10 02830 ful-landscape masterplan-1079758

2
Depot Depot Coachand LorryPark DuddingstonCrescent  D udd i  ng sto n  C resce n t  D u dd in g s t o n  C r e sc e n t Duddings tonMainsCottages A1 Industria S  T  A N  L E  Y    D  U  R  H A  M CityofEdinburghCouncil July2010 JOBNO1775 SCALE:1:1250 @ A0 3AFORRESTROADSTIRLINGFK81UHTEL01786446446FAX[email protected] Landscape Masterplan IANWHITEASSOCIATES LANDSCAPEARCHITECTSANDPLANNERS DRAWING NO: 1775/ 01 PORTOBELLOHIGH SCHOOL FOR PLANNING OUTLINESPECIFICATION GRASS  SEEDING:150mmdepth approved sitewon topsoil overclean, ripped subsoil.Cultivateand seed with RT16 grassseed mix at 35g/m2,including pre-seedfertiliser.3 cutsand weed-freeat completion. TURFING:minimum 150mmconsolidated depth clean,freedraining approved sitewontopsoil amelioratedwith 25mmcoarse/medium sand nominal 10mmdepth horticultural sand worked into topsoil surfaceand raked off to running levels Rowlawn RBMedallion turf laid stretching lapall jointsclosebutted, dressed with sand soil mix and brushed.slowreleasefertiliserapplied at 70gm/m2,3 cuts sward establishedand weed freeat completion. GROUNDCOVER PLANTING 300mmdepth approved imported topsoil overclean,ripped subsoil.Cultivate,adding compost,and plant with 3 l itrepot grownplants at 9/m2. 50mmdepth compostedbark mulch nish. BEECHHEDGES 400mmdepth approved imported topsoil overclean,ripped subsoil.Cultivate,adding compost,and plant with 80-100mm1+2 bareroot featheredtransplantsat 10per linearmetre,in triplestaggeredrows at 300mmcentres.50mm depthcomposted bark mulch nish.1100mm high metal post and wirefencing. MIXEDHEDGES 400mmdepth approved imported topsoil overclean, ripped subsoil. Cultivate,add compost,supplyand plant insinglespeciesblocksof min 12no.plants,planted in 2 offset rows(7/linearmetre): 50%Crataegusmonogyna 60/80cmhigh, 1+2 transplant,thick collar,well featheredto base. 20%Prunusspinosa 1+2 transplant,60/80cmthick collar,well featheredto base. 15%Ligustrumvulgare 1+2transplant 60/80cmhigh, threebreaks,well featheredthick collar. 5% Corylusavellana 1 + 2 transplant 60/80cmwell featheredthick collar 5% Rosa avense1+2 transplant 60/80cmmin 3 breaks 5% Ilex aquifolium3L containergrown 40-60cmfeathered frombase. 50mmdepth compostedbark mulchnish. 1100mmhigh metal post and wirefencing. SPECIMENTREES 2000 x 2000 x 750mmpit lled with approved sitetopsoil,with compost.Treepit drainageconnecting to local drainagetrench granular backl l.20/25cmSemimatu retrees,Nor wayMaple2.4mcle arstem,full , evenlybranching full crown,containergrown,from approved selected supplier. Planted with aeration pipe,stakean d ties.1.0mdiameterx 50mm depth compostedbark mulch nish. EXISTING TREES Treesto beretained areidentied on TreeConstraintsplan and to be protectedto BS 5837 using 2.40mprotectivefencing mounted on scaffold poles.Referto T reeConstraints Plan. SPORTS PITCHES 3Gall weatherfootball pitchesto CEC approved standard and requirements,with perimeterand pitch division fencing.Pitchfencing 3m high and 5mhighat goal ends.Weldedmesh sportsfencegalvanised and polyestercoated to RAL6005 (mossgreen).Multi mesh asa singleskin panel to lower1.2mof fenceto be6mm vertical barsat 50mmcentresand 8mmhorizontal barsat 68mmcenteswith additional 8mmbar onreverse on everythird horizontal xed to two squarehollow section horizontal rails.Mesh above1.2m to be6mm barsat 50mmcentresvertically sandwiched betw eetwo 8mmbarsat 200mmcentres. 4.10mlong x 80x 40 x 3mmrectang ularhspostsat 2.5mcentr esin900mmsquareconc rete foundation GradeST4.2no 3mx 3mdoubleleaf vehicleaccess gate.2no 2mhigh x 1.2mwidesingleleaf personnel gate.Gatesto open outwards. 10mhigh lighting columns- refer to Rybka layout. EXISTING  WOODLANDP LANTING Existing Milleniumwoodland retained whe repossible,protected during construction works,to complywith BS 5837 SUPPLEMENTARYWOODLANDPLANTING Pit plant between existing remainingwoodland planting and cultivateand notch plant adacent to school boundaryfence.Sprial guards,necessary additivesand timberstakes. Allowfor25% of total area of mille nium planting retained forsupplement planting.Speciesmix: 25% Quercusrobur / 25% Fraxinusexcelsior/20% Acer campestre/ 10% corylusavellana / 10% ilex aquifolium/10% prunusspinosa ASPHALTFOOTWAY 3mwideHot rolled asphalt footpathwith limestonechippingsspread at 1kg/m2.Sub-baseto Engineer'sspecication.50 x 200mmconcretebullnosed edging with 50mmupstand to path.6mhigh lighting columnsatregular spacings- referto Rybka lighting drawings.Golf ball stop fencing to East boundaryfootwayat edge of golf course- to CEC approv ed standards. RESINBOUNDGRAVEL Park entrances,Pedestrian ramp,School Plaza & Carparking bays - resin bound gravel,Addaset 6mm'Wessex Pearl'silvergrey,16mmthick laid to manufacturer'srecommendations.Subbase to Engineer'sspecication. Parking baysand disabled/motorcycleparking delineatedwith white thermosplasticlining paint BLOCKPAVING Keyblok charcoal gre y100 x 200mmpaving blocks,used asbuilding trim/ pedestrian accessfootwayto west entrance /car park entrance'table'level with footwayand to plaza area ascontrast lineswithinthe resinbound gravel.Sub baseto Engineer'sspecication. STEPS Precast concretestep units- C30concrete wet cast unitswith acid washed nish to uniformgreycolour with inlaid contrast non-slip grip strips,hazard warning paving to topand bottomof stepsand galvanised steel handrails MILTONROADCROSSING ProposednewToucan pedestrian / cyclecrossing to Engineer'sdetail CONCRETEWALLS Featurewallsin precast concretesmooth polished nish,depictingschool name,to main pedestrian entranceand Plaza north BUS STOP RELCOATION Busstop - relocated 15mwest fromcurrent location onMiltonroad,to Engineer'sdetail /CEC approved. ROADWAY / PLAYGROUND Carpark roadwayand rear School playground - densebitumen mac adem- referto Circledesign landscapelayout fordetail of courtyardsand Engineer'sspecication. SELF BINDGRAVEL PATH Geotextileto formation layer. 150mmdepth type1 sub-basewith 1in30 camberfro mcentreli ne.2mwide50mmdepth,Cede cgold,assuppli ed by CED orequal and approved.150 x32mm long sawn larch timberedge boards.Topsoil vergesbrought to 15mm abovepath surfacelevel to allowforsettlement. Reusestripped sitetopsoil to ll levels.Reinstated soil vergesto beraked, stonepicked and seeded with RigbyTaylorMascot R16 ryefree seed mix (orequal approved) at 35g/m2,3 cutsweed freeand fully establishedat Completion. REVISION G F E D C B A DATE 14.09.10 16.08.10 11.08.10 10.08.10 04.08.10 28.07.2010 29.07.10 CHECKED SR NB SR SR SR SR SR NOTES Updated layout toco-ord withJMAand Circle 2mpathadded tonorthof golfcourse Minor adjustments tolayout following architects comments Paths toWest and East perimeter ofpark added along withnewentranceand possiblecrossing points Mainpedestrianentrancedeveloped following discussionwithplanners Landscapeco-ordinationwithCircle Design Steps & ramp added topedestrianentrance, pitchrepositioned,featurewalland seating added,disabled bays repositioned towithin 45mof building entra nce,levels adjusted Sketchviewof pedestrianentrancesteps andramp withfeaturewalls Sketchviewof pedestrianentrancefrom M iltonRoad  Artificial pitchandfencing,with beechhedge Resinboundgravel toPl azaan dcar par k ba ys Bee chhedgeandsemimat uret rees t ocar par k SectionthroughMiltonRoad,footway,car park,pitches andmillennium plantingtoGolfcourse Precastconcretesteps,inlaidwith grip strip andsteel handrail Hotrolledasphaltwith whitechippings Resinboundgravel

Upload: phyllis-stephen

Post on 06-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 10 02830 Ful-landscape Masterplan-1079758

8/2/2019 10 02830 Ful-landscape Masterplan-1079758

http://slidepdf.com/reader/full/10-02830-ful-landscape-masterplan-1079758 1/1

 BM35.5 7m

35.7m

34.1m

33.5m

23.2m

25.0m

B             M                2               3             .    3             0               m          

22.6m

El

  1             7               .    5               8             

 B M  2 4. 6 2

 m

r  a v  e l  l  i  n  g C  r  a n e 

r  m i  n a l  

r  i  t l  i  n e r  

StaSub

m

Depot

32.6m

TCB

LB

32.6m

B             M                3             1             .    6               0               m          

29.9m

32.9m

31.7m

27.4m

25.9m

28.25mBM

Posts

FB

H           o           p        e        L          a         n        e        

LTwr

LTwr

LTwr

LTwr

LTwr

LTwr

SL

SL

El SubSta

T  r  a v  e l  l  i  n  g  C  r  a n e 

E l  S u b  S t a s 

WB

Depot

Coachand LorryPark

6        3        

6        5        

13

1

26        7        

7       3       

7 6 3t o 5 2 1 4

30

6 3 75

25

 2 0

1 5

1                   

11

 21252 3

 41 3 9

61 5 9

 8

1 2

 7

1

Duddingston Crescent D udd i ng sto n  C r

esce n t

 D u dd in g s t o n

  C r e sc e n t

DuddingstonMainsCottages

4           

P  a v  i  l  io n 

2               2               

2               1               

2               4               2               

3               

2               5               

3             0               

3     5     

4             0               

1               5               

2               0               

2               5               

3             0               

1  7   

1  8   

1  6   

1  4  

1   0   

1   1   

1  2   

1  3  

1   

5   

1               

8               

1               4               

4               4               

5               2               

7               2               a           

7               2               

6               2               

5               2               

4             0               

7        

5               7               

3             1             

6               1             

El SubSta

6               2               

7               5                 t             o             7               8               

6               3             t           o          7               0               

1       

5               4               

 P O

Garage

Warehouse

GasGov

Surgery

11

1

 9

1             

 1

6

1             8             1             

7               

1               2               

1               1               

1               0               

6               

1                 3             7               

3     2     

7               6               

8             6               

9     6     

 4 a6

 8 6 a

7     7     

6               9             

6               1             

6               8               

 2

1 0

1 3

1 a

 3 a

 1 0 b 8  a 

     2

6        1        

42

5                         1                        

5       7       

97

3

1

1

Depot

5        9        

   1

   2

   3

   6

A1 Industria

   2  4   8

   2  4   6

   2  4  4

2 16 

2 14

El SubSta

 W a rd Bd y

 CR

W  a r  d  B  d   y  

C  R  

W a r d B d  y 

C R 

W                          a                  r                   d                          

B                        d                          

       y                  

C        P      

C        R      

 MA G DA L E

 N EA VE N U E

B            A           I            L            I            E             

P            L            A           C            

E             

 M IL TO N  R OA D

H                        O                       P                      E                       L                      A                       N                        E                       

BRAND DRI VE

S  T  A N  L E  Y  S T  R E  E  T  

P                 A               R               K                 

A               V                 E                 N                  U                  E                 

 PA R K

LA N E

  D  U  R  H

 A  M  P  L

 A  C  E

LA N E

D                U                  D                D                I                  N                  G                S                 T                 O               N                  

P                 A               R               K                 

D             U               R               H               A              M               

R               O             A              D             

D             U               D             D             I                N               G             S               T               O             N                P               A              R               K                

P                 A               R               K                 A               V                 E                 N                  U                  E                 

 M IL TO NROA D

H      O     P     E     

L      A     N     E      

CHRISTIAN GRO VE

C H R I S T  IAN C 

S C T  

S T AN L E Y S T R E E T 

CityofEdinburghCouncil

July2010

JOBNO1775

SCALE:1:1250 @ A0

3AFORRESTROADSTIRLINGFK81UHTEL01786446446 [email protected]

     N     O     R     T     H

Landscape Masterplan

IANWHITEASSOCIATESLANDSCAPE ARCHITECTS ANDPLANNERS

DRAWING NO: 1775/ 01

PORTOBELLOHIGH SCHOOL

FOR PLANNING

OUTLINESPECIFICATION

GRASS 

SEEDING:150mmdepth approved sitewon topsoil overclean, ripped

subsoil.Cultivateand seed with RT16 grassseed mix at 35g/m2,including

pre-seedfertiliser.3 cutsand weed-freeat completion.TURFING:minimum 150mmconsolidated depth clean,freedraining

approved sitewontopsoil amelioratedwith 25mmcoarse/medium sand

nominal 10mmdepth horticultural sand worked into topsoil surfaceandraked off to running levels

Rowlawn RBMedallion turf laid stretching lapall jointsclosebutted,

dressed with sand soil mix and brushed.slowreleasefertiliserapplied at

70gm/m2,3 cuts sward establishedand weed freeat completion.

GROUNDCOVER PLANTING

300mmdepth approved imported topsoil overclean,ripped

subsoil.Cultivate,adding compost,and plant with 3 litrepot grownplants at

9/m2. 50mm depth compostedbark mulch finish.

BEECHHEDGES

400mmdepth approved imported topsoil overclean,ripped

subsoil.Cultivate,adding compost,and plant with 80-100mm1+2 barerootfeatheredtransplantsat 10per linearmetre,in triplestaggeredrows at

300mmcentres.50mm depthcomposted bark mulch finish.1100mm high

metal post and wirefencing.

MIXEDHEDGES

400mmdepth approved imported topsoil overclean, ripped subsoil.

Cultivate,add compost,supplyand plant insinglespeciesblocksof min

12no.plants,planted in 2 offset rows(7/linearmetre):50%Crataegusmonogyna 60/80cmhigh, 1+2 transplant,thick collar,well

featheredto base.

20%Prunusspinosa 1+2 transplant,60/80cmthick collar,well featheredto

base.15%Ligustrumvulgare 1+2transplant 60/80cmhigh, threebreaks,well

featheredthick collar.

5% Corylusavellana 1 + 2 transplant 60/80cmwell featheredthick collar

5% Rosa avense1+2 transplant 60/80cmmin 3 breaks

5% Ilex aquifolium3L containergrown 40-60cmfeathered frombase.50mmdepth compostedbark mulchfinish. 1100mmhigh metal post and

wirefencing.

SPECIMENTREES

2000 x 2000 x 750mmpit filled with approved sitetopsoil,with

compost.Treepit drainageconnecting to local drainagetrench granularbackfill . 20/25cmSemimaturetrees ,NorwayMaple2.4mclears tem, ful l,

evenlybranching full crown,containergrown,from approved selected

supplier. Planted with aeration pipe,stakean d ties.1.0mdiameterx 50mm

depth compostedbark mulch finish.

EXISTING TREES

Treesto beretained areidentified on TreeConstraintsplan and to be

protectedto BS 5837 using 2.40mprotectivefencing mounted on scaffoldpoles.Referto TreeConstraints Plan.

SPORTS PITCHES

3G all weatherfootball pitchesto CEC approved standard andrequirements,with perimeterand pitch division fencing.Pitchfencing 3m

high and 5mhighat goal ends.Weldedmesh sportsfencegalvanised and

polyestercoated to RAL6005 (mossgreen).Multi mesh asa singleskin

panel to lower1.2mof fenceto be6mm vertical barsat 50mmcentresand8mmhorizontal barsat 68mmcenteswith additional 8mmbar onreverse

on everythird horizontal fixed to two squarehollow section horizontal

rails.Mesh above1.2m to be6mm barsat 50mmcentresvertically

sandwiched betweetwo 8mmbarsat 200mmcentres. 4.10mlong x 80x 40x 3mmrectangul arhspos tsat 2.5mcentres in900mmsquareconcrete

foundation GradeST4.2no 3mx 3mdoubleleaf vehicleaccess gate.2no

2mhigh x 1.2mwidesingleleaf personnel gate.Gatesto open outwards.10mhigh lighting columns- refer to Rybka layout.

EXISTING  WOODLANDP LANTINGExisting Milleniumwoodland retained wherepossible,protected during

construction works,to complywith BS 5837

SUPPLEMENTARYWOODLANDPLANTING

Pit plant between existing remainingwoodland planting and cultivateand

notch plant adacent to school boundaryfence.Sprial guards,necessaryadditivesand timberstakes. Allowfor25% of total area of millenium

planting retained forsupplement planting.Speciesmix: 25% Quercusrobur

/ 25% Fraxinusexcelsior/20% Acer campestre/ 10% corylusavellana / 10%

ilex aquifolium/10% prunusspinosa

ASPHALTFOOTWAY

3mwideHot rolled asphalt footpathwith limestonechippingsspread at1kg/m2.Sub-baseto Engineer'sspecification.50 x 200mmconcretebullnosededging with 50mmupstand to path.6mhigh lighting columnsatregularspacings- referto Rybka lighting drawings.Golf ball stop fencing to Eastboundaryfootwayat edge of golf course- to CEC approved standards.

RESINBOUNDGRAVEL

Park entrances,Pedestrian ramp,School Plaza & Carparking bays - resinbound gravel,Addaset 6mm'Wessex Pearl'silvergrey,16mmthick laid tomanufacturer'srecommendations.Subbase to Engineer'sspecification.Parking baysand disabled/motorcycleparking delineatedwith whitethermosplasticlining paint

BLOCKPAVINGKeyblok charcoal grey100 x 200mmpaving blocks,used asbuilding trim/pedestrian accessfootwayto west entrance/car park entrance'table'levelwith footwayand to plaza area ascontrast lineswithinthe resinboundgravel.Sub baseto Engineer'sspecification.

STEPS

Precast concretestep units- C30concrete wet cast unitswith acid washed

finish to uniformgreycolour with inlaid contrast non-slip grip strips,hazard

warning paving to topand bottomof stepsand galvanised steel handrails

MILTONROADCROSSING

ProposednewToucan pedestrian / cyclecrossing to Engineer'sdetail

CONCRETEWALLS

Featurewallsin precast concretesmooth polished finish,depictingschool

name,to main pedestrian entranceand Plaza north

BUS STOP RELCOATION

Busstop - relocated 15mwest fromcurrent location onMiltonroad,toEngineer'sdetail /CEC approved.

ROADWAY / PLAYGROUND

Carpark roadwayand rear School playground - densebitumen macadem-referto Circledesign landscapelayout fordetail of courtyardsandEngineer'sspecification.

SELF BINDGRAVEL PATH

Geotextileto formation layer. 150mmdepth type1 sub-basewith 1in30

camber fromcentre l ine .2mwide50mmdepth,Cedecgo ld, as suppl ied byCED orequal and approved.150 x32mm long sawn larch timberedge

boards.Topsoil vergesbrought to 15mm abovepath surfacelevel to

allowforsettlement. Reusestripped sitetopsoil to fill levels.Reinstated soil

vergesto beraked, stonepicked and seeded with RigbyTaylorMascot R16ryefree seed mix (orequal approved) at 35g/m2,3 cutsweed freeand fully

establishedat Completion.

REVISION

G

F

E

D

C

B

A

DATE

14.09.10

16.08.10

11.08.10

10.08.10

04.08.10

28.07.2010

29.07.10

CHECKED

SR

NB

SR

SR

SR

SR

SR

NOTES

Updated layout toco-ord withJMAandCircle

2mpathadded tonorthof golfcourse

Minor adjustments tolayout followingarchitects comments

Paths toWest and East perimeter ofparkadded along withnewentranceandpossiblecrossing points

Mainpedestrianentrancedevelopedfollowing discussionwithplanners

Landscapeco-ordinationwithCircle Design

Steps & ramp added topedestrianentrance,pitchrepositioned,featurewalland seatingadded,disabled bays repositioned towithin45mof building entrance,levels adjusted

Sketchviewof pedestrianentrancesteps andramp withfeaturewalls

Sketchviewof pedestrianentrancefrom MiltonRoad

  Artificial pitchandfencing,with beechhedge

R e si n b ou n d gra ve l t o P la za a nd ca r p a rk b ays B e ech h ed g e an d se mi m a tu re tre es to ca r p a rk

SectionthroughMiltonRoad,footway,car park,pitches andmillennium plantingtoGolfcourse

Precastconcretesteps,inlaidwith grip strip andsteel handrail

Hotrolledasphaltwith whitechippings

Resinboundgravel