agile produktentwicklung in kombination mit scrum und v-modell
Post on 11-May-2015
1.168 Views
Preview:
DESCRIPTION
TRANSCRIPT
© 2011 Intland Software 1
Agile Produktentwicklung in Kombination
mit SCRUM und V-MODELL
Janos Koppany & Michael Lukas
Intland Software GmbH
Agenda
• V-Modell
• Scrum
• Scrum vs. V-Modell
• Combination of Scrum and V-Modell in codeBeamer
• What is codeBeamer
• Scrum Wizard
• Live Demo
© 2011 Intland Software 2
V-Modell
Key elements:
• Process modules
• Validation and Tracebility
• Dependences between modules
• Tasks that have to be executed
• Iteration steps
© 2011 Intland Software 3
Scrum
Key elements:
• User stories
• Product Backlog
• Sprints
• Scrum Roles
(Scrum Master, Product Owner, Team)
© 2011 Intland Software 4
Scrum vs. V-Modell
© 2011 Intland Software 5
Scrum V-Modell
Advantages
•Light weighted process/ project management •Short iteration cycles, Sprints•Easy to learn
Advantages
•Clear definition of project phases•Complete overview about the whole process•Industry-proven
Disadvantages
•No overview about the whole process•High communi- cation effort (daily Scrum)•Less architectural overview
Disadvantages
•Less flexibility•No clear Resource disposition•Long iteration cycles
Combination of Scrum and V-Modell in codeBeamer
• In codeBeamer, the artecfacts of both methods are combined in
one project - allowing to use the roles for Scrum and the defined
roles in V-Modell.
© 2011 Intland Software 6
Requirements, Tasks, Test
SCM, Builds, Project overview
User Stories, Product Backlog, Sprint Plan,
Kanban, Release
In the release, all artifacts are combined together and give a complete overview about Scrum working items and V-Modell items.
With Scrum Wizard, the team can decide which Sprints should belong to which release or version.
With Scrum Wizard, the team can decide which Sprints should belong to which release or version.
codeBeamer
What is codeBeamer?
codeBeamer is the award winning agile Application Lifecycle Management
(ALM) solution for distributed software development.
codeBeamer provides agile planning, project management, knowledge
management, document management, task, requirement and defect
management, configuration management (ITIL), continuous build, version
control, source code analysis and forums through a single and secure
environment.
codeBeamer makes software development more agile, transparent and
productive.
© 2011 Intland Software 7
codeBeamer
© 2011 Intland Software 8
Scrum Wizard
© 2011 Intland Software 9
Product Backlog
• The product backlog is a high-level feature list that is maintained throughout the entire project. It aggregates descriptions of
all potential features, prioritized as an absolute ordering by business value. In other words, it is “What” that will be built,
sorted by importance. It is open and editable by anyone and contains rough estimates of both business value and
development effort.
© 2011 Intland Software 10
Sprint Plan
• The sprint backlog is the list of work the team must address during the next sprint. Features are broken down into tasks. With this level of
detail the whole team understands exactly what to do.
© 2011 Intland Software 11
Kanban Board
• Kanban, in Japanese means, loosely translated, 'card board'. In an agile system, Kanban is a method which uses virtual cards
to represent issues to be resolved. A new feature is "pulled" into the product only when the work represented by an "in
progress" card is completed.
© 2011 Intland Software 12
Burndown Chart
• A burn down chart is a graphical representation of work left to do versus time. The outstanding work is on the vertical axis,
with time along the horizontal. That is, it is a run chart of outstanding work. It is useful for predicting when all of the work will
be completed.
© 2011 Intland Software 13
Velocity Chart
• A velocity chart shows the sum of estimates of the work delivered across all iterations. Typically velocity will stabilize through
the life of a project unless the project team make-up varies widely or the length of the iteration changes. As such, velocity can
be used for future planning purposes.
© 2011 Intland Software 14
LIVE DEMO
LIVE DEMO
© 2011 Intland Software 15
Thank you for your attention
For further information please visit our homepage:
www.intland.com
www.javaforge.com
HgEclipse: http://www.javaforge.com/project/HGE
codeBeamer Eclipse Studio: http://www.javaforge.com/project/CBES
© 2011 Intland Software 16
top related