2021 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
Recommended by theTransportation Advisory Committee
February 23, 2021
Recommended for Board of Supervisors Approval
May 26, 2021
2020-2021 THROUGH 2024-2025
Judd Road and Tourmaline Drive Project Before and After
DRAFT
2021 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2020-2021 THROUGH 2024-2025
The Pinal County Board of Supervisors (Board) proudly presents the 2021 Five-Year Transportation Improvement and Maintenance Program (TIMP) for Budget Years 2020-2021 through 2024-2025. The TIMP is Pinal County’s near-term transportation plan that identifies potential funding and establishes a tentative schedule for planning, construction, and maintenance projects. It is fiscally constrained and updated annually with new projects added to the fifth year.
The Transportation Advisory Committee (TAC) is the Board appointed, ten member panel representing each of Pinal County’s five supervisor districts. The TAC is charged with prioritizing transportation projects for the TIMP and recommending the draft TIMP to the Board. On February 23, 2021, the TAC met in an open public meeting and recommended approval of the 2021 TIMP for Budget Years 2020-2021 through 2024-2025.
In recognition of their significant contributions, we would like to thank the TAC officers and members for their service to Pinal County.
First Row (L-R): Ron Vogler, District 4; Chair Maxine Brown, District 5; David Garcia, District 1 Second Row (L-R): Kevin Louis, District 3; Vice-Chair, Ted Hawkins, District 4; Rusty Riggs, District 3
Not Pictured: Anna Flores, District 1; Jim Fabris, District 2; Jess Daniels, District 2; and Charles Beal, District 5
DRAFT
2021 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2020-2021 THROUGH 2024-2025
The TAC conducts three public meetings during the months of September, November, and February in Florence and considers public comments in developing recommendations to the Board. We encourage you to attend the meetings and offer comments on the TIMP and future transportation projects.
Meetings are held on Tuesdays at the Pinal County Administrative Complex and begin at 2:30 p.m. as follows:
Agendas and minutes are posted in compliance with Arizona’s Open Meeting Law and can be found on Pinal County’s website: http://www.pinalcountyaz.gov/PublicWorks/TransportationPlanning/Pages/TACSchedule.aspx.
Funding for the TIMP is provided by revenues from the Pinal County Transportation Excise Tax, the half-cent sales tax, approved by voters in 2005. The sole purpose of the tax is to fund construction, maintenance, and roadside development projects throughout the county. Shopping and buying your gasoline locally ensure that quality transportation projects are planned and implemented countywide. With your support, we can continue building and improving the county’s transportation system.
Pinal County Board of Supervisors
September 21, 2021 November 23, 2021 February 22, 2022
Kevin Cavanaugh, District 1; Vice-Chairman Mike Goodman, District 2; Chairman Stephen Miller, District 3; Jeffery McClure, District 4; Jeff Serdy, District 5
DRAFT
2021 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2020-2021 THROUGH 2024-2025
RESOLUTION NO.___________________________________
WHEREAS, Pinal County is empowered by Arizona Revised Statutes § 11-251 and § 28-6701, et seq. to layout, maintain, control, and manage public roads within the County; and,
WHEREAS, on April 21, 2010, the Pinal County Board of Supervisors (Board) approved bylaws for the Transportation Advisory Committee (TAC), a recommending body to the Board on countywide transportation planning, construction, and maintenance projects; and,
WHEREAS, pursuant to Article II of the bylaws, the TAC shall annually review, update, and recommend a five-year transportation improvement and maintenance program to the Board; and,
WHEREAS, it is the recommendation of the TAC that the 2021 Pinal County Five-Year Transportation Improvement and Maintenance Program for Budget Years 2020-2021 through 2024-2025 be approved.
NOW THEREFORE, IT IS HEREBY RESOLVED that the Pinal County Board of Supervisors approves the 2021 Five-Year Transportation Improvement and Maintenance Program for Budget Years 2020-2021 through 2024-2025 and authorizes Public Works staff to proceed with pre-construction, construction, and/or maintenance activities including expenditures for the programmed transportation projects.
IT IS FURTHER RESOLVED that this Resolution is effective upon approval and execution of this Resolution.
PASSED AND ADOPTED this 26th day of May, 2021, by the PINAL COUNTY BOARD OF SUPERVISORS.
_________________________________________
Chairman of the Board
ATTEST:
____________________________________
Clerk of the Board
DRAFT
2021 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2020-2021 THROUGH 2024-2025
GLOSSARY
Activity – Project work such as: pre-construction/construction/new construction/reconstruction, drainage, dust palliative, pavement preservation or safety.
Construction – The building of roadway and/or related infrastructure improvements.
Drainage – The management of storm water to protect private and/or public infrastructure.
Dust Palliative – A surface treatment applied to unimproved roadways to control dust.
New Construction – The establishment of a roadway and/or related infrastructure improvements.
Pavement Preservation – A topical treatment that extends the service life of existing pavement surfaces.
Pre-Construction – The project work conducted prior to construction of roadway and/or related infrastructure improvements such as: planning, environmental, design, and right-of-way acquisition.
Reconstruction – The rebuilding of roadway and/or related infrastructure improvements. Elements of new construction may be incorporated into the project.
Safety – The project work that eliminates or reduces the severity of roadway hazards. Examples include intersection realignment, guardrails, improved signage and/or pavement markings, traffic signals or related studies.
Status – The current state of the project such as: cancelled, closed, completed, pending, programmed, and underway
Canceled – The project was terminated due to financial or other constraints such as unresolved right-of-way issues or changing priority.
Closed – The project was combined with another project (including allocated funding) to streamline activities or allocated funding for project was not used.
DRAFT
2021 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2020-2021 THROUGH 2024-2025
GLOSSARY (continued)
Completed – The project was successfully finished/constructed and closed out.
Pending – The project is about to start or awaiting the completion of another activity.
Programmed – The project was approved/authorized and scheduled for a future budget year.
Underway – The project is in progress.
Unfunded – Funding has not been identified/allocated.
DRAFT
Budget Year 2020-2021Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge Reconstruction $50,000 11CompleteDistrict 1 Manager a
Cordones Road Catalina Hills Rd-Biosphere Rd Pre-Construction $0 14CanceledDistrict 4 Manager b
Hunt Highway (Old) Pioneer Path-Wildhorse Dr Construction $125,000 22UnderwayDistrict 2 Manager a
Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 22CompleteDistrict 2 Manager b
Kenworthy Road Germann Rd-Pima Rd Reconstruction $550,000 32UnderwayDistrict 2 Manager a
Magma Road Hunt Hwy-Gary Rd (Edwards Rd) Construction $3,500,000 32UnderwayDistrict 2 Manager b
McKellips Road East of Colt Rd Intersection Drainage $200,000 45CompleteDistrict 5 Manager a
Mountain View Road Broadway Ave Intersection Construction $250,000 45UnderwayDistrict 5 Manager b
Ocotillo Road Meridian Rd-Ironwood Dr Construction $0 52CanceledDistrict 2 Manager a
Red Rock Access Road Red Rock to Pinal Airpark Rd Pre-Construction $250,000 54PendingDistrict 4 Manager b
Safety Program Countywide Safety $500,000 67ProgrammedDistrict Manager a
$6,675,000SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Bowlin Road Hidden Valley Rd-Stonebluff Rd Dust Palliative $100,000 64CompleteDistrict 4 Manager b
Copper Mine Road Main St-Prospector Ln Reconstruction $150,000 72UnderwayDistrict 2 Manager a
Logan Boulevard Diffin Rd-Reed Rd Dust Palliative $0 71ClosedDistrict 1 Manager b
Louis Johnson Drive Amarillo Valley Rd-State Route 347 Dust Palliative $250,000 84UnderwayDistrict 4 Manager a
McNab Parkway Veterans Memorial Blvd-W 1st Ave Construction $260,000 81UnderwayDistrict 1 Manager b
Midway Road Beggs Rd-Marsh Rd Dust Palliative $230,000 97CompleteDistrict 3/4 Manager a
Pavement Preservation Countywide Pavement Preservation $3,010,000 97UnderwayDistrict Manager b
Rhea Road Brennar Pass Rd-Donnaloy Rd Dust Palliative $30,000 102CompleteDistrict 2 Manager a
River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 101PendingDistrict 1 Manager b
Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St Dust Palliative $30,000 111CompleteDistrict 1 Manager a
Sasco Road/Aguirre Lane Red Rock Rd-Pioneer Way Reconstruction $300,000 114UnderwayDistrict 4 Manager b
Stonebluff Road Farrell Rd-Bowlin Rd Dust Palliative $100,000 124CompleteDistrict 4 Manager a
Tweedy Road Storey Rd-Randolph Rd Dust Palliative $250,000 123CompleteDistrict 3 Manager b
$4,910,000SUBTOTAL MAINTENANCE
$11,585,000GRAND TOTAL 2020-2021
District 7 = Multiple districts or countywide
DRAFT
Budget Year 2021-2022Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Florence-Kelvin Highway Donnelly Wash-Zellweger Rd Construction $1,550,000 131ProgrammedDistrict 1 Manager a
Gantzel Road Queen Creek (Wash) Pre-Construction $2,000,000 137UnderwayDistrict 2/5 Manager b
Heather Drive Kashmir Rd-Lamb Rd Construction $125,000 144CompleteDistrict 4 Manager a
Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 142CompleteDistrict 2 Manager b
Kenworthy Road Combs Rd-Chandler Heights Rd Construction $1,500,000 157UnderwayDistrict 2/5 Manager a
Magma Road Hunt Hwy-Gary Rd (Edwards Rd) Construction $2,500,000 152UnderwayDistrict 2 Manager b
Peart Road Interstate 8-Early Rd Reconstruction $2,520,000 163ProgrammedDistrict 3 Manager a
Pinal Airpark Road Interstate 10-Trico Rd Construction $650,000 164ProgrammedDistrict 4 Manager b
Safety Program Countywide Safety $500,000 177ProgrammedDistrict Manager a
Trekell Road S. Hanna Rd-Interstate 8 Reconstruction $540,000 173ProgrammedDistrict 3 Manager b
$13,135,000SUBTOTAL IMPROVEMENT
MaintenanceProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
American Avenue Calle Futura-East 0.5 miles Drainage $300,000 181UnderwayDistrict 1 Manager a
Copper Mine Road Main St-Prospectors Ln Reconstruciton $150,000 182UnderwayDistrict 2 Manager b
El Camino Viejo Road Camino Viejo W-Entrada del Oro Blvd Dust Palliative $940,000 195ProgrammedDistrict 5 Manager a
Encantado Lane Cactus Forest Rd-840' North Dust Palliative $100,000 191ProgrammedDistrict 1 Manager b
McNab Parkway Veterans Memorial Blvd-W 1st Ave Construction $150,000 201UnderwayDistrict 1 Manager a
Mount Lemmon Road Rio Del Oro Rd - .14 East of Camp Ground Dust Palliative $800,000 201UnderwayDistrict 1 Manager b
Orville Drive Diffin Rd-Quail Run Rd Dust Palliative $130,000 211ProgrammedDistrict 1 Manager a
Pavement Preservation Countywide Pavement Preservation $7,000,000 217PendingDistrict Manager b
River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 221ProgrammedDistrict 1 Manager a
Sasco Road/Aguirre Lane Red Rock Rd-Pioneer Way Reconstruction $200,000 224UnderwayDistrict 4 Manager b
Thunderbird Road Teel Rd-Mayer Rd Reconstruction $450,000 234ProgrammedDistrict 4 Manager a
$10,420,000SUBTOTAL Maintenance
$23,555,000GRAND TOTAL 2021-2022
District 7 = Multiple districts or countywide
DRAFT
Budget Year 2022-2023Transportation Improvement and Maintenance ProgramImprovement
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Judd Road - Tourmaline Drive Gantzel Rd - Copper Basin Development Construction $1,250,000 232CompleteDistrict 2 Manager b
Quail Run Road Dirt Rd - Orville Rd Culvert/ARDP $75,000 241ProgrammedDistrict 1 Manager a
Ralston Road at Vekol Wash Crossing Contruction $1,500,000 244ProgrammedDistrict 4 Manager b
Safety Program Countywide Safety $500,000 257ProgrammedDistrict Manager a
Skyline Drive Charbray Dr - Gantzel Rd New Construction $2,000,000 252ProgrammedDistrict 2 Manager b
$5,325,000SUBTOTAL Improvement
MaintenanceProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Fresno Road Warren Rd - Ralston Rd Dust Palliative $150,000 264ProgrammedDistrict 4 Manager a
MaryLynne Lane Missile Base Rd - North .75 mi Dust Palliative $150,000 264CompleteDistrict 4 Manager b
Ottawa Road Ottawa Rd - Bobcat Rd - Watson Wy Dust Palliative $150,000 273ProgrammedDistrict 3 Manager a
Park Link Drive 1 mile East of Pecan Dust Palliative $1,000,000 271ProgrammedDistrict 1 Manager b
River Road Redington Rd - Copper Creek Rd Dust Palliative $200,000 281ProgrammedDistrict 1 Manager a
Royce Road Ivar Rd - Hooper Trl Dust Palliative $50,000 282ProgrammedDistrict 2 Manager b
Selma Hwy Pinal County Portions (1.0 mi) Pavement Preservation $425,000 297ProgrammedDistricts 1/3 Manager a
$2,125,000SUBTOTAL Maintenance
$7,450,000GRAND TOTAL 2022-2023
District 7 = Multiple districts or countywide
DRAFT
Budget Year 2023-2024Transportation Improvement and Maintenance ProgramImprovement
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
16th Avenue Val Vista Rd - Marlow Rd, Wash Crossing Construciton $70,000 295ProgrammedDistrict 5 Manager b
Dirt Road Quail Run Rd - Domenion Rd Construction $105,000 301ProgrammedDistrict 1 Manager a
Felix Road Skyline Dr - Wash N. of Roberts Rd Construciton $250,000 305ProgrammedDistrict 5 Manager b
Judd Road - Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 312CompleteDistrict 2 Manager a
Logan Boulevard Deadman's Gulch - Diffin Rd Construction $215,000 311UnderwayDistrict 1 Manager b
Loveland Lane Kenworthy Rd - Dustin Ave Construction $75,000 322ProgrammedDistrict 2 Manager a
Martin Road Bel Air Rd - Cordoniz Ln Construction $80,000 323ProgrammedDistrict 3 Manager b
Mitchell Trail Arizona Farms Rd - Heritage Rd Construciton $125,000 332ProgrammedDistrict 2 Manager a
Picacho Boulevard Train Track Corssing - Phillips Rd Safety Improvement $250,000 331ProgrammedDistrict 1 Manager b
Queen Valley Drive Unpaved portion up to Silver King Rd Dust Palliative $45,000 345ProgrammedDistrict 5 Manager a
Safety Program County Wide Safety $500,000 347ProgrammedDistrict Manager b
$2,965,000SUBTOTAL Improvement
MaintenanceProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Arizona Farms Road State Route 79 - Herseth Rd Pavement Preservation $800,000 357ProgrammedDistrict 1/2 Manager a
Arizona Farms Road Hunt Hwy - Copper Basin Railroad Pavement Preservation $700,000 352ProgrammedDistrict 2 Manager b
Hunt Highway Gila River Indian Community - Town of Florence Pavement Preservation $1,250,000 362ProgrammedDistrict 2 Manager a
Meadowgreen Road and Hidden Valley Hidden Vlly Rd-Warren Rd;Meadowgreen Rd-Barnes Paving $240,000 364ProgrammedDistrict 4 Manager b
Park Link Drive Cattle Tank Rd West to new pavement Pavement Preservation $2,250,000 371ProgrammedDistrict 1 Manager a
River Road Reddington Rd-Copper Creek Rd Dust Palliative $200,000 371ProgrammedDistrict 1 Manager b
$5,440,000SUBTOTAL Maintenance
$8,405,000GRAND TOTAL 2023-2024
District 7 = Multiple districts or countywide
DRAFT
Budget Year 2024-2025Transportation Improvement and Maintenance ProgramImprovement
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Palo Verde Trail Alsdorf Rd - Cul De Sac ARDP $60,000 383New ProjectDistrict 3 Manager a
Safety Program County Wide Safety $500,000 387New ProjectDistrict Manager b
Schnepf Road Ocotillo Rd - Germann Rd Reconstruction $1,620,000 392New ProjectDistrict 2 Mangaer a
Superstition Boulevard East of Arroya Rd Drainage $150,000 395New ProjectDistrict 5 Manager b
Thunder Mountain Road Vah Ki Inn Rd - South to Irrigation Ditch New Construction $120,000 401New ProjectDistrict 1 Manager a
$2,450,000SUBTOTAL Improvement
MaintenanceProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Cardinal Road Warren Rd - Hidden Valley Rd ARDP $420,000 404New ProjectDistrict 4 Manager b
Cholla Road Palo Verde Rd - Simple Way Dust Palliative $120,000 411New ProjectDistrict 1 Manager a
Clemans Road Highway 287 - Vah Ki Inn Rd Dust Palliative $300,000 411New ProjectDistrict 1 Manager b
Hickory Road Century Rd - Pampas Grass Rd Paving $240,000 424New ProjectDistrict 4 Manager a
Houser Road Chuichu Hwy - Thornton Rd Paving $300,000 427New ProjectDistrict 3/4 Manager b
Roadway Maintenance County Wide Roadway Maintenance $5,889,888 437New ProjectDistrict Manager a
Sage Road LaBarranca Rd - McDavid Rd New Construction $200,112 434New ProjectDistrict 4 Manager b
Yaqui Lane Lazy K - End of Yaqui Dust Palliative $180,000 445New ProjectDistrict 5 Manager a
$7,650,000SUBTOTAL Maintenance
$10,100,000GRAND TOTAL 2024-2025
District 7 = Multiple districts or countywide
DRAFT
Length in Miles
Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge
Reconstruction
$50,000
$0
$50,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Resize culvert to driveway and reconstruct roadway for proper drainage. Completed in 2019
Status: From Programmed to Complete
Status Complete
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 134
0.2
1a
Length in Miles
Cordones Road Catalina Hills Rd-Biosphere Rd
Pre-Construction
$0
$0
$0
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager District 4 Manager E-mail publiworksdepartment@pinal.gov
Comments Activity: Design Concept Report for new roadway
County Cost: From $250,000 to $0.00
Status: From Programmed to Canceled. Project is now funded by the Pinal Regional Transportation Authority
Status Canceled
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 156
3.5
1b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Hunt Highway (Old) Pioneer Path-Wildhorse Dr
Construction
$125,000
$0
$125,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Low-water concrete dip crossing
Status: From Programmed to Underway, project to begin April 2021
Status Underway
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2201
0
2a
Length in Miles
Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development
Construction
$1,250,000
$0
$1,250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager District 2 Manager E-mail publicworksdeparment@pinal.gov
Comments Activity: Construction of new road on Judd Road alignment
County Cost: $1,250,000 will be programmed annually for 4 years (Year 1)
Status: Construction was completed with the Hunt Highway project the Summer of 2019
Status Complete
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 176
1.5
2b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Kenworthy Road Germann Rd-Pima Rd
Reconstruction
$550,000
$0
$550,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Rehabilitation of existing asphalt
Status: From Programmed to Underway, construction to begin March 2021
Status Underway
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2203
1
3a
Length in Miles
Magma Road Hunt Hwy-Gary Rd (Edwards Rd)
Construction
$3,500,000
$0
$3,500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Continuation of improvements on alignment
Status: Bid Opening February 2021, construction to begin Spring 2021, estimated completion by the end of 2021
County Cost: $3,500,000.00 with an additional $2,500,000.00 added in BY 2021-2022 for a project toal of $6,000,000.00
Status Underway
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2190
1.5
3b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
McKellips Road East of Colt Rd Intersection
Drainage
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager District 5 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Remove existing asphalt pavement and storm drain culverts, regrade road to include lower elevation profile, install new concrete cutoff walls and pavement section to enable runoff to sheet flow across reconstruction roadway
Status: From Underway to Complete; From Programmed to Underway, Construction begain November 2020; From New Project to Programmed, moved to BY 2020-2021
Status Complete
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2204
4a
Length in Miles
Mountain View Road Broadway Ave Intersection
Construction
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager District 5 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Intersection reconstruction and culvert installation
Status: From Pending to Underway; From Programmed to Pending, construction of low-water crossing will begin Spring 2021
Status Underway
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
4b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Ocotillo Road Meridian Rd-Ironwood Dr
Construction
$0
$0
$0
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Roadway widening
Status: This portion of Ocotillo Rd has been annexed by Queen Creek, project has been closed and will be constructed by Queen Creek
Status Canceled
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 177
1
5a
Length in Miles
Red Rock Access Road Red Rock to Pinal Airpark Rd
Pre-Construction
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Pre-Construction funding is necessary to evaluate a secondary access to Pinal Airpark; study will be done in conjunction with other traffic analysis surrounding the Airpark property
Status: From Programmed to Pending, will likely roll into next BY
Status Pending
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 4239
3
5b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Safety Program Countywide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager District Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Direct funding to the Roadway Safety Program
County Cost: Add $500,000 to Budget Year 2020-2021 to rebalance Safety Program funding
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
6a
Length in Miles
Bowlin Road Hidden Valley Rd-Stonebluff Rd
Dust Palliative
$100,000
$0
$100,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From Programmed to Complete
Status Complete
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 4240
0.6
6b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Copper Mine Road Main St-Prospector Ln
Reconstruction
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Asphalt repairs, saw cut and replace
Cost: $150,000 programmed annually for 2 years (Year 1)
Status Underway
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2207
7a
Length in Miles
Logan Boulevard Diffin Rd-Reed Rd
Dust Palliative
$0
$0
$0
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust palliative is contingent on receiving right-of-way donations
Status: From Programmed to Closed, project has been combined with the Logan Boulevard project in BY 2023-2024, request for ROW donations in progress; From New Project to Programmed
Limit Change: Diffin Rd to Deadman's Gulch Rd, due to lack of right-of-way from Deadman's Gulch Rd to Reed Rd
County Cost: $125,000.00 re-allocated to Logan Boulevard project in BY 2023-2024 for a total of $215,000.00
Status Closed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
7b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Louis Johnson Drive Amarillo Valley Rd-State Route 347
Dust Palliative
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From Programmed to Underway, chip seal planned Spring 2021
Status Underway
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 4241
2
8a
Length in Miles
McNab Parkway Veterans Memorial Blvd-W 1st Ave
Construction
$260,000
$0
$260,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Median Improvements on McNab Parkway
Cost: Programmed annually for 2 years, Year 1 $260,000, Year 2 $150,000
Status Underway
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1244
8b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Midway Road Beggs Rd-Marsh Rd
Dust Palliative
$230,000
$0
$230,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 7Project Manager District 3/4 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From Programmed to Complete, completed August 2020
Status Complete
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 3208
2
9a
Length in Miles
Pavement Preservation Countywide
Pavement Preservation
$3,010,000
$0
$3,010,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 7Project Manager District Manager E-mail publicworksdepartment@pinal.gov
Comments
Status Underway
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6007
9b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Rhea Road Brennar Pass Rd-Donnaloy Rd
Dust Palliative
$30,000
$0
$30,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: Dust palliative may be completed in conjunction with the Donnaloy Road project that is programmed in Budget Year 2019-2020; Completed Summer 2019
Status Complete
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.3
10a
Length in Miles
River Road Redington Rd-Copper Creek Rd
Dust Palliative
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust palliative
Status: From Programmed to Pending, planned fro Summer/Fall 2021
Length: Dust palliative will extend to existing 5 miles of paved roadway
County Cost: $200,000 will be programmed annually for 4 years (Year 1)
Status Pending
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1239
8
10b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St
Dust Palliative
$30,000
$0
$30,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust Palliative
Status: From Pending to Complete, completed May 2020; From Programmed to Pending, scheduled for Summer 2020
Comments: Dust palliative is contigent on receiving right-of-way donations
Status Complete
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.25
11a
Length in Miles
Sasco Road/Aguirre Lane Red Rock Rd-Pioneer Way
Reconstruction
$300,000
$0
$300,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Asphalt repairs, saw cut and replace
Cost: Programmed annually for 2 years, Year 1 $300,000, Year 2 $200,000
Status Underway
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 4245
11b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Stonebluff Road Farrell Rd-Bowlin Rd
Dust Palliative
$100,000
$0
$100,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust Palliative
Status: From Programmed to Complete, completed October 2020
Status Complete
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
12a
Length in Miles
Tweedy Road Storey Rd-Randolph Rd
Dust Palliative
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 3Project Manager District 3 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust Palliative
Status: From Programmed to Complte, completed July 2020
Status Complete
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 3209
2
12b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Florence-Kelvin Highway Donnelly Wash-Zellweger Rd
Construction
$1,550,000
$0
$1,550,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Combined with 2019-2020 Florence-Kelvin Highway project; L-2 Standard - 6 inch Aggregate Base over Double Chip Seal
Limits: From Donnelly Wash to Zellweger Rd; From Apached Kid Rd-Zellweger Rd to Gardenshire Rd-Zellweger Rd
County Cost: Combined BY 2019-2020 $1,300,000.00 with 2021-2022 $250,000.00 for a total of $1,550,000.00
Status Programmed
Maintenance Area Riverside
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1230
13a
Length in Miles
Gantzel Road Queen Creek (Wash)
Pre-Construction
$2,000,000
$0
$2,000,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager District 2/5 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity:Box culvert extension and drainage work
Status: Underway; Moved from BY 2019-2020 to BY 2021-2022, construction to begin Summer 2021
Budget: Additional $1,500,000 added to original $5o,ooo
Status Underway
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2198
0.07
13b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Heather Drive Kashmir Rd-Lamb Rd
Construction
$125,000
$0
$125,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Roadway construction with Aggregate Base and Asphalt Concrete
Length: 900 Feet
Status: Completed 2019
Status Complete
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 249
900
14a
Length in Miles
Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development
Construction
$1,250,000
$0
$1,250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Construction of new road on Judd alignment
County Cost: $1,250,000 will be programmed annually for 4 years (Year 2)
Status: Construction was completed with the Hunt Highway project the Summer of 2019
Status Complete
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 176
1.5
14b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Kenworthy Road Combs Rd-Chandler Heights Rd
Construction
$1,500,000
$0
$1,500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager District 2/5 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Construction of an L-2 Standard roadway, this project is contingent on funding availability (project is partially funded at this time)
Status: From Programmed to Underway
Status Underway
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2206
1.15
15a
Length in Miles
Magma Road Hunt Hwy-Gary Rd (Edwards Rd)
Construction
$2,500,000
$0
$2,500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Continuation of improvements on alignment
Status: Underway, continuation of Magma project in BY 2020-2021
County Cost: Additional $2,500,000.00 to prviously allocated $3,500,000.00 in BY 2020-2021
Status Underway
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2190
1.5
15b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Peart Road Interstate 8-Early Rd
Reconstruction
$2,520,000
$0
$2,520,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 3Project Manager District 3 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Remove existing pavement and replace with L-2 Modified Standard
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 3211
2
16a
Length in Miles
Pinal Airpark Road Interstate 10-Trico Rd
Construction
$650,000
$0
$650,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Driveways, possible left turn acceleration/merge lane, and possible roadway mill and replace
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 251252
2
16b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Safety Program Countywide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager District Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Direct funding to the Roadway Safety Program
County Cost: Add $500,000 to Budget Year 2021-2022 to rebalance Safety Program funding
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
17a
Length in Miles
Trekell Road S. Hanna Rd-Interstate 8
Reconstruction
$540,000
$0
$540,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 3Project Manager District 3 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Remove existing pavement and replace with L-2 Modified Standard
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 3212
0.4
17b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
American Avenue Calle Futura-East 0.5 miles
Drainage
$300,000
$0
$300,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Drainage repairs to American Avenue
Status Underway
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1245
18a
Length in Miles
Copper Mine Road Main St-Prospectors Ln
Reconstruciton
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Asphalt repairs, saw cut and replace
Cost: $150,000 programmed annually for 2 years (Year 2)
Status Underway
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2207
18b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
El Camino Viejo Road Camino Viejo W-Entrada del Oro Blvd
Dust Palliative
$940,000
$0
$940,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager District 5 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: State Land right-of-way is needed to complete the dust palliative
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 212
2.4
19a
Length in Miles
Encantado Lane Cactus Forest Rd-840' North
Dust Palliative
$100,000
$0
$100,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust Palliative will include Indigo Road, the unpaved segment of Leisure Lane, and Page Road for a total of 1 mile
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1242
1
19b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
McNab Parkway Veterans Memorial Blvd-W 1st Ave
Construction
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Median Improvements on McNab Parkway
Cost: Programmed annually for 2 years, Year 1 $260,000, Year 2 $150,000
Status Underway
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1244
20a
Length in Miles
Mount Lemmon Road Rio Del Oro Rd - .14 East of Camp Ground
Dust Palliative
$800,000
$0
$800,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust Palliative
Status: From Programmed to Underway, design began January 2021, construction to begin Summer 2021
Budget Year: From 2022-2023 to 2021-2022
County Cost: From $750,000.00 to $800,000.00
Status Underway
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1241
20b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Orville Drive Diffin Rd-Quail Run Rd
Dust Palliative
$130,000
$0
$130,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status Programmed
Maintenance Area San Tan
Transporation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1243
1.13
21a
Length in Miles
Pavement Preservation Countywide
Pavement Preservation
$7,000,000
$0
$7,000,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 7Project Manager District Manager E-mail publicworksdepartment@pinal.gov
Comments
Status Pending
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6008
21b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
River Road Redington Rd-Copper Creek Rd
Dust Palliative
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: Dust palliative is contigent on receiving right-of-way donations
Length: Dust palliative will extend to existing 5 miles of paved roadway
County Cost: $200,000 will be programmed annually for 4 years (Year 2)
Status Programmed
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1239
8
22a
Length in Miles
Sasco Road/Aguirre Lane Red Rock Rd-Pioneer Way
Reconstruction
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Asphalt repairs, saw cut and replace
Cost: Programmed annually for 2 years, Year 1 $300,000, Year 2 $200,000
Status Underway
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 4245
22b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Thunderbird Road Teel Rd-Mayer Rd
Reconstruction
$450,000
$0
$450,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Roadway widening
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 216
1.5
23a
Length in Miles
Judd Road - Tourmaline Drive Gantzel Rd - Copper Basin Development
Construction
$1,250,000
$0
$1,250,000
Activity
County Cost
Non County Cost
Improvement
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Construction of new road on Judd alignment
County Cost: $1,250,000 will be programmed annually for 4 years (Year 3)
Status: Construction was completed with the Hunt Highway project the Summer of 2019
Status Complete
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
23b
Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Budget Year 2021-2022
DRAFT
Length in Miles
Quail Run Road Dirt Rd - Orville Rd
Culvert/ARDP
$75,000
$0
$75,000
Activity
County Cost
Non County Cost
Improvement
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Construct with Orville Road project in Budget Year 2021-2022
Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 283
24a
Length in Miles
Ralston Road at Vekol Wash Crossing
Contruction
$1,500,000
$0
$1,500,000
Activity
County Cost
Non County Cost
Improvement
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Design is currently underway
Status: From New Project to Programmed
Status Programmed
Maintenance Area Hidden Valley
Funding SourcePROJECT TYPE
Total Cost
Project Number 382
24b
Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Safety Program Countywide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
Improvement
District 7Project Manager District Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Direct fuunding to the Roadway Safety Program
County Cost: Add $500,000 to Budget Year 2022-2023 to rebalance Safety Program funding
Status Programmed
Maintenance Area Multiple
Transprtation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
25a
Length in Miles
Skyline Drive Charbray Dr - Gantzel Rd
New Construction
$2,000,000
$0
$2,000,000
Activity
County Cost
Non County Cost
Improvement
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 325
25b
Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Fresno Road Warren Rd - Ralston Rd
Dust Palliative
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
Maintenance
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 337
26a
Length in Miles
MaryLynne Lane Missile Base Rd - North .75 mi
Dust Palliative
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
Maintenance
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust Palliative to County right-of-way, approximately .75 miles
Status: From Pending to Complete, completed March 2020; From New Project to Pending, scheduled Summer 2020
Status Complete
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 295
26b
Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Ottawa Road Ottawa Rd - Bobcat Rd - Watson Wy
Dust Palliative
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
Maintenance
District 3Project Manager District 3 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 286
27a
Length in Miles
Park Link Drive 1 mile East of Pecan
Dust Palliative
$1,000,000
$0
$1,000,000
Activity
County Cost
Non County Cost
Maintenance
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area Arizona City
Funding SourcePROJECT TYPE
Total Cost
Project Number 319
27b
Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
River Road Redington Rd - Copper Creek Rd
Dust Palliative
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
Maintenance
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Dust palliative is contingent on receiving right-of-way donations
Length: Dust palliative will extend to existing 5 miles of paved roadway
County Cost: $200,000 will be programmed annually for 4 years (Year 3)
Status: From New Project to Programmed
Status Programmed
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1239
28a
Length in Miles
Royce Road Ivar Rd - Hooper Trl
Dust Palliative
$50,000
$0
$50,000
Activity
County Cost
Non County Cost
Maintenance
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 285
28b
Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Selma Hwy Pinal County Portions (1.0 mi)
Pavement Preservation
$425,000
$0
$425,000
Activity
County Cost
Non County Cost
Maintenance
District 7Project Manager Districts 1/3 Manager E-mail publicworksdepartment@pinal.gov
Comments Length: Overlay 1.0 mile of County maintained portion
Status: From New Project to Programmed
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 415
1
29a
Length in Miles
16th Avenue Val Vista Rd - Marlow Rd, Wash Crossing
Construciton
$70,000
$0
$70,000
Activity
County Cost
Non County Cost
Improvement
District 5Project Manager District 5 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
29b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Budget Year 2022-2023
DRAFT
Length in Miles
Dirt Road Quail Run Rd - Domenion Rd
Construction
$105,000
$0
$105,000
Activity
County Cost
Non County Cost
Improvement
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Contingent on Right-of-Way Donations
Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
30a
Length in Miles
Felix Road Skyline Dr - Wash N. of Roberts Rd
Construciton
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
Improvement
District 5Project Manager District 5 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Contingent on Right-of-Way donation
Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
30b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Judd Road - Tourmaline Drive Gantzel Rd-Copper Basin Development
Construction
$1,250,000
$0
$1,250,000
Activity
County Cost
Non County Cost
Improvement
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Construction of new road on Judd Road alignment
County Cost: $1,250,000 will be programmed annually for 4 years (Final Year)
Status: Construction was completed with the Hunt Highway project the Summer of 2019
Status Complete
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
31a
Length in Miles
Logan Boulevard Deadman's Gulch - Diffin Rd
Construction
$215,000
$0
$215,000
Activity
County Cost
Non County Cost
Improvement
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Contingent on Right-of-Way donations, only acquire where current road lies
Status: Form New Project to Underway, Logan Boulevard project from BY 2020-2021 has been closed and combined with this project
County Cost: From $90,000.00 to $215,000.00, $125,000 from BY 2020-2021 has been added to this project
Status Underway
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
31b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Loveland Lane Kenworthy Rd - Dustin Ave
Construction
$75,000
$0
$75,000
Activity
County Cost
Non County Cost
Improvement
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Contingent on Right-of-Way donations
Status: From New Project to Programmed
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
32a
Length in Miles
Martin Road Bel Air Rd - Cordoniz Ln
Construction
$80,000
$0
$80,000
Activity
County Cost
Non County Cost
Improvement
District 3Project Manager District 3 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
32b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Mitchell Trail Arizona Farms Rd - Heritage Rd
Construciton
$125,000
$0
$125,000
Activity
County Cost
Non County Cost
Improvement
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Contingent of Right-of-Way donation
Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 2186
33a
Length in Miles
Picacho Boulevard Train Track Corssing - Phillips Rd
Safety Improvement
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
Improvement
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Mill and re-use base
Status: From New Project to Programmed
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1.3
33b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Queen Valley Drive Unpaved portion up to Silver King Rd
Dust Palliative
$45,000
$0
$45,000
Activity
County Cost
Non County Cost
Improvement
District 5Project Manager District 5 Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Contingent on Right-of-Way donations
Status: From New Project to Programmed
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
34a
Length in Miles
Safety Program County Wide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
Improvement
District 7Project Manager District Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Direct fuunding to the Roadway Safety Program
Status: From New Project to Programmed
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
34b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Arizona Farms Road State Route 79 - Herseth Rd
Pavement Preservation
$800,000
$0
$800,000
Activity
County Cost
Non County Cost
Maintenance
District 7Project Manager District 1/2 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2.5
35a
Length in Miles
Arizona Farms Road Hunt Hwy - Copper Basin Railroad
Pavement Preservation
$700,000
$0
$700,000
Activity
County Cost
Non County Cost
Maintenance
District 2Project Manager District 2 Manager E-mail publicworksdepartmant@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2.25
35b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Hunt Highway Gila River Indian Community - Town of Florence
Pavement Preservation
$1,250,000
$0
$1,250,000
Activity
County Cost
Non County Cost
Maintenance
District 2Project Manager District 2 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2.75
36a
Length in Miles
Meadowgreen Road and Hidden Valley Rd Hidden Vlly Rd-Warren Rd;Meadowgreen Rd-Barnes R
Paving
$240,000
$0
$240,000
Activity
County Cost
Non County Cost
Maintenance
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Location: Meadowgreen Rd from Hidden Valley Rd - Warren Rd and Hidden Valley Rd from Meadowgreen Rd - Barnes Rd
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
36b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Park Link Drive Cattle Tank Rd West to new pavement
Pavement Preservation
$2,250,000
$0
$2,250,000
Activity
County Cost
Non County Cost
Maintenance
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
6.3
37a
Length in Miles
River Road Reddington Rd-Copper Creek Rd
Dust Palliative
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
Maintenance
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments Status: From New Project to Programmed; Dust palliative is contingent on receiving right-of-way donations
Length: Dust palliative will extend to existing 5 miles of paved roadway
County Cost: $200,00 will be programmed annually for 4 years (Final Year)
Status Programmed
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1239
37b
Budget Year 2023-2024 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Palo Verde Trail Alsdorf Rd - Cul De Sac
ARDP
$60,000
$0
$60,000
Activity
County Cost
Non County Cost
Improvement
District 3Project Manager District 3 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
38a
Length in Miles
Safety Program County Wide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
Improvement
District 7Project Manager District Manager E-mail publicworksdepartment@pinal.gov
Comments Activity: Direct funding to the Roadway Safety Program
County Cost: Add $500,000 to Budget Year 2024-2025 to rebalance the Safety Program funding
Status New Project
Maintenance Area Multiple
Tansportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
38b
Budget Year 2024-2025 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Schnepf Road Ocotillo Rd - Germann Rd
Reconstruction
$1,620,000
$0
$1,620,000
Activity
County Cost
Non County Cost
Improvement
District 2Project Manager District 2 Mangaer E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
39a
Length in Miles
Superstition Boulevard East of Arroya Rd
Drainage
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
Improvement
District 5Project Manager District 5 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
39b
Budget Year 2024-2025 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Thunder Mountain Road Vah Ki Inn Rd - South to Irrigation Ditch
New Construction
$120,000
$0
$120,000
Activity
County Cost
Non County Cost
Improvement
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
40a
Length in Miles
Cardinal Road Warren Rd - Hidden Valley Rd
ARDP
$420,000
$0
$420,000
Activity
County Cost
Non County Cost
Maintenance
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
40b
Budget Year 2024-2025 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Cholla Road Palo Verde Rd - Simple Way
Dust Palliative
$120,000
$0
$120,000
Activity
County Cost
Non County Cost
Maintenance
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
41a
Length in Miles
Clemans Road Highway 287 - Vah Ki Inn Rd
Dust Palliative
$300,000
$0
$300,000
Activity
County Cost
Non County Cost
Maintenance
District 1Project Manager District 1 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
41b
Budget Year 2024-2025 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Hickory Road Century Rd - Pampas Grass Rd
Paving
$240,000
$0
$240,000
Activity
County Cost
Non County Cost
Maintenance
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
42a
Length in Miles
Houser Road Chuichu Hwy - Thornton Rd
Paving
$300,000
$0
$300,000
Activity
County Cost
Non County Cost
Maintenance
District 7Project Manager District 3/4 Manager E-mail publicworksdepartment@pinal.goc
Comments
Status New Project
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
42b
Budget Year 2024-2025 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Roadway Maintenance County Wide
Roadway Maintenance
$5,889,888
$0
$5,889,888
Activity
County Cost
Non County Cost
Maintenance
District 7Project Manager District Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
43a
Length in Miles
Sage Road LaBarranca Rd - McDavid Rd
New Construction
$200,112
$0
$200,112
Activity
County Cost
Non County Cost
Maintenance
District 4Project Manager District 4 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
43b
Budget Year 2024-2025 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
Length in Miles
Yaqui Lane Lazy K - End of Yaqui
Dust Palliative
$180,000
$0
$180,000
Activity
County Cost
Non County Cost
Maintenance
District 5Project Manager District 5 Manager E-mail publicworksdepartment@pinal.gov
Comments
Status New Project
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
44a
Budget Year 2024-2025 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
DRAFT
top related