“ANALISA GERAKAN STRUKTUR JACKET TRIPOD WELLHEAD
PLATFORM, PADA PROSES INSTALASI DENGAN METODE ROLL-UP UPENDING”
Oleh : Yanisari (4306.100.002)
Dosen Pembimbing:
1. Ir. Jusuf Sutomo, M. Sc
2. Ir. Murdjito, M. Sc, EngNIP: 132.149.376
NIP: 131.287.547
Jurusan Teknik KelautanFakultas Teknologi Kelautan
Institut Teknologi Sepuluh NopemberSurabaya
LATAR BELAKANG
PERUMUSAN MASALAH
TUJUAN PENELITIAN
MANFAAT PENELITIAN
BATASAN MASALAHBATASAN MASALAH
METODOLOGI PENELITIAN
PEMODELAN ANALISA HASIL DAN PEMBAHASANPEMODELAN, ANALISA HASIL DAN PEMBAHASAN
11 Mengetahui kebutuhan proses ballasting untukdilakukan, selama proses roll‐up jacket berlangsungdengan melakukan analisa trim.
2g
Mengetahui gerakan barge dan struktur jacket akibat 2Mengetahui gerakan barge dan struktur jacket akibatkombinasi keduanya selama proses roll‐up jacket diatasbarge pada kondisi free floatingmaupunmooring.
3 Mengetahui gerakan struktur jacketselama proses upending.3 selama proses upending.
1 Selama proses roll up jacket bagaimana trim1 Selama proses roll‐up jacket bagaimana trimyang terjadi pada barge dan apakah diperlukan
proses ballasting?
Bagaimana gerakan barge dan struktur jacketakibat kombinasi keduanya selama proses roll‐ 2akibat kombinasi keduanya selama proses rollup jacket diatas barge pada kondisi free floating maupunmooring?
2Bagaimana gerakan struktur jacket selamaproses upending?3
Mengetahui respon yang terjadi selamai t l i d kproses instalasi dengan menggunakanMetode Roll-up Upending
pada Jacket tripod Kambuna IIpada Jacket tripod Kambuna II
Jacket Tripod Kambuna II milik Asia Petroleum Development LTD
Lokasi instalasi : Perairan Kambuna
Water depth : 36.1 meters.p
Barge yang digunakan : Prima Bahari IX
Lingkup analisa gerakantahap 1 : barge selama jacket dalam proses roll‐uptahap 2 : jacket saat tergantung pada tali crane
Tidak menganalisis skidway selama peluncuran.
(l j )
Analisa gerakanli 1 i i h i lli i ith i
(lanjutan)
analisa 1 : surging, swaying, heaving, rolling, yawing, pithcingHeading: 0⁰ (head seas), 45⁰ dan 90⁰ (beam seas).
analisa 2 : surginganalisa 2 : surgingHeading: 0⁰ (head seas),
Tidak menganalisis tegangan yang timbul barge dan jacket.da e ga a s s tega ga ya g t bu ba ge da jac et.
Aktifitas winching dan upending point pada transport barge tidakdiperhitungkan.
Derrick dari Jack‐Up Rig digunakan sebagai alat angkat utama.
Jacket
b ll d l f ( b )
Tabel 1. General Particular Jacket
Name KambunaWell Head Platform (Kambuna WHP)
Weight 160.00 tons
L.C.G at lift point ‐36.86 meters (‐ve Aft)
T.C.G at lift point 0.00 meters (‐ve barge port)
V.C.G at lift point 7.920 meters (above barge keel)
Gyration : Roll 1 532 metersGyration : Roll 1.532 meters
Gyration : Pitch 13.758 meters
Tabel 2 General Particular BargeTabel 2. General Particular Barge
BargeName Prima Bahari IXClass BKIClass BKIFlag IndonesiaLength (Overall) 70.104 metersBreadth (Moulded) 18.288 metersDepth (Moulded) 4.267 metersLightship weight 569.80 tonsL.C.G 0.00 meters (‐ve Aft)TC G 0 00 meters ( ve barge port)T.C.G 0.00 meters (‐ve barge port)V.C.G 3.55 meters (above barge keel)
Tabel 3. General Particular Barge dan Cargo
Combination Barge dan Cargo
g g
Displacement 1338.330 tonsMean Draft 1.200 metersL.C.G ‐0.5440 meters (‐ve Aft)T.C.G 0.000 meters (‐ve barge port)V.C.G 3.987 meters (above barge keel)GMT 20.713 metersG 280 3GML 280.713 metersTPI 29.714 long tonSubmerged Volume 2547.720 m3VCB 0 610 t ( b b k l)VCB 0.610 meters (above barge keel)Roll Gyration 5.458 metersPitch Gyration 20.875 metersYaw Gyration 21 230 metersYaw Gyration 21.230 meters
DataDataLingkungan
Kondisi Lingkungan 1 tahun.•Kecepatan Angin = 12 5 m/sKecepatan Angin 12.5 m/s•Tinggi Gelombang Significant = 1.2 m•Priode Rata‐rata = 4.2 s•Kecepatan Arus = 0.6 m/s•Jonswap Parameter (gamma) = 1.3159
Mulai
Studi literatur
Pengumpulan data :
1. Data jacket yang akan diinstalasi2. Data barge yang akan digunakan3. Data lingkungan gelombang, arus dan angin 1 tahunan
Pemodelan barge beserta tanki ballast dengan menggunakan software Maxsurf 9.6
Pemodelan posisi tinjauan jacket pada proses upending
Proses Roll-up Proses Upending
Menentukan ballasting dan cek stabilitas pada kondisi awal (өroll-up=0˚)
Menghitung komponen persamaan gerak
Cek trim yang terjadi selamaProses roll-up
Trim ≤ 1%LWL
Pembebanan gaya lingkungan(gelombang)
Menghitung gaya gelombang yang bekerja mengenai jacket
Trim ≤ 1%LWL barge
BallastingMenghitung respon jacket
tidak
ya A li R k J k t dya
A B
Analisa Respon gerakan Jacket pada Gelombang Reguler (Hs =1.2 m
T=4.2 detik)