http://slidepdf.com/reader/full/10-02830-ful-landscape-masterplan-1079758 1/1

 BM35.5 7m

35.7m

34.1m

33.5m

23.2m

25.0m

B             M                2               3             .    3             0               m          

22.6m

El

  1             7               .    5               8             

 B M  2 4. 6 2

 m

r  a v  e l  l  i  n  g C  r  a n e 

r  m i  n a l  

r  i  t l  i  n e r  

StaSub

m

Depot

32.6m

TCB

LB

32.6m

B             M                3             1             .    6               0               m          

29.9m

32.9m

31.7m

27.4m

25.9m

28.25mBM

Posts

FB

H           o           p        e        L          a         n        e        

LTwr

LTwr

LTwr

LTwr

LTwr

LTwr

SL

SL

El SubSta

T  r  a v  e l  l  i  n  g  C  r  a n e 

E l  S u b  S t a s 

WB

Depot

Coachand LorryPark

6        3        

6        5        

13

1

26        7        

7       3       

7 6 3t o 5 2 1 4

30

6 3 75

25

 2 0

1 5

1                   

11

 21252 3

 41 3 9

61 5 9

 8

1 2

 7

1

Duddingston Crescent D udd i ng sto n  C r

esce n t

 D u dd in g s t o n

  C r e sc e n t

DuddingstonMainsCottages

4           

P  a v  i  l  io n 

2               2               

2               1               

2               4               2               

3               

2               5               

3             0               

3     5     

4             0               

1               5               

2               0               

2               5               

3             0               

1  7   

1  8   

1  6   

1  4  

1   0   

1   1   

1  2   

1  3  

1   

5   

1               

8               

1               4               

4               4               

5               2               

7               2               a           

7               2               

6               2               

5               2               

4             0               

7        

5               7               

3             1             

6               1             

El SubSta

6               2               

7               5                 t             o             7               8               

6               3             t           o          7               0               

1       

5               4               

 P O

Garage

Warehouse

GasGov

Surgery

11

1

 9

1             

 1

6

1             8             1             

7               

1               2               

1               1               

1               0               

6               

1                 3             7               

3     2     

7               6               

8             6               

9     6     

 4 a6

 8 6 a

7     7     

6               9             

6               1             

6               8               

 2

1 0

1 3

1 a

 3 a

 1 0 b 8  a 

     2

6        1        

42

5                         1                        

5       7       

97

3

1

1

Depot

5        9        

   1

   2

   3

   6

A1 Industria

   2  4   8

   2  4   6

   2  4  4

2 16 

2 14

El SubSta

 W a rd Bd y

 CR

W  a r  d  B  d   y  

C  R  

W a r d B d  y 

C R 

W                          a                  r                   d                          

B                        d                          

       y                  

C        P      

C        R      

 MA G DA L E

 N EA VE N U E

B            A           I            L            I            E             

P            L            A           C            

E             

 M IL TO N  R OA D

H                        O                       P                      E                       L                      A                       N                        E                       

BRAND DRI VE

S  T  A N  L E  Y  S T  R E  E  T  

P                 A               R               K                 

A               V                 E                 N                  U                  E                 

 PA R K

LA N E

  D  U  R  H

 A  M  P  L

 A  C  E

LA N E

D                U                  D                D                I                  N                  G                S                 T                 O               N                  

P                 A               R               K                 

D             U               R               H               A              M               

R               O             A              D             

D             U               D             D             I                N               G             S               T               O             N                P               A              R               K                

P                 A               R               K                 A               V                 E                 N                  U                  E                 

 M IL TO NROA D

H      O     P     E     

L      A     N     E      

CHRISTIAN GRO VE

C H R I S T  IAN C 

S C T  

S T AN L E Y S T R E E T 

CityofEdinburghCouncil

July2010

JOBNO1775

SCALE:1:1250 @ A0

3AFORRESTROADSTIRLINGFK81UHTEL01786446446 FAX01786446441E-MAILmail@iwastirling.co.uk

     N     O     R     T     H

Landscape Masterplan

IANWHITEASSOCIATESLANDSCAPE ARCHITECTS ANDPLANNERS

DRAWING NO: 1775/ 01

PORTOBELLOHIGH SCHOOL

FOR PLANNING

OUTLINESPECIFICATION

GRASS 

SEEDING:150mmdepth approved sitewon topsoil overclean, ripped

subsoil.Cultivateand seed with RT16 grassseed mix at 35g/m2,including

pre-seedfertiliser.3 cutsand weed-freeat completion.TURFING:minimum 150mmconsolidated depth clean,freedraining

approved sitewontopsoil amelioratedwith 25mmcoarse/medium sand

nominal 10mmdepth horticultural sand worked into topsoil surfaceandraked off to running levels

Rowlawn RBMedallion turf laid stretching lapall jointsclosebutted,

dressed with sand soil mix and brushed.slowreleasefertiliserapplied at

70gm/m2,3 cuts sward establishedand weed freeat completion.

GROUNDCOVER PLANTING

300mmdepth approved imported topsoil overclean,ripped

subsoil.Cultivate,adding compost,and plant with 3 litrepot grownplants at

9/m2. 50mm depth compostedbark mulch finish.

BEECHHEDGES

400mmdepth approved imported topsoil overclean,ripped

subsoil.Cultivate,adding compost,and plant with 80-100mm1+2 barerootfeatheredtransplantsat 10per linearmetre,in triplestaggeredrows at

300mmcentres.50mm depthcomposted bark mulch finish.1100mm high

metal post and wirefencing.

MIXEDHEDGES

400mmdepth approved imported topsoil overclean, ripped subsoil.

Cultivate,add compost,supplyand plant insinglespeciesblocksof min

12no.plants,planted in 2 offset rows(7/linearmetre):50%Crataegusmonogyna 60/80cmhigh, 1+2 transplant,thick collar,well

featheredto base.

20%Prunusspinosa 1+2 transplant,60/80cmthick collar,well featheredto

base.15%Ligustrumvulgare 1+2transplant 60/80cmhigh, threebreaks,well

featheredthick collar.

5% Corylusavellana 1 + 2 transplant 60/80cmwell featheredthick collar

5% Rosa avense1+2 transplant 60/80cmmin 3 breaks

5% Ilex aquifolium3L containergrown 40-60cmfeathered frombase.50mmdepth compostedbark mulchfinish. 1100mmhigh metal post and

wirefencing.

SPECIMENTREES

2000 x 2000 x 750mmpit filled with approved sitetopsoil,with

compost.Treepit drainageconnecting to local drainagetrench granularbackfill . 20/25cmSemimaturetrees ,NorwayMaple2.4mclears tem, ful l,

evenlybranching full crown,containergrown,from approved selected

supplier. Planted with aeration pipe,stakean d ties.1.0mdiameterx 50mm

depth compostedbark mulch finish.

EXISTING TREES

Treesto beretained areidentified on TreeConstraintsplan and to be

protectedto BS 5837 using 2.40mprotectivefencing mounted on scaffoldpoles.Referto TreeConstraints Plan.

SPORTS PITCHES

3G all weatherfootball pitchesto CEC approved standard andrequirements,with perimeterand pitch division fencing.Pitchfencing 3m

high and 5mhighat goal ends.Weldedmesh sportsfencegalvanised and

polyestercoated to RAL6005 (mossgreen).Multi mesh asa singleskin

panel to lower1.2mof fenceto be6mm vertical barsat 50mmcentresand8mmhorizontal barsat 68mmcenteswith additional 8mmbar onreverse

on everythird horizontal fixed to two squarehollow section horizontal

rails.Mesh above1.2m to be6mm barsat 50mmcentresvertically

sandwiched betweetwo 8mmbarsat 200mmcentres. 4.10mlong x 80x 40x 3mmrectangul arhspos tsat 2.5mcentres in900mmsquareconcrete

foundation GradeST4.2no 3mx 3mdoubleleaf vehicleaccess gate.2no

2mhigh x 1.2mwidesingleleaf personnel gate.Gatesto open outwards.10mhigh lighting columns- refer to Rybka layout.

EXISTING  WOODLANDP LANTINGExisting Milleniumwoodland retained wherepossible,protected during

construction works,to complywith BS 5837

SUPPLEMENTARYWOODLANDPLANTING

Pit plant between existing remainingwoodland planting and cultivateand

notch plant adacent to school boundaryfence.Sprial guards,necessaryadditivesand timberstakes. Allowfor25% of total area of millenium

planting retained forsupplement planting.Speciesmix: 25% Quercusrobur

/ 25% Fraxinusexcelsior/20% Acer campestre/ 10% corylusavellana / 10%

ilex aquifolium/10% prunusspinosa

ASPHALTFOOTWAY

3mwideHot rolled asphalt footpathwith limestonechippingsspread at1kg/m2.Sub-baseto Engineer'sspecification.50 x 200mmconcretebullnosededging with 50mmupstand to path.6mhigh lighting columnsatregularspacings- referto Rybka lighting drawings.Golf ball stop fencing to Eastboundaryfootwayat edge of golf course- to CEC approved standards.

RESINBOUNDGRAVEL

Park entrances,Pedestrian ramp,School Plaza & Carparking bays - resinbound gravel,Addaset 6mm'Wessex Pearl'silvergrey,16mmthick laid tomanufacturer'srecommendations.Subbase to Engineer'sspecification.Parking baysand disabled/motorcycleparking delineatedwith whitethermosplasticlining paint

BLOCKPAVINGKeyblok charcoal grey100 x 200mmpaving blocks,used asbuilding trim/pedestrian accessfootwayto west entrance/car park entrance'table'levelwith footwayand to plaza area ascontrast lineswithinthe resinboundgravel.Sub baseto Engineer'sspecification.

STEPS

Precast concretestep units- C30concrete wet cast unitswith acid washed

finish to uniformgreycolour with inlaid contrast non-slip grip strips,hazard

warning paving to topand bottomof stepsand galvanised steel handrails

MILTONROADCROSSING

ProposednewToucan pedestrian / cyclecrossing to Engineer'sdetail

CONCRETEWALLS

Featurewallsin precast concretesmooth polished finish,depictingschool

name,to main pedestrian entranceand Plaza north

BUS STOP RELCOATION

Busstop - relocated 15mwest fromcurrent location onMiltonroad,toEngineer'sdetail /CEC approved.

ROADWAY / PLAYGROUND

Carpark roadwayand rear School playground - densebitumen macadem-referto Circledesign landscapelayout fordetail of courtyardsandEngineer'sspecification.

SELF BINDGRAVEL PATH

Geotextileto formation layer. 150mmdepth type1 sub-basewith 1in30

camber fromcentre l ine .2mwide50mmdepth,Cedecgo ld, as suppl ied byCED orequal and approved.150 x32mm long sawn larch timberedge

boards.Topsoil vergesbrought to 15mm abovepath surfacelevel to

allowforsettlement. Reusestripped sitetopsoil to fill levels.Reinstated soil

vergesto beraked, stonepicked and seeded with RigbyTaylorMascot R16ryefree seed mix (orequal approved) at 35g/m2,3 cutsweed freeand fully

establishedat Completion.

REVISION

G

F

E

D

C

B

A

DATE

14.09.10

16.08.10

11.08.10

10.08.10

04.08.10

28.07.2010

29.07.10

CHECKED

SR

NB

SR

SR

SR

SR

SR

NOTES

Updated layout toco-ord withJMAandCircle

2mpathadded tonorthof golfcourse

Minor adjustments tolayout followingarchitects comments

Paths toWest and East perimeter ofparkadded along withnewentranceandpossiblecrossing points

Mainpedestrianentrancedevelopedfollowing discussionwithplanners

Landscapeco-ordinationwithCircle Design

Steps & ramp added topedestrianentrance,pitchrepositioned,featurewalland seatingadded,disabled bays repositioned towithin45mof building entrance,levels adjusted

Sketchviewof pedestrianentrancesteps andramp withfeaturewalls

Sketchviewof pedestrianentrancefrom MiltonRoad

  Artificial pitchandfencing,with beechhedge

R e si n b ou n d gra ve l t o P la za a nd ca r p a rk b ays B e ech h ed g e an d se mi m a tu re tre es to ca r p a rk

SectionthroughMiltonRoad,footway,car park,pitches andmillennium plantingtoGolfcourse

Precastconcretesteps,inlaidwith grip strip andsteel handrail

Hotrolledasphaltwith whitechippings

Resinboundgravel