accelerated lifetime test - phase 3gan/talk/5050_2-7-15.pdf2015/02/07  · accelerated lifetime test...

Post on 22-Jun-2020

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Accelerated Lifetime Test - Phase 3 •  November 2014 started four D opto-boards in 50º C / 50 % RH

–  Boards fabricated throughout production (4041, 4209, 4151, 4311) –  Have accumulated 4125 hours running time

•  Run PIN arrays at 5 V bias•  Run VCSELs at 40 MHz (50% duty cycle), 10mA pk-pk

Accelerated Lifetime Test - Phase 3 •  Optical power during 4125 hours in 50º C / 50 % RH

4041 4209

Accelerated Lifetime Test - Phase 3 •  Optical power during 2897 hours in 50º C / 50 % RH

4151 4311

top related