usd261.com · 1/26/2016 bid set. haysville, kansas. 3500 north rock road bldg. 500 wichita, ks...

Post on 16-Jul-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

faira
Typewritten Text
TRANSPORTATION CAMPUS HIGH SCHOOL HHS / TRI-CITY SCHOOL HAYSVILLE MIDDLE SCHOOL RUTH CLARK ELEMENTARY REX, NELSON, FREEMAN, OATVILLE, AND PRAIRE ELEMENTARY SCHOOLS HAYSVILLE WEST MIDDLE SCHOOL
faira
Text Box
APRIL 18, 2016
faira
Snapshot
faira
Snapshot
faira
Snapshot
fairb
Snapshot
fairb
Snapshot
fairb
Snapshot
fairb
Snapshot
fairb
Snapshot

7337

S.

MER

IDIA

N

HA

YS

VIL

LE

U

SD

261

TR

AN

SP

OR

TA

TIO

N F

AC

IL

IT

Y

sheet

the Architect.

project no.15183.00

DATEBIDDING

10/12/15

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

SA-1.1

faira
Text Box
Transportation • Building concrete slab completed • Metal Building frame to be erected the week of April 11th. • Project is on schedule to be completed by August 2016.

BUILDING ABUILDING B

BUILDING C

BUILDING D

BUILDING E

BUILDING F

BUILDING G

BUILDING H

BUILDING I

NEW

ADDITION

2006 ADDITION

NEW

ADDITION

sheet

project no.15184.00

DATE12/15/2015

90% CONSTRUCTION

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

SITE

210

0 W

. 5

5th

STR

EET

S.

HA

YS

VIL

LE

U

SD

261

CA

MP

US

H

IG

H S

CH

OO

L

HA

YSV

ILLE

, KA

NSA

S

DOCUMENTS

faira
Text Box
Campus High School • Site Utility work has begun. • City of Wichita requires easement and SS manhole. • Building construction to begin May 19th.

WES

T G

RAN

D A

VE

NE

W H

AY

SV

IL

LE

H

IG

H / T

RI-C

IT

Y S

CH

OO

L

sheet

the Architect.

project no.15182.00

DATE1/26/2016

BID SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-1.2

FAAP

FACP

FDC

faira
Text Box
Haysville High / Tri-City Day School • Site work began April 4th. • Retention pond enlargement is underway. • Building pad construction scheduled to begin shortly.

90

0 W

. GRA

ND

AV

ENU

E

HA

YS

VIL

LE

M

ID

DL

E S

CH

OO

L - A

DD

IT

IO

N &

R

EN

OV

AT

IO

N

sheet

the Architect.

project no.15215.00

DATE02/02/2016

DESIGN DEVELOPMENT SET

HA

YSV

ILLE

, KS

670

60

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

faira
Text Box
Haysville Middle School • Plans have been issued for pricing. • Sub-contractor pricing is due May 10th. • Plans have been submitted toCity of Haysville for review.

190

0 W

. 55

TH. S

TREE

T

RU

TH

C

LA

RK

E

LE

ME

NT

AR

Y S

CH

OO

L - A

DD

IT

IO

NS

&

R

EN

OV

AT

IO

NS

sheet

the Architect.

project no.15217.00

DATEXX/XX/2015

SCHEMATIC DESIGN SET

WIC

HIT

A, K

S 6

7217

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Ruth Clark Elementary • Construction document phase is in progress. • Plans are scheduled to be issued for pricing in early May.

A C

B

D

WES

T G

RAN

D A

VE

RE

X E

LE

ME

NT

AR

Y S

CH

OO

L R

EN

OV

AT

IO

N

sheet

the Architect.

project no.15216.01

DATE2/16/2016

PROGRESS SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Rex Elementary • The proposed GMP for 5 Elementary schools is to be presented for BOE approval. • Schedule for construction is summer 2016. • Asbestos removal will need to be coordinated with construction schedule.

B

A

D

C

WES

T G

RAN

D A

VE

NE

LS

ON

E

LE

ME

NT

AR

Y S

CH

OO

L R

EN

OV

AT

IO

N

sheet

the Architect.

project no.15216.02

DATE2/16/2016

PROGRESS SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Nelson Elementary • The proposed GMP for 5 Elementary schools is to be presented for BOE approval. • Schedule for construction is summer 2017. • Asbestos removal will need to be coordinated with construction schedule.

WES

T G

RAN

D A

VE

FR

EE

MA

N E

LE

ME

NT

AR

Y S

CH

OO

L R

EN

OV

AT

IO

N

sheet

the Architect.

project no.15216.03

DATE2/16/2016

PROGRESS SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Freeman Elementary • The proposed GMP for 5 Elementary schools is to be presented for BOE approval. • Schedule for construction is summer 2016. • Gym roof replacement & clerestory re-construction is included in the project.

4335

SO

UTH

HO

OV

ER

OA

TV

IL

LE

E

LE

ME

NT

AR

Y S

CH

OO

L R

EN

OV

AT

IO

N

sheet

the Architect.

project no.15216.04

DATE

WIC

HIT

A, K

AN

SAS

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

SA-1.1

3/08/2016

BID SET

4335

SO

UTH

HO

OV

ER

OA

TV

IL

LE

E

LE

ME

NT

AR

Y S

CH

OO

L R

EN

OV

AT

IO

N

sheet

the Architect.

project no.15216.04

DATE2/11/2016

PROGRESS SET

WIC

HIT

A, K

AN

SAS

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Oatville Elementary • The proposed GMP for 5 Elementary schools is to be presented for BOE approval. • Schedule for construction is summer 2016 & 2017. • Parking lot includes lighting & student drop-off area.

WES

T G

RAN

D A

VE

PR

AIR

IE

E

LE

ME

NT

AR

Y S

CH

OO

L R

EN

OV

AT

IO

N

sheet

the Architect.

project no.15216.05

DATE2/09/2016

PROGRESS SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Prairie Elementary • The proposed GMP for 5 Elementary schools is to be presented for BOE approval. • Schedule for construction is summer 2017.

"E

T

1

"

"A

T

S

"

"D

P

L

1

"

E

L

1

M

E

P

1

E

D

P

C

O

O

L

E

R

F

R

E

E

Z

E

R

fairb
Text Box
Haysville West Middle School • Schematic design is in progress. • Met with principal and staff to review design. • Plans have been updated to include input from principal & staff. • Schedule for drive and utility relocation is summer 2016. • Schedule for building renovations and addition work to begin is fall 2016.

sheet

the Architect.

project no.16105.00

DATEDESIGN DEVELOPMENT SET

04/05/16

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.3

WES

T G

RAN

D A

VE

HA

YS

VIL

LE

W

ES

T M

ID

DL

E S

CH

OO

L A

DD

IT

IO

N

HA

YSV

ILLE

, KA

NSA

S

top related