor: Peter Armstrong
In partnership with:Courtney Owen
Vi LeZoya Kuptsova
Kim Lange
| 16 |
GROUND FLOOR PLANDRAWING TITLE
DATE
REVISION
SCALE
DRAWING NO.
DRAWN BY
CD-03
atelier fiveWILKINSON BUILDING148 CITY ROADDARLINGTON NSW 2320ABN: 70 509 392 275(e) studio@atelierfive.com(p) 02 9559 4595 (f) 02 9558 4582
ARCHITECT
PROJECT
CLIENT
EXTENSIONS TO THE MAITLANDREGIONAL ART GALLERY
MAITLAND CITY COUNCIL
MAITLAND TECHNICAL COLLEGE230 HIGH STREET MAITLAND NSW 2320
PO BOX 220MAITLAND NSW 2320
NOT FOR CONSTRUCTION
- ALL INFORMATION CONTAINED ON THIS DRAWING IS COPYRIGHT. NO PART OF THIS DRAWING MAY BE COPIED OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE AUTHOR.- DO NOT SCALE FROM THIS DRAWING- CHECK ALL DIMENSIONS ON SITE- THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM UNAUTHORISED USE OF ANY INFORMATION ON THIS DRAWING
A1
REV NOTES DATEA ISSUE FOR TENDER 10/11/2013
N
15/11/20131:100 @ A1 VL, ZK, CO, BP
A
EXIT
ACCESS
exX
ELECTRICAL LEGEND
ADJUSTABLE DOWNLIGHT
JOINERY DOWNLIGHT
WALL LIGHT
EXIT SIGN
RECESSED MULTILIGHTS
FLUORESCENT BATTON
SWITCH
EXHAUST
IN-CEILING SPEAKERS
ACCESS HATCH
SMOKE DETECTOR
NOTES
NOTE 1: ALL CEILINGS ARE SETPLASTERBOARD UNLESS NOTEDOTHERWISE
NOTE 2: OUTDOOR LIGHTING TO BEADVISED BY LANDSCAPE CONSULTANTS
NOTE 3: JOINERY LIGHTING TO BECONFIRMED BY ELECTRICAL CONSULTANT
NOTE 4: GPO QUANTITY, LOCATION ANDTYPE TO BE CONFIRMED BY ELECTRICALCONSULTANT
NOTE 5: ALL LIGHTING SYSTEMS, EXTERNALLIGHTS, WALL LIGHTS AND MULTILIGHTSYSTEMS ARE TO HAVE REMOTE CONTROLSWITCHES LOCATING IN THE GROUNDFLOOR STOREROOM
PROJECT LEGENDBGCOLCONCCOSCRDPEXFBFCFFLFWGDHBHRMSNGLOFPBRLRTRWTIMURWC
BOX GUTTERCOLUMNCONCRETECHECK ON SITECEMENT RENDERDOWNPIPEEXISTINGFACE BRICKFIBRE CEMENTFINISHED FLOOR LEVELFLOOR WASHGRATED DRAINHAND BASINHAND RAILMETAL ROOF SHEETINGNATURAL GROUND LEVELOVER FLOWPLASTERBOARDREDUCED LEVELROOF TILESRETAINING WALLTIMBERURINALTOILET
W
D
FFL
PRECAST CONCRETEWALLS TO ENG. DETAIL
SELECT STYLE EXTERNALCLADDING AS SPEC.CONCRETE BLOCK WALLSWITH PAINT FINISH ASSPECIFIED
EXG BUILDING RETAINED
WALL CONSTRUCTION ASSPECIFIEDNEW WINDOWS
EXISTING DOORS
NEW DOORS
WINDOW NUMBERS
DOOR NUMBERS
FINISHED FLOOR LEVELS
D12 D11 D10
J A M E S S T R E E T
D03 D04
D05
D02
D06
D09
D17
D16 D15
W01
D01
D07
D08
D14
D18
D20
D19
2,480 5,900 4,250
4,59
05,
050
8,85
08,
850
6,10
06,
750
6,20
0
5,900
17,530 2,480 5,900 4,25013,290 14,825 7,480 8,840
380 3445 110 1,570 110 2,590 110 4,310 110 10,980 110 4,210 380 2,550 200
4,270 110 905 110 3,300 110 4,970 110 10,220 200 2,920 1,350
4,59
05,
050
8,85
08,
850
6,10
06,
750
7,97
0
2,87
55,
160
5,00
01,
390
1,34
090
3,42
03,
740
901,
795
903,
740
902,
725
1,35
02,
290
9013
4020
02,
160
200
860
9012
,440
2,290 1,200 2,080
5,690 10,940
4,50
038
0
1,12
511
03,
260
5,37
01,
200
200
2,17
520
02,
090
200
2,13
06,
570
425
1,95
020
01,
925
360
PRECAST CONCRETE WALLWITH POLISHED FINISH
PROVIDE AGG. LINE WITHGEOTECH FABRIC SLEEVEWITHIN AGGREGATE FILL ANDDRAINAGE CELL PROTECTIONTO W.P.M AS SPECIFIED
900H CEMENT RENDEREDBLOCKWORK RETAININGWALLS TO ENG. DETAIL
CONCRETE STAIRS, NATURALFINISH
GRATED DRAINS TO ENG.DETAIL
SET DOWN STRUCTURALFLOOR LEVEL TO WET AREASTO ENG. DETAIL
TILED FINISH TO BLOCKWORKWALL AS SPECIFIED
HATCH INDICATES EXTENTOF TIMBER FLOORCONSTRUCTION
CONNECT DOWNPIPES TO NEWSTORMWATER DRAINAGE SYSTEM INACCORDANCE WITH ENG. DETAIL
TILE FINISH TO EXTERNALCONCRETE BLOCK WALLS
REMOVE EX. WINDOWS TOALLOW FOR NEWALUMINIUM FRAMED BI-FOLD DOORS. MAKE GOODEX. AS REQUIRED
ALUMINIUM FRAMED WINDOWSAND DOORS
STEEL FRAMED EXTERNALSTAIRS AS SPECIFIED AND TOSUIT BCA REQUIREMENTS
TIMBER FLOORS AND DECKINGALLOW FOR INSULATIONINTERNALLY AS SPECIFIED
TIMBER FLOOR CONSTRUCTIONTO ENGINEERS DETAIL
1000H METAL HANDRAIL ANDBALUSTRADES TO SUIT BCAREQUIREMENTS
STORMWATER PIT TO ENG.DETAIL
REINFORCED CONCRETECOLUMNS TO ENG. DETAIL
INTERNAL PLASTERBOARD LININGWITH PAINT FINISH AS PERSPECIFICATION
SELECT STYLE EXTERNAL CLADDINGALLOW FOR INSULATION ANDSARKING IN ACCORDANCE WITHSPECIFICATION
PRECAST CONCRETE WALLS TO ENG.DETAIL
ALUMINIUM FRAMED SLIDING DOORSTO GALLERY BACK ROOMS TOMANUFACTURERS INSTRUCTIONS
ROLLER DOOR TO LOADING DOCK TOMANUFACTURERS DETAIL
METAL BOLLARDS AS SPECIFIED
SELECT STYLE EXTERNAL CLADDINGAS SPECIFIED. ALLOW TO PACK OUTWALL FOR ANGULAR CONSTRUCTION
NEW STEEL GUTTERS ANDDOWNPIPES AS SPECIFIED
H I
G H
S
T R
E E
T
GARDENSOFT LANDSCAPING
FRONTENTRANCE
CONCRETE
CONCRETE PATH
RL 8.9
FFL 8.9
RL 8.1
RL 8.9
FEMALEWCTILESFFL 8.9
STORETILES
DISABLED WCTILESFFL 8.9
MALE WCTILESFFL 8.9
KITCHENSTORE
TILESFFL 8.9KITCHEN
TILESFFL 8.9
FRONTENTRANCE
CONCRETEFFL 8.9
CAFETIMBER
FFL 8.9
ENTRANCEFOYERCONCRETE
SHOPCONCRETE
FFL 8.9
STORECONCRETE
BIN STORECONCRETE
FFL 7.4
FFL 7.4
DECKTIMBER
FFL 8.9
FIREEXIT
FIREEXIT
FFL 8.9
COL COL
COL COL
COLCOL
COL COL
COLCOL
GALLERY B/1CONCRETE
FFL 8.9 CONCRETEFOOT PATH
PICTURESTORECONCRETE
FFL 8.9
LOADINGCONCRETE
FFL 8.9
STOREROOMCONCRETE
FFL 8.9
DP
DPBOLLARD
BOLLARD
DECKTIMBER
FFL 8.9
HR
HR
STORETIMBER
FFL 8.9
FIREEXIT
HRHR
GALLERY B/2TIMBER
FFL 8.9
EX
EXSE
RVI
CES
SER
VIC
ES
EX
REAR GARDENSOFT LANDSCAPINGRETAIN EXISTING GROUND
LEVELS UNCHANGED
SIDE GARDENSOFT LANDSCAPINGRETAIN EXISTING GROUND
LEVELS UNCHANGED
BOUNDARY
EX STAIRUNCHANGED
EX. ENTRY
CONCRETEFOOT PATH
CONCRETEFOOT PATHG
ATE
BOUN
DARY
BOUN
DARY
AWNING OVER
BIN STORECONCRETE
STORECONCRETE
JOINERY JOINERY
JOINERY
WINDOW OVER
BRIDGE OVER
No. 230MAITLAND
REGIONAL ARTGALLERY
EXG. BRICKBUILDING
TILED ROOF
D.P. 581007SITE AREA 5540.18 sqm
W03W02
W04
WIN
DOW
OVE
R
D13
BRIDGE OVER
BUILD
ING
OVER
W06
W05
WINDOW OVER
FEMALE STORE DISABLED MALE KITCHEN STORE BIN STORE
DECKCAFEKITCHENMALEHALL
FEMA
LEHA
LLEN
TRY
1
2
3
4 5
EXSE
RVIC
ESEX
SERV
ICES
STAI
RST
ORE
GALL
ERY
B/2
VOID
LIFT
STOR
EDE
CKST
AIR
ANGLED WALL OVERSTORE LIFTHALL
STAIR
STOREROOM LOADING FIRE EXIT
GALLERY B/1
MALE
MALE
KITC
HEN
KITC
HEN
KITC
HEN
SHOP
CAFE
KITC
HEN
KITC
HEN
STOR
E
BIN
STOR
EBI
N ST
ORE
STAI
R
STOR
E
STOR
E RO
OMS
PICT
URE
STOR
E
PICT
URE
STOR
EGA
LLER
Y B/
1
GALL
ERY
B/1
GALL
ERY
B/1
GALL
ERY
B/2
STOR
EFO
YER
FOYE
R
FOYE
R
FOYE
R
ENTR
Y
DECK DE
CK
SETOUTPOINT
RW
RW
RW
RW
RAMP GRADIENT 1:12
D23
D22 D21
D24
D25
DCBA
1
2
3
4
5
6
7
DCBA
1
2
3
4
5
6
7
6,65
05,
160
57511
090
011
02,
535
380
1,975903,0402001,40090435
200 4,260 200 4,220 200 1,350 350
8,380
27,4
60
725
3,67
552
08,
850
4,40
01,
000
8,29
020
06,
035
8,86
01,
125
110
2,66
5
5,77
320
03,
750
200
3,40
020
03,
400
200
1,14
020
06,
035
8,86
011
03,
260
380
17,7
2020
017
,735
7,31
05,
460
378
1,72
711
01,
800
1,60
0
4,54
020
04,
830
200
9,25
08,
440
150
7,31
05,
370
3,24
011
02,
400
380
1,20
015
0
B
B
A
A
C C
D D
ALUMINIUM FRAMEDDOUBLE HEIGHT WINDOWAS SPECIFIED
HATCH INDICATES EXTENT OFTIMBER FLOORCONSTRUCTION
RETAIN AND MAKE GOOD EX.OPENINGS
PROVIDE NEW FRAMED WALLAS INDICATED TO ALLOW FORSERVICES PROVIDEPLASTERBOARD AND PAINTFINISH AS SPECIFIED
STEEL FRAMED STAIRS WITHTIMBER LINING AS SPECIFIED
LIFT INSTALLED TO MANUFACTURERSSPECIFICATION
STEEL FRAMED EXTERNAL STAIRS ASSPECIFIED AND TO SUIT BCAREQUIREMENTS
EXISTINGGALLERY
REMAIN UNCHANGED UNLESSNOTED OTHERWISE
LIFT
D26
EXISTINGGALLERY
REMAIN UNCHANGED UNLESSNOTED OTHERWISE
01 PROPOSEDGROUND FLOOR PLAN 1:100
The aim of this project was to to complete all contract documentation required for tender from a sketch level design. The project was for the all ready existing extension to the Maitland Regional Art Gallery for Maitland City Council. Being the project architect I was responsible for looking after a team of 5 and scheduling the work that needed to be completed in 6 weeks. For this project we produced 24 working drawings, specifications and cost control for the building project showing an ability to communicate this documentation to clients, statutory authorities, consultants, tenderers, contractors and sub-contractors.
| 18 |
DETAILS (4)DRAWING TITLE
DATE
REVISION
SCALE
DRAWING NO.
DRAWN BY
CD-20
atelier fiveWILKINSON BUILDING148 CITY ROADDARLINGTON NSW 2320ABN: 70 509 392 275(e) studio@atelierfive.com(p) 02 9559 4595 (f) 02 9558 4582
ARCHITECT
PROJECT
CLIENT
EXTENSIONS TO THE MAITLANDREGIONAL ART GALLERY
MAITLAND CITY COUNCIL
MAITLAND TECHNICAL COLLEGE230 HIGH STREET MAITLAND NSW 2320
PO BOX 220MAITLAND NSW 2320
NOT FOR CONSTRUCTION
- ALL INFORMATION CONTAINED ON THIS DRAWING IS COPYRIGHT. NO PART OF THIS DRAWING MAY BE COPIED OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE AUTHOR.- DO NOT SCALE FROM THIS DRAWING- CHECK ALL DIMENSIONS ON SITE- THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM UNAUTHORISED USE OF ANY INFORMATION ON THIS DRAWING
A1
REV NOTES DATEA ISSUE FOR TENDER 10/11/2013
N
15/11/20131:5 @ A1 VL, ZK, CO, BP
A
PROJECT LEGEND
PRECAST CONCRETEWALLS TO ENG. DETAIL
SELECT STYLE EXTERNALCLADDING AS SPEC.CONCRETE BLOCK WALLSWITH PAINT FINISH ASSPECIFIEDEXG BUILDING RETAINED
INSULATION AS SPEC.
SPANDEK DECKING ASSPECIFIED
BOX GUTTER HANGINGSUPORTS AT 600mmCENTRES
ROOF SUPPORT STRUCTURE TOENGINEERS DETAILS
ROOF BEAM TO ENGINEERSDETAILS
13mm PLASTERBOARDCEILING FIXED TO TOP
HAT SECTIONS
INSULATION
FIBRE CEMENTBOARD ON TOP OF
DECKING
GALVANISED STEEL BOXGUTTER SUPPORTED BY
FIBRE CEMENT BOARD
MS GIRT SECTION
METAL DECK ROOFSHEETING AS SPECIFIEDWITH 2DEG PITCH FIXED
TO PURLINSACOUSTIC 50mm
INSULATION, SISILATIONAND SAFTEY MESH TO
RUN UNDER ROOFSHEETING
CORRUGATED METALSHEET CLADDINGFIXED TO TOP HATSECTION
TOP HAT SECTIONFIXED TO PRECASTCONCRETE
PRECAST CONCRETEPANEL TO ENGINEERSDETAIL
FLASHING OVERGUTTER EDGE FIXEDTO PRECASTCONCRETE PANEL
SPANDEK DECKING ASSPECIFIED
BOX GUTTER HANGINGSUPORTS AT 600mmCENTRES
ROOF SUPPORTSTRUCTURE TOENGINEERS DETAILS
FIBRE CEMENT BOARD ONTOP OF DECKING
GALVANISED STEELBOX GUTTERSUPPORTED BY FIBRECEMENT BOARD
Z PURLIN
STEEL STRUCTURE TOENGINEERS DETAILS
CORRUGATED METALCLADDING FIXED TO TOPHAT SECTION
FIBRE CEMENT SHEETINGFIXED TO TOP HATSECTIONS WITH INSULATION
100mm STEEL STUD FRAME
13mm PLASTERBOARDFIXED TO STEEL STUD
FRAME
SHADOW GAP ANGLE
UB TO STRUCTURALENGINEERS DETAIL
INSULATION AS SPECIFIED
13mm PLASTERBOARDCEILING
RONDO SUSPENDEDCEILING SYSTEM FROM
ROOF PURLINS
SHS TO ENGINEERSDETAIL
PACKING ASREQUIRED
METAL PARAPETOVER PRECAST
CONCRETE PANEL
METAL KLIP LOCKROOF SHEETING
FIXED TO PURLINS
STEEL PORTAL FRAMEBEYOND TO
ENGINEERS DETAILS
INSULATION,SISILATION AND
SAFTEY MESH ASSPECIFIED
PACKING AS REQUIRED
MARINE PLY
FIX STRAP
BOX GUTTER DETAIL1:5CD14
M
PRECAST PARAPET/ WALL/ ROOF DETAIL1:5CD16
L
DETAILS (3)DRAWING TITLE
DATE
REVISION
SCALE
DRAWING NO.
DRAWN BY
CD-19
atelier fiveWILKINSON BUILDING148 CITY ROADDARLINGTON NSW 2320ABN: 70 509 392 275(e) studio@atelierfive.com(p) 02 9559 4595 (f) 02 9558 4582
ARCHITECT
PROJECT
CLIENT
EXTENSIONS TO THE MAITLANDREGIONAL ART GALLERY
MAITLAND CITY COUNCIL
MAITLAND TECHNICAL COLLEGE230 HIGH STREET MAITLAND NSW 2320
PO BOX 220MAITLAND NSW 2320
NOT FOR CONSTRUCTION
- ALL INFORMATION CONTAINED ON THIS DRAWING IS COPYRIGHT. NO PART OF THIS DRAWING MAY BE COPIED OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE AUTHOR.- DO NOT SCALE FROM THIS DRAWING- CHECK ALL DIMENSIONS ON SITE- THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM UNAUTHORISED USE OF ANY INFORMATION ON THIS DRAWING
A1
REV NOTES DATEA ISSUE FOR TENDER 10/11/2013
N
15/11/20131:5 @ A1 VL, ZK, CO, BP
A
PROJECT LEGEND
PRECAST CONCRETEWALLS TO ENG. DETAIL
SELECT STYLE EXTERNALCLADDING AS SPEC.CONCRETE BLOCK WALLSWITH PAINT FINISH ASSPECIFIEDEXG BUILDING RETAINED
INSULATION AS SPEC.
METAL DECK ROOFSHEETING AS SPECIFIED
WITH 2DEG PITCH FIXED TOPURLINS
ACOUSTIC 50mmINSULATION,
SISILATION ANDSAFTEY MESH TO RUN
UNDER ROOFSHEETING
ROOF PURLINSTO ENGINEERSDETAILS
200UB BEAM TOENGINEERS DETAILS
STEEL STUD WORKWITH ACOUSTIC
INSULATIONRONDO SUSPENDEDCEILING SYSTEMFROM ROOF PURLINS
BIFOLD DOOR HEADINSTALLED TOMANUFACTURER'SDETAIL AS SPECIFIED
FIBRE CEMENTSHEETING TO BE
FINISHEDACCORDING TOSPECIFICATION
SHADOW GAP ANGLE
13mm PLASTERBOARDFIXED TO STEEL STUDWORK
100mm STEEL STUD WALL
13MM PLASTERBOARDCELINGFIBRE CEMENT SHEETING
FIXED TO SUSPENDEDCEILING SYSTEM
30mm FURRING CHANNEL
50mm INSULATION BATSAS SPECIFIED
METAL FLASHING ASSPECIFIED
ROOF STRUCTURE TOENGINEERS DETAILS
RONDO SUSPENDEDCEILING SYSTEM
HUNG FROM ROOFPURLINS
50mm INSULATIONBATS AS SPECIFIED
13mm PLASTERBOARDCEILING PAINTED
STRUCTURAL UBBEAM TO ENGINEERSDETAILS
13mmPLASTERBOARD ONSTEEL STUDFRAMING
INSULATION ASSPECIFIED
GLAZING AS SPECIFIED
ALUMINIUM WINDOWINSTALLED TOMANUFACTURER'SDETAILS
ALPOLIC CLADDING PANNELWIITH SPECIFIED FINISH
INSTALLED TOMANUFACTURER'S DETAILS
CORRUGATED SHEETMETAL FIXED TO TOP
HAT SECTIONS
125mm TOP HAT SECTIONS
200mm PRECAST CONCRETETO ENGINEERS DETAILS
FIXING ANGLE FORPRECAST TO
CONCRETE SLAB
13mmPLASTERBOARDFIXED TO STEEL STUDFRAME
100mm STEEL STUDFRAME
INSULATION BATS
THICKENED STEEL PLATEOVER SERVICE DUCT
CONCRETEDOWNTURNED BEAM
SUPPORTING SLABAND PRECAST TO
ENGINEERS DETAILS
30mm TOP HAT SECTIONS
CONCRETE SLAB TOENGINEERS DETAILS
SUSPENSION RODSUPPORTED BYCONCRETE SLAB
RONDO SUSPENDEDCEILING
13mm PLASTERBOARD
METAL DECK ROOFSHEETING AS SPECIFIED
WITH 2DEG PITCH FIXED TOPURLINS
ACOUSTIC 50mmINSULATION, SISILATION
AND SAFTEY MESH TO RUNUNDER ROOF SHEETING
HEAD/ CEILING/ ROOF DETAIL1:5CD15
J
WALL/ WINDOW/ ROOF DETAIL1:5CD15
K
150634
477222
477220
bradenpedersen.com
top related