08.02.2013 as per divisonal formate
Post on 03-Apr-2018
224 Views
Preview:
TRANSCRIPT
-
7/28/2019 08.02.2013 as Per Divisonal Formate
1/35
From To
1 Sub Division wise Comprise of Revenue last fincial year and Current Financial year
2 Revenue Realization for the year 2012-13 ending Nov & during October And November2 4
3 No of Consumers Having Arrears from RS 5000-RS 50000
4 Metering Status as 31.11.20126 8
5 Division wise Connection added and load added as 30.11.2012
6 Feeder wise Energy Account for the month of October 201210 14
7 Feeder wise Trajectory of T&D losses15 19
8 Feeder wise Trajectory of ATC losses20 24
9 Feeder wise Energy Account for the month of September 201225 29
10 No of inspection conducted and fine imposed ( Excluding inspection by enforcement )30 31
11 No of inspection conducted by enforcement and ATR thereof32 35
12 Rate of Damage of transformers
13 Progress of VDLS forms37
36
Particular
Index for Review Meeting information ( meeting on05.01.2013) of
Electric Division -IV Khanyar
S.No
9
5
1
Page No
-
7/28/2019 08.02.2013 as Per Divisonal Formate
2/35
Pure ED Total Pure ED Total Pure ED Total Pure ED Total Pure ED Total Pure ED
1 62.56 13.77 76.33 5.45 1.20 6.65 15.55 3.41 18.96 37.62 8.26 45.88 20.70 4.55 25.25 141.88 31.19 173.07
2 13.36 2.94 16.30 4.36 0.96 5.32 6.44 1.41 7.85 9.89 2.17 12.06 4.29 0.94 5.23 38.34 8.42 46.76
3 0.09 0.02 0.11 0.42 0.09 0.51 0.34 0.08 0.42 0.01 0.01 0.02 1.57 0.34 1.91 2.43 0.54 2.97
4 2.38 0.53 2.91 4.92 1.08 6.00 1.20 0.27 1.47 22.86 5.03 27.89 0.94 0.21 1.15 32.30 7.12 39.42
1.34 0.00 1.34 0.00 0.00 0.00 0.00 0.00 0.00 23.28 0.00 23.28 2.21 0.00 2.21 26.83 0.00 26.83
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.72 0.53 4.25 4.92 1.08 6.00 1.20 0.27 1.47 46.14 5.03 51.17 3.15 0.21 3.36 59.13 7.12 66.25
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 4.80 1.05 5.85 0.15 0.03 0.18 0.21 0.05 0.26 0.57 0.13 0.70 2.85 0.63 3.48 8.58 1.89 10.47
9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 5.85 1.29 7.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.85 1.29 7.14
12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.91 1.96 10.87 0.00 0.00 0.00 8.91 1.96 10.87
13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 0.01 0.00 0.01 0.05 0.00 0.05 0.03 0.00 0.03 0.13 0.00 0.13 0.00 0.00 0.00 0.22 0.00 0.22
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #R
94.11 20.13 114.24 20.27 4.44 24.71 24.97 5.49 30.46 149.41 22.59 172.00 35.71 6.88 42.59 324.47 59.53 317.75 #R
#R
water
works.
water
works.
Purpose
Bulk
(a)Rev.
Misc
(b)Rev.
Misc
Total
(c)Army/SF
/BSF
Total (abc)
Public
Lighting
LT
Industries
HT
IndustriesIntensive
industries
Grand Total
Domestic
Commercia
l
Agriculture/
UEED
(a)State
(b)Central
SubDivison /Category wise Revenue Realization for the year 2012-2013 during 01/2013 of ED-IV Khanyar Srinagar
S.NoConsumer
CategorySub-Division Hawal
Sub-Division K.K.
Moulla
Sub-Division
Khanyar
Sub-Division
Rainawari
Sub-Division
Zakura Total Total
-
7/28/2019 08.02.2013 as Per Divisonal Formate
3/35
Pure ED Total Pure ED Total Pure ED Total Pure ED Total Pure ED Total Pure
1 495.74 109.09 604.83 52.66 11.61 64.27 139.13 30.55 169.68 276.59 60.76 337.35 150.14 32.97 183.11 111
2 222.39 48.95 271.34 36.28 8.00 44.28 65.79 14.44 80.23 86.17 18.92 105.09 39.29 8.63 47.92 44
3 0.15 0.04 0.19 4.44 0.99 5.43 6.69 1.48 8.17 0.18 0.06 0.24 18.59 4.07 22.66 3
4 431.46 94.97 526.43 22.61 5.01 27.62 7.84 1.73 9.57 328.48 72.12 400.60 3.12 0.69 3.81 79
17.36 0.00 17.36 0.00 0.00 0.00 0.00 0.00 0.00 156.95 0.00 156.95 16.66 0.00 16.66 19
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
448.82 94.97 543.79 22.61 5.01 27.62 7.84 1.73 9.57 485.43 72.12 557.55 19.78 0.69 20.47 98
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 0.09 0.00 0.00 0.00
8 28.87 6.34 35.21 1.56 0.34 1.90 1.59 0.36 1.95 2.40 0.56 2.96 21.76 4.77 26.53 5
9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 18.42 4.05 22.47 0.00 0.00 0.00 9.29 2.03 11.32 0.00 0.00 0.00 11.01 2.41 13.42 3
12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.75 13.56 75.31 0.00 0.00 0.00 6
13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 0.23 0.00 0.23 0.27 0.00 0.27 0.37 0.00 0.37 0.92 0.00 0.92 0.02 0.00 0.02
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1214.62 263.44 1478.06 117.82 25.95 143.77 230.70 50.59 281.29 913.44 166.07 1079.51 260.59 53.54 314.13 273
LT Public water
works.
HT Public
water works.
General
Purpose Bulk
(a)Rev. Misc
(b)Rev. Misc
Total
(c)Army/SF/BS
F
Total (abc)
Public Lighting
LT Industries
HT Industries
Power
Intensive
Domestic
Non.Dom/
Commercial
Agriculture/
UEED
(a)State
(b)Central
SubDivison /Category wise Revenue Realization for the year 2012-2013 Ending 01/2013 of ED-IV Khanyar Srinag
S.No Consumer
CategorySub-Division Hawal
Sub-Division K.K.
Moulla Sub-Division Khanyar Sub-Division Rainawari Sub-Division Zakura Total
-
7/28/2019 08.02.2013 as Per Divisonal Formate
4/35
DOM
Com
Ind
Total
%ageof
consumers
DOM
Com
Ind
Total
%ageof
consumers
DOM
Com
Ind
Total
%ageof
consumers
DOM
Com
Ind
Total
%ageof
consumers
DOM
Com
Ind
Total
%ageof
5000 to
10000510 150 21 681 3.10 125 51 2 239 3.30 55 30 0 85 2.64 490 115 6 611 1.24 197 24 s 221 3.
10001
to
20000
430 198 18 646 2.94 221 82 1 304 4.20 29 33 1 63 1.95 498 101 6 605 5.36 198 30 5 233 4.
20001
to
50000
525 197 25 747 3.40 195 84 3 282 3.90 49 76 0 125 3.88 401 75 5 481 4.26 125 27 5 157 2.
more
than
50000
62 61 16 139 0.63 62 91 8 161 2.23 19 22 0 41 1.27 59 31 5 95 0.84 23 32 11 66 1.
Execu
Electric Div
Consumers=3225 Total No of Consumers=11279
Consumers=5650
Installation retain more than 3 months tariff charges
Arrears
upto
Sub division Hawal Sub division Khanyar Sub division K.K.moulla Sub division Rainawari Sub division Zakura
Consumers=21963
Consumers=7231
-
7/28/2019 08.02.2013 as Per Divisonal Formate
5/35
Rwari
49348
11279
11279
11279
-
7/28/2019 08.02.2013 as Per Divisonal Formate
6/35
Division
Name of theSub
Division
Total No
registeredconsumers
ending Jan
2013
Meter installedagainst flate
Rate
Meters
installed
Damaged
defunct
Total
Rainawari 11279 10039 946 1680 2626 10985 294 1 months
Hawal 21963 9858 3066 260 3326 12924 9039 8 months
Khanyar 7231 3057 1265 41 1306 4322 2909 3 months
K.K.moulla
3225 388 433
12 445 821 2404
8 months
Zakura
5650 3209 1619 1174 2793
4828
822 2 months
Total 49348 26551 7329 3167 10496 33880 15468
Electric Division -IV Khanyar
Executive Engineer
Elec
tricDivision-IV
Khanyar
Status of Metering IN R-APDRP towns as on 31.1.2013 of Electric Division -IV Khanyar
EM&RE Circle 1stTotal Number of
meters installed
as on March 2012i.e. metered
consumers
Metered Installed during 2012-13
Total No of
meteredconsumers
Balance
requirement
Time
required for
installationof balance
meter
-
7/28/2019 08.02.2013 as Per Divisonal Formate
7/35
Domestic
Commericla
Industrial
Bulk
Govt.Deptt
PHE
Irrigation
To
tal
Domestic
Commericla
Industrial
Bulk
Govt.Deptt
PHE
Irrigation
To
tal
Domestic
Habak F2 965 145 8 0 1 1 4 1124 930 139 8 0 1 1 4 1083 35
Habak F3 780 54 5 0 0 0 3 842 708 50 5 0 0 0 3 766 72
Habak F5 1377 366 12 0 0 0 11 1766 1370 361 12 0 0 0 11 1754 7
Hazratbal F1 0 2 0 0 1 0 1 4 0 2 0 0 1 0 1 4 0
Hazratbal F2 416 302 0 0 7 1 6 732 403 291 0 0 7 1 6 708 13
Hazratbal F3 735 148 5 0 0 0 1 889 729 135 5 0 0 0 1 870 6Katrhidarwaza F1 871 81 6 0 0 0 1 959 859 77 6 0 0 0 1 943 12
Kathidarwaza F2 1059 186 20 0 0 0 1 1266 1046 174 20 0 0 0 1 1241 13
Kathidarwaza F3 0 1 0 0 9 1 3 14 0 1 0 0 9 1 2 13 0
Kathidarwaza F5 1199 70 4 0 0 0 1 1274 1197 68 4 0 0 0 1 1270 2
Rainawari F1 1 2 0 0 3 1 0 7 1 2 0 0 3 1 0 7 0
Rainawari F2 150 35 4 0 0 0 0 189 144 34 4 0 0 0 0 182 6
Rainawari F3 745 94 13 0 1 0 3 856 731 90 13 0 1 0 3 838 14
Rainawari F4 1125 225 3 0 3 0 1 1357 1089 210 3 0 3 0 1 1306 36
9423 1711 80 0 25 4 36 11279 9207 1634 80 0 25 4 35 10985 216
Illahaibagh F1 1394 279 9 0 1 1 0 1684 1383 276 6 0 1 1 0 1667 11
Illahaibagh F2 667 68 7 0 0 0 0 742 280 5 5 0 0 0 0 290 387
Owantabawan F1 990 137 4 0 1 1 0 1133 987 137 4 0 1 1 0 1130 3
Owantabawan F2 845 106 2 0 2 1 1 957 842 106 1 0 2 1 1 953 3
Bagwanpora F1 653 139 2 0 2 1 0 797 0 0 2 0 0 0 0 2 653
Bagwanpora F2 697 115 0 0 4 1 1 818 622 70 0 0 2 0 0 694 75
Bagwanpora F3 670 43 0 0 1 1 0 715 614 41 0 0 1 0 0 656 56
Soura F1 665 132 6 0 5 1 0 809 90 15 2 0 1 0 0 108 575
Soura F2692 138 8 0 2 0 1 841 56 12 7 0 0 0 0 75 636
Soura F3 1362 307 14 0 1 1 0 1685 1232 305 11 0 0 0 0 1548 130
Soura F4 608 146 5 0 1 1 0 761 72 26 3 0 1 0 0 102 536
Soura F5 962 233 5 0 1 1 1 1203 940 232 5 0 0 0 1 1178 22
Mughal Masjid F1 490 94 31 0 4 1 0 620 0 20 27 0 0 0 0 47 490
Mughal Masjid F3 687 96 10 0 2 1 0 796 0 0 10 0 0 1 0 11 687
W F3 275 20 0 0 3 0 0 298 0 0 0 0 0 0 0 0 275
Ra
inawar
i
ubDivisionHawal
Feeder wise/category wise metering status as on 31.12.2012
NameofSub
Division Feeder No/Name
Total No installations Total No metered installations
-
7/28/2019 08.02.2013 as Per Divisonal Formate
8/35
Lal Bazar F2 778 142 2 0 1 2 0 925 660 60 0 0 0 0 0 720 118 82
Lal Bazar F3 772 220 12 0 1 1 0 1006 770 220 9 0 1 0 0 1000 2 0
Total 18185 3429 272 0 53 18 6 21963 10669 1966 236 0 15 5 3 12894 7516 1463Zakura Z-1 0 41 40 6 0 0 87 0 41 40 4 0 0 85 0 0
ZakuraZ-2 616 69 5 1 0 0 691 616 69 5 1 0 0 691 0 0
Zakura Z-3 781 104 17 3 1 0 906 615 84 17 3 0 0 719 166 20
Zakura Z-4 983 84 18 5 1 2 1093 978 84 18 5 0 2 1092 0 0
Pandach P-2 328 45 1 2 0 0 376 328 45 1 2 0 0 376 0 0
Burzahamma B-1 462 13 13 1 1 0 490 18 9 13 0 0 0 40 444 4
BurzahammaB-2 709 27 14 3 1 0 754 709 27 14 3 0 0 753 0 0
BurzahammaB-3 168 8 4 0 0 0 180 0 1 4 0 0 0 5 168 7
BurzahammaB-4 449 11 13 1 2 1 477 448 11 13 0 0 0 473 0 0 Habak H-4 452 137 1 4 2 0 596 452 137 1 4 0 0 594 0 0
Total 4948 539 126 26 8 3 5650 4164 508 126 22 0 2 4828 778 31
Fateh Kadal F1 727 498 0 0 6 0 0 1231 75 189 0 0 6 0 0 270 652 309
Fateh Kadal F4 442 343 1 0 0 0 786 0 185 1 0 0 0 0 186 442 158
Fateh Kadal F5 0 4 0 0 7 0 0 11 0 2 0 0 7 0 0 9 0 2
Khayam F2 918 262 2 0 3 0 0 1185 187 159 2 0 3 0 0 351 731 103
khanyar F6 3 9 0 0 0 0 0 12 0 6 0 0 0 0 0 6 3 3
2090 1116 3 0 16 0 0 3225 262 541 3 0 16 0 0 822 1828 575
Fateh Kadal F3 1062 285 17 1 2 0 0 1367 1062 285 17 1 2 0 0 1367 0 0Fateh Kadal F4 720 200 0 0 2 0 0 922 287 40 0 0 0 0 0 327 433 160
Khanyar F3 419 80 1 0 1 0 0 501 419 80 1 0 1 0 0 501 0 0
Khanyar F4 646 166 1 0 9 1 0 823 646 166 1 0 9 1 0 823 0 0
Khanyar F5 490 141 2 0 5 2 0 640 150 42 0 0 0 2 0 194 340 99
Khanyar F6 1046 308 7 0 2 0 0 1363 80 7 0 0 0 0 0 87 966 301
Khanyar F7 665 340 8 0 2 0 0 1015 400 136 0 0 0 0 0 536 265 204
Rainawari F2 294 97 2 0 3 0 0 396 220 57 2 0 3 0 0 282 74 40
Rainawari F4 71 6 0 0 0 0 0 77 71 6 0 0 0 0 0 77 0 0
Kawdara F4 32 95 0 0 0 0 0 127 32 95 0 0 0 0 0 127 0 05445 1718 38 1 26 3 0 7231 3367 914 21 1 15 3 0 4321 2078 804
40091 8513 519 1 146 33 45 49348 27669 5563 466 1 93 12 40 33850 12416 2950
A E E A E A E E A E E A E E Executive Engineer
Zakura
k.k.M
OULLA
Khanyar
Grand Total
-
7/28/2019 08.02.2013 as Per Divisonal Formate
9/35
As on March
2012
Added ending
Jan 2013
As on ending
jan 2013
As on March
2012
Added ending
jan 2012
As on ending
jan 2012
1 ED-IV 48628 720 49348 43.83 7.59 51.42
48628 720 49348 43.83 7.59 51.42TOTAL
Executive Engineer
Electric Division -IV Khanyar
Division Wise Number of Connections added and load added therof as on 31.1. 2013
S.No Name of Division
No. of Connections Load in MWs
-
7/28/2019 08.02.2013 as Per Divisonal Formate
10/35
S.NO Name ofConsumer
Inspection
coductedby ID Ref Inspection finding
MonthUnits
consumedAssesment
Mar-12 1306 4649.00
Apr-12 2150 7990.00
May-12 1995 7439.00
MonthUnits
consumedAssesment
Mar-12 560 2456.00
Apr-12 680 3063.00
May-12 520 2495.00
MonthUnits
consumedAssesment
Mar-12 900 6864.00
Apr-12 1240 9224.00
May-12 1360 9886.00
MonthUnits
consumedAssesment
Mar-12 700 3841.00
Apr-12 640 3910.00
May-12 1000 5190.00
2. Billing details for last three Month
2. Load =62 A
2 Kay Stores 355
1. Meter without name plate
5. Seprate ID No 354 for lighting under rate code 2 for that Agt Revised to 1 KW
against 0.25 KW with fine imposed of s 3000.00
3. Sep. 1-PH for lighting3. Load Revised to 10 kW against 7.5 kW with fine imposed of Rs 3000.00
4. Removal of Single PH meter Fresh energy meter instaled
Action taken report regarding the inpection conducted by Enforcement team
Action Taken Report
1 Wani Metal
E
nforcementteam
346
Motors with name plate properly sealed2. Billing details for last three Month
1. Meter without seal
1. Meter box sealed
1. Present Reading =3869
3 ARK
2. Starter name plate shows
40 HP each
3. Boiler =1 N0 (1.5 kW)
3. Load found 20 HP each with 10HP (old type)
4.Shifting of meter Stands done
397
1. LT is close promixity
apprehension of hooking
Billing details for the last 3 months is under
-
7/28/2019 08.02.2013 as Per Divisonal Formate
11/35
S.NO
ame o
Consumer
nspec on
coductedby ID Ref Inspection finding
MonthUnits
consumedAssesment
Mar-12 142 1362.00
Apr-12 151 1397.00
May-12 231 1949.00
MonthUnits
consumed Assesment
Mar-12 640 4558.00
Apr-12 920 6424.00
May-12 1220 8079.00
2. Seprate 1-PH for lighting
MonthUnits
consumedAssesment
Mar-12 2010 16305.00
Apr-12 630 16305.00
May-12 2490 16305.00
Two connection to one
installation
meter with ring type CTs
4 Taj species 15269
Billing details for the last 3 months is under
2. Seprate 1-PH for lighting
2. Agt revised to 11Kw against 7.5 KW with fien imposed RSs 2000.00
3.Removal of 1-PH line stands done
2. Seprate 1-PH for lighting
2. Load found normal hence no action taken as per tariff
3.Removal of 1-PH line stands done
4.Reading as on 14.06.2012 is 3905
369
1. Present Reading =13492
7
National
woodindustries 393
4.Reading as on 14.06.2012 is 39716
GH Mohd
Khan 371
5
15268
load =110 Amp
Billing details for the last 3 months is under
1. Besides 40 HP having ID Nom 393 extra motors are running under seprate
ID No 391 sanctioned load of 24 HP along with sepoarate 3 phase meter
1. Present Reading =3936
2. Seprate 1-PH for lighting
Direct taping for 1 motor
Billing details for the last 3 months is under
2. CT ratio 50/5 checked as per spot
Manzoor/
Bashir
Ahmad
E
nforcementteam
S Q furniture
8
1. Fine impose of RS 5573
2. New Prodigy meter installed
Action Taken Report
4.Reading as on 14.06.2012 is 13548
2. Fine imposed of Rs 2500.00
3. Removal of 1 phase line under process
2. No seprate 1 PH line
3.Shifting of meter stands done
-
7/28/2019 08.02.2013 as Per Divisonal Formate
12/35
The ring type CTs are dead
showing Zero out put
Easy access to supply side of
meter
Meter note book not maintained
S.NO
Name of
Consumer
Inspection
coducted
by ID Ref Inspection finding
meter old TTL make analong
type.The old seal No 05135
was broken by the squard for
inspection and later new seal
No 03329 was put on the
meter
No capacitor installed
TheCTS are defective and are
not measuring the exact
energy consumed by the
installatio.On measurment it
was found that the CTs are
recording 23% less energy
which may be recovered from
the consumer as per
SERC/JKSERC supply code
RegulationsTwo conection found on same
installations
1. Direct Hook
2. Load = 15 A
1. Direct Hook
2. Load = 15 A
9
M/S Zamir
Fayaz 415
3. Single phase connection cancelled and load merged with 3-Phase
connection.
Action Taken Report
10
M/S galaxy
Textiles
Enforcementteam
15275
New Digital meter installed .
13
Ghulam Nabi
Darzi R/O
Kanitar.
9553 Load Revised to 3 KW against 0.75 kW & Fine imposed Rs. 5200.
2.Old meter replaced with prodigy meter for two units as per directions
3. Single phase connection cancelled and load merged with 3-Phase connection
12
Mohd Shafi
Bhat R/O
Kanitar.
9551 Load Revised to 3 KW against 0.75 kW & Fine imposed Rs. 5200.
11
M/S weaver
Shawls 22420
1. Fine imposed of Rs 26049.00
-
7/28/2019 08.02.2013 as Per Divisonal Formate
13/35
1. Direct Hook
2. Load = 18 A
1. Direct Hook
2. Load = 16 A
S.NO
Name of
Consumer
Inspection
coducted
by ID Ref Inspection finding
1. Direct Hook
2. Load = 19 A
1. Direct Hook
2. Load = 10 A
1. Direct Hook
2. Load = 15 A
Executive Engineer
Electric Division -IV Khanyar
14
Javaid Ahmad
Zargar R/O
Kanitar.757 Load Revised to 3 KW against 0.75 kW & Fine imposed Rs. 5200.
15
Khurshid
Ahmad Zaz
R/O Kanitar.3610 Load Revised to 3 KW against 0.5 kW & Fine imposed Rs. 5200.
Action Taken Report
16
Mudasir
Maqbool R/O
Kanitar.
Enforcementteam 5710 Load Revised to 3 KW against 0.75 kW & Fine imposed Rs. 5200.
17
Ali Mohd.
Bhat R/O
Kanitar.9671 Load Revised to 3 KW against 0.5 kW & Fine imposed Rs. 5200.
18
Gh. Mohd.
Kangoo R/O
Kanitar.5615 Load Revised to 3 KW against 0.75 kW & Fine imposed Rs. 5200.
-
7/28/2019 08.02.2013 as Per Divisonal Formate
14/35
-
7/28/2019 08.02.2013 as Per Divisonal Formate
15/35
-
7/28/2019 08.02.2013 as Per Divisonal Formate
16/35
Fine Recovered
(in lacs)
1 Hawal 130 3.95 1.5691
2 K.K.Moulla 60 0.00 0.0042.02
3 Rainawari 1234 11.23 7.65 1540
4 Khanyar 53 0.60 0.41 30.00
5 Zakura 165 2.80 0.9766.5
Total 1642 18.58 10.59 1769.52
Executive EngineerElectric Division IV Khanyar
Inspection Conducted Ending 01/2013 of Electric Division -IV Khanyar
S.No Name of Sub Division No of inspectionsconducted
Fine Imposed (inlacs)
Load Revised (inKW)
-
7/28/2019 08.02.2013 as Per Divisonal Formate
17/35
302
-
7/28/2019 08.02.2013 as Per Divisonal Formate
18/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12
Fateh Kadal F 3 70.52 69.41 69.58 62.54 56.26 55.66 59.32 49.07 68.48
Fateh Kadal F4 76.30 79.08 78.14 68.00 65.34 62.18 65.32 27.07 63.10Khanyar F3 29.90 34.00 17.00 19.13 29.34 15.24 19.10 51.88 65.03
Khanyar F4 79.82 82.62 77.44 78.06 65.58 76.39 76.55 37.48 36.97
Khanyar F7 60.48 60.57 63.25 34.00 25.09 28.55 30.36 29.33 42.34
Khanyar F5 59.54 58.85 52.67 51.99 34.64 51.27 51.96 43.47 46.35
Khanyar F6 75.97 74.00 68.57 69.90 54.19 67.86 67.80 24.15 60.33
Rainawari F2 69.91 77.24 48.35 61.82 57.89 63.08 60.82 14.29 42.34
Zakura Z-1 44.00 15.07 36.45 18.86 12.05 1.27 4.84 18.89 1.75
Zakura Z-2 63.97 45.78 34.06 27.62 30.61 28.14 59.54 65.83 70.85
Zakura Z-3 86.78 76.70 75.71 68.83 67.02 65.82 72.31 78.55 79.34Zakura Z-4 85.08 79.61 69.58 67.42 61.19 68.46 55.16 65.12 78.58
Pandach P-2 58.06 33.33 34.00 57.79 28.41 31.11 42.73 82.28 81.79
Burzahama B-1 86.65 86.24 86.06 83.33 80.45 81.43 83.33 86.56 85.12
Burzahama B-2 87.97 96.80 87.51 87.07 80.34 79.25 84.12 87.83 85.82
Burzahama B-3 96.59 96.16 96.01 95.47 94.35 89.61 90.42 92.79 92.52
Burzahama B-4 92.19 90.96 88.00 87.94 85.44 86.25 83.40 88.19 87.87
Habak H-4 65.11 42.86 49.77 42.94 34.67 36.33 40.61 45.55 50.96
T&D Losses (in %age)
Statement Showing Division Wise Feeder Wise Trajectory of
NameofSubdivis
ion
Division Name of
the
Receiving
Station
Name
of the
Feeder
Khanyar
Zakura
-
7/28/2019 08.02.2013 as Per Divisonal Formate
19/35
Habak F "2" 73.68 70.46 64.00 65.44 61.66 59.27 64.00 71.66 71.38
Habak F "3" 74.02 72.32 83.17 78.35 72.39 73.43 75.29 69.18 70.78
Habak F "5" 83.38 81.91 79.84 73.82 72.63 61.18 69.21 77.76 77.01
Hazratbal F "1" 7.83 4.30 0.29 5.66 13.96 13.60 11.60 3.48 4.43
Hazratbal F "2" 3.01 4.33 8.18 4.11 42.36 37.57 47.78 43.56 44.53
Hazratbal F "3" 78.35 76.29 78.74 75.41 60.71 61.39 65.68 67.97 67.11
Kathidar waza F "1" 92.84 89.28 84.62 61.24 68.16 67.09 71.59 75.55 75.94
Kathidar waza F "2" 90.26 89.71 88.66 78.00 77.75 75.93 78.68 80.71 81.27
Kathidar waza F "3" 0.97 10.64 2.33 3.51 1.32 2.60 2.22 2.33 2.22
Kathidar waza F "5" 85.45 85.38 66.54 66.35 78.17 77.68 79.05 80.87 81.69
Rainawari F "1" 9.88 14.02 25.00 26.74 17.87 18.12 16.30 14.49 14.98
Rainawari F "2" 82.50 90.23 89.06 79.03 83.33 82.69 82.58 81.18 81.63
Rainawari F "3" 70.74 71.70 86.47 73.86 75.62 77.87 78.29 79.56 81.91
Rainawari F "4" 76.02 75.17 85.92 76.35 72.17 79.67 77.99 83.87 85.65
Fateh Kadal F1 76.31 75.22 76.07 72.71 68.64 68.18 70.41 77.93 72.75
Fateh Kadal F4 85.59 84.88 83.24 76.33 68.86 67.78 68.96 76.92 72.42Fateh Kadal F5 10.34 2.08 2.08 2.08 2.08 2.08 3.57 18.18 1.67
Khayam F2 81.27 79.90 79.43 75.29 71.51 70.66 72.06 78.34 72.05
ellahi Bagh EB-F1 81.46 80.73 76.25 72.59 32.21 31.21 59.21 74.70 77.32
Owantabawan OB-F2 83.26 82.18 82.00 78.95 46.92 48.39 74.31 80.84 80.70
Owantabawan OB-F1 83.84 83.84 81.70 79.52 49.29 52.51 71.66 80.82 80.38
Bagwanpora BP-F2 59.80 59.80 48.22 49.04 10.10 10.32 43.47 59.63 65.46
Soura Soura SR-F5 68.43 68.43 72.58 66.44 14.18 16.07 57.53 70.99 68.17
Soura Soura SR-F3 67.42 67.42 61.79 63.21 2.86 7.15 46.65 69.10 70.35
BAMK BAMK-F1 12.97 12.97 11.75 5.83 20.44 12.78 5.08 22.16 32.80
BAMK BAMK-F6 90.97 90.97 90.73 70.50 60.55 66.81 87.47 1.29 65.99
Soura Soura SR-F1 83.90 83.90 82.65 81.91 55.13 57.03 71.06 89.26 86.62
Soura Soura SR-F2 46.68 46.68 40.28 40.81 -31.03 6.84 16.40 80.56 71.24
Soura Soura SR-F4 83.85 83.85 82.81 81.65 58.82 60.04 75.91 86.27 85.71
ellahi Bagh EB-F2 82.98 82.98 78.96 75.75 47.09 48.24 69.76 84.22 86.68
Bagwanpora BP-F1 81.90 81.90 79.36 74.86 45.28 40.25 59.81 75.77 81.12
Bagwanpora BP-F3 86.71 85.79 85.28 82.33 58.27 56.71 72.36 81.16 81.11
mughal masjid MM-F1 78.67 78.67 77.55 81.30 20.59 8.72 74.18 78.22 78.92Hawal
Rainawari
K.K
.
moulla
-
7/28/2019 08.02.2013 as Per Divisonal Formate
20/35
mughal masjid MM-F3 87.15 87.15 86.78 84.87 64.83 59.87 69.77 84.26 82.72
Zoonimar ZN-F187.19 84.94 83.95 80.98 53.59 64.21 64.40 85.38 80.32
BAMK BAMK-F297.44 97.44 96.58 88.92 51.89 59.50 73.72 83.12 76.26
BAMK BAMK-F3 84.71 84.71 82.11 79.71 51.60 63.25 73.86 86.92 83.85
BAMK BAMK-F4 81.86 79.24 76.70 71.77 35.71 48.29 71.14 82.58 81.48
lal Bazar LB-F1 70.32 70.32 70.02 67.04 11.98 10.28 54.40 68.13 67.65
lal Bazar LB-F2 67.77 66.96 69.40 66.55 47.13 54.00 55.29 82.74 80.56
lal Bazar LB-F3 82.94 81.38 78.22 74.04 26.07 26.92 54.55 77.96 78.82
-
7/28/2019 08.02.2013 as Per Divisonal Formate
21/35
Dec-12
Base line
Data (FY
2011-12
ending
March 2012)
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12
79.98 72.66 78.24 87.79 65.45 79.01 72.51 73.92 68.86 81.95 89.071
80.34 77.68 78.05 91.17 45.57 64.43 61.22 80.99 76.77 85.397 82.62575.11 71.46 85.00 92.67 62.75 81.08 68.57 50.43 84.65 80.31 83.445
79.04 80.35 87.25 93.60 68.73 68.71 76.85 84.11 67.28 74.245 89.874
59.56 63.08 73.00 81.93 70.63 47.71 34.32 59.01 53.44 73.359 57.951
78.66 66.86 75.52 88.78 48.37 58.74 58.22 78.07 64.90 82.117 88.899
83.66 76.24 78.85 89.26 72.33 80.02 77.30 73.14 71.34 90.671 91.63634.63 67.50 80.70 97.20 67.93 58.56 70.70 74.77 39.09 69.112 73.54
16.73 79.28 18.15 66.45 6.90 46.50 65.81 -8.93 53.67 24.904 44.8972.73 96.49 79.39 49.19 56.67 65.84 67.48 54.12 60.91 64.734 59.821
77.15 96.58 82.97 91.05 70.41 60.52 68.23 65.37 73.17 74.493 74.66371.25 95.46 77.15 84.35 62.47 39.63 14.29 37.52 74.73 80.976 76.119
83.11 91.17 31.15 62.77 11.55 23.89 37.26 34.62 85.38 82.296 75.9484.72 98.51 93.94 96.76 74.95 79.27 74.27 72.32 87.78 84.541 82.03588.06 99.05 96.06 96.99 78.88 74.48 68.70 72.20 87.07 85.876 77.50396.46 98.69 93.78 97.94 95.62 88.30 92.12 90.09 91.55 89.687 94.51686.48 98.63 93.49 95.89 77.61 84.36 42.40 54.97 89.88 88.243 86.28855.08 78.64 39.72 62.29 17.36 21.33 20.88 -0.68 41.87 50.061 53.448
T&D losses and AT&C Losses
AT&C Loss (in %age)
-
7/28/2019 08.02.2013 as Per Divisonal Formate
22/35
67.01 82.20 77.37 86.93 67.92 68.98 70.60 23.10 78.11 72.406 74.25473.54 81.31 89.92 92.96 79.55 74.33 82.33 69.24 82.59 80.669 81.24777.75 91.39 86.37 91.01 76.28 83.03 65.63 73.08 80.69 79.867 77.8264.46 98.70 19.10 99.18 -136.78 81.78 92.80 -158.88 99.65 -136.31 99.68849.53 74.35 -39.72 91.68 -1.15 -54.35 24.80 55.60 79.41 -70.26 55.447
66.12 87.13 82.07 91.32 72.09 72.39 70.36 76.50 69.56 62.144 79.81880.73 96.17 87.66 83.79 62.88 74.49 67.54 78.89 83.20 81.48 82.38482.23 94.80 91.78 97.50 81.82 81.46 82.83 75.33 90.18 85.397 76.7362.50 99.60 35.71 100.00 -117.93 -411.70 -469.24 98.38 -167.31 -27.288 48.255
82.72 95.76 93.69 99.63 86.44 92.39 92.39 88.45 93.97 86.364 80.35616.99 95.43 89.24 100.00 -170.94 88.15 91.46 99.86 -484.71 36.143 -87.09482.26 91.76 94.54 99.40 84.98 89.53 88.95 89.87 88.28 89.444 80.31482.62 92.27 89.16 99.18 80.16 84.39 84.70 69.88 89.12 89.079 86.56486.07 94.26 91.42 98.34 79.57 85.47 88.39 90.62 91.97 89.005 90.31272.00 87.56 84.10 90.23 59.42 73.78 75.20 76.67 82.88 74.08 80.033
72.91 86.62 83.46 90.13 61.39 71.92 75.25 76.79 78.06 73.606 74.8352.08 69.71 55.67 100.00 -138.18 100.00 -230.80 100.00 100.00 11.752 -133.49
73.00 87.00 83.22 90.27 49.95 72.86 81.37 82.73 85.30 74.29 81.11776.88 77.70 77.70 75.60 53.16 53.70 56.11 55.32 74.44 71.249 79.21982.77 90.81 90.81 90.57 80.23 84.23 85.04 74.61 83.85 75.803 79.94680.74 81.45 81.45 79.51 76.82 70.82 73.51 74.79 82.41 76.114 84.22764.08 73.73 73.73 76.49 66.93 54.50 55.58 45.51 79.51 44.601 67.48166.52 61.49 61.49 75.72 57.98 46.78 48.51 57.85 68.80 64.354 63.58969.04 66.17 66.17 65.57 65.13 48.47 40.49 38.84 69.82 59.372 69.13638.70 33.78 33.78 33.78 -37.61 57.91 55.35 9.01 -12.07 43.129 31.886
63.05 88.25 95.87 52.17 97.09 86.42 94.62 88.53 69.00 61.047 71.80987.40 81.54 81.54 84.32 78.18 71.98 73.53 74.39 87.82 80.939 87.52472.96 41.24 41.24 62.65 32.66 11.56 30.38 21.76 83.36 57.534 69.70186.49 82.18 82.18 86.23 79.43 73.33 70.04 76.57 88.85 82.1 85.1587.46 85.55 85.55 83.13 66.26 72.82 74.30 72.32 83.19 84.626 84.28777.42 76.62 76.62 78.52 71.33 61.75 57.88 61.23 34.91 71.271 76.48279.29 79.61 85.17 88.37 79.17 71.75 75.76 73.87 89.61 74.66 81.172.18 67.35 82.45 85.07 76.81 62.00 64.02 63.76 85.97 75.903 70.869
-
7/28/2019 08.02.2013 as Per Divisonal Formate
23/35
78.34 83.93 85.20 90.89 75.32 77.21 75.99 69.92 85.65 76.973 83.452
84.57 82.63 82.63 83.07 81.62 64.92 77.4464.62 80.22 72.196 80.614
77.96 84.67 90.90 89.59 89.48 76.91 86.9673.94 84.19 67.012 77.385
83.00 80.75 84.42 88.57 76.22 71.59 79.95 74.75 84.15 81.809 85.204
82.25 79.09 79.29 82.31 67.09 65.74 73.34 73.25 82.18 75.145 77.402
70.51 68.99 69.07 68.01 62.14 55.73 57.54 52.56 75.20 62.512 69.75874.60 62.91 70.59 73.78 62.76 55.77 52.70 54.74 79.93 75.504 78.22178.78 71.33 71.70 80.40 71.69 63.18 55.90 57.95 80.06 78.899 70.182
-
7/28/2019 08.02.2013 as Per Divisonal Formate
24/35
S.No Name of Sub Division
No of VLDS forms
received Load added (in kW) Remarks
1 Khanyar No response
2 K.K.Moulla No response
3 Zakura 3 5 No response
4 Rainawari 6 30 under progress
5 Hawal 78 210 under progress
87 245
Progress in respect of VLDS as on 31.1.2013
Total
Executive Engineer
Electric Division -IV Khanyar
-
7/28/2019 08.02.2013 as Per Divisonal Formate
25/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Fateh Kadal F 3 70.5269.41 69.58 62.54 56.26 55.66 59.32 49.07 68.48 79.98
Fateh Kadal F4 76.3079.08 78.14 68.00 65.34 62.18 65.32 27.07 63.10 80.34
Khanyar F3 29.9034.00 17.00 19.13 29.34 15.24 19.10 51.88 65.03 75.11
Khanyar F4 79.8282.62 77.44 78.06 65.58 76.39 76.55 37.48 36.97 79.04
Khanyar F7 60.4860.57 63.25 34.00 25.09 28.55 30.36 29.33 42.34 59.56
Khanyar F559.54 58.85 52.67 51.99 34.64 51.27 51.96 43.47 46.35 78.66
Khanyar F675.97 74.00 68.57 69.90 54.19 67.86 67.80 24.15 60.33 83.66
Rainawari F269.91 77.24 48.35 61.82 57.89 63.08 60.82 14.29 42.34 34.63
Statement Showing Division Wise Feeder Wise Trajectory of T&D losses and AT&C Losses
Nameo
fSu
bdivision
Division Name of
the
Receiving
Station
Nameo
fthe
Feeder
T&D Losses (in %age)
Khanyar
-
7/28/2019 08.02.2013 as Per Divisonal Formate
26/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Zakura Z-1 44.00 15.07 36.45 18.86 12.05 1.27 4.84 18.89 1.75 16.73
Zakura Z-2 63.97 45.78 34.06 27.62 30.61 28.14 59.54 65.83 70.85 72.73
Zakura Z-3 86.7876.70 75.71 68.83 67.02 65.82 72.31 78.55 79.34 77.15
Zakura Z-4 85.0879.61 69.58 67.42 61.19 68.46 55.16 65.12 78.58 71.25
Pandach P-2 58.0633.33 34.00 57.79 28.41 31.11 42.73 82.28 81.79 83.11
Burzahama B-1 86.6586.24 86.06 83.33 80.45 81.43 83.33 86.56 85.12 84.72
Burzahama B-2 87.9796.80 87.51 87.07 80.34 79.25 84.12 87.83 85.82 88.06
Burzahama B-3 96.5996.16 96.01 95.47 94.35 89.61 90.42 92.79 92.52 96.46
Burzahama B-4 92.1990.96 88.00 87.94 85.44 86.25 83.40 88.19 87.87 86.48
Habak H-4 65.11 42.86 49.77 42.94 34.67 36.33 40.61 45.55 50.96 55.08
Nameo
fSu
bdivision
Division Name of
the
Receiving
Station
Nameo
fthe
Feeder
Zakura
Statement Showing Division Wise Feeder Wise Trajectory of T&D losses and AT&C Losses
T&D Losses (in %age)
-
7/28/2019 08.02.2013 as Per Divisonal Formate
27/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Habak F "2" 73.68 70.46 64.00 65.44 61.66 59.27 64.00 71.66 71.38 67.01
Habak F "3" 74.02 72.32 83.17 78.35 72.39 73.43 75.29 69.18 70.78 73.54
Habak F "5" 83.38 81.91 79.84 73.82 72.63 61.18 69.21 77.76 77.01 77.75
Hazratbal F "1"7.83 4.30 0.29 5.66 13.96 13.60 11.60 3.48 4.43 4.46
Hazratbal F "2"3.01 4.33 8.18 4.11 42.36 37.57 47.78 43.56 44.53 49.53
Hazratbal F "3"78.35 76.29 78.74 75.41 60.71 61.39 65.68 67.97 67.11 66.12
Kathidar waz F "1" 92.84 89.28 84.62 61.24 68.16 67.09 71.59 75.55 75.94 80.73
Kathidar waz F "2" 90.26 89.71 88.66 78.00 77.75 75.93 78.68 80.71 81.27 82.23
Kathidar waz F "3"0.97 10.64 2.33 3.51 1.32 2.60 2.22 2.33 2.22 2.50
Kathidar waz F "5" 85.45 85.38 66.54 66.35 78.17 77.68 79.05 80.87 81.69 82.72
Rainawari F "1" 9.88 14.02 25.00 26.74 17.87 18.12 16.30 14.49 14.98 16.99
Rainawari F "2" 82.50 90.23 89.06 79.03 83.33 82.69 82.58 81.18 81.63 82.26
Rainawari F "3" 70.74 71.70 86.47 73.86 75.62 77.87 78.29 79.56 81.91 82.62
Rainawari F "4" 76.02 75.17 85.92 76.35 72.17 79.67 77.99 83.87 85.65 86.07
Nameo
fSub
division
Division Name of
theReceiving
Station
Nameo
fthe
Fee
der
T&D Losses (in %age)
Rainawari
-
7/28/2019 08.02.2013 as Per Divisonal Formate
28/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Fateh Kadal F1 76.31
75.22 76.07 72.71 68.64 68.18 70.41 77.93 72.75 72.00
Fateh Kadal F4 85.59
84.88 83.24 76.33 68.86 67.78 68.96 76.92 72.42 72.91
Fateh Kadal F5 10.34
2.08 2.08 2.08 2.08 2.08 3.57 18.18 1.67 2.08
Khayam F2 81.27
79.90 79.43 75.29 71.51 70.66 72.06 78.34 72.05 73.00
Nameo
fSu
bdivisio
nDivision
Nameo
fthe
Receiv
ing
Station
Nameo
fthe
Fee
der
K.K.moulla
T&D Losses (in %age)
-
7/28/2019 08.02.2013 as Per Divisonal Formate
29/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12
May
-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
ellahi Bagh EB-F1 81.46 80.73 76.25 72.59 32.21 31.21 59.21 74.70 77.32 76.88
Owantabawa OB-F2 83.26 82.18 82.00 78.95 46.92 48.39 74.31 80.84 80.70 82.77
Owantabawa OB-F1 83.84 83.84 81.70 79.52 49.29 52.51 71.66 80.82 80.38 80.74
Bagwanpora BP-F2 59.80 59.80 48.22 49.04 10.10 10.32 43.47 59.63 65.46 64.08
Soura Soura SR-F5 68.43 68.43 72.58 66.44 14.18 16.07 57.53 70.99 68.17 66.52
Soura Soura SR-F3 67.42 67.42 61.79 63.21 2.86 7.15 46.65 69.10 70.35 69.04
BAMK-
12.97 12.97 11.75 5.83 20.44 12.78 5.08 22.16 32.80 38.70
BAMKBAMK-
F690.97
90.97 90.73 70.50 60.55 66.81 87.47 1.29 65.99 63.05
Soura Soura SR-F1 83.90 83.90 82.65 81.91 55.13 57.03 71.06 89.26 86.62 87.40
Soura Soura SR-F2 46.68 46.68 40.28 40.81 -31.03 6.84 16.40 80.56 71.24 72.96
Soura Soura SR-F4 83.85 83.85 82.81 81.65 58.82 60.04 75.91 86.27 85.71 86.49
ellahi Bagh EB-F2 82.98 82.98 78.96 75.75 47.09 48.24 69.76 84.22 86.68 87.46
Bagwanpora BP-F1 81.90 81.90 79.36 74.86 45.28 40.25 59.81 75.77 81.12 77.42
Bagwanpora BP-F3 86.71 85.79 85.28 82.33 58.27 56.71 72.36 81.16 81.11 79.29
mughal masji MM-F1 78.67 78.67 77.55 81.30 20.59 8.72 74.18 78.22 78.92 72.18
mughal masji MM-F3 87.15 87.15 86.78 84.87 64.83 59.87 69.77 84.26 82.72 78.34
Zoonimar ZN-F1 87.19 84.94 83.95 80.98 53.59 64.21 64.40 85.38 80.32 84.57
BAMKBAMK-
F2 97.44 97.44 96.58 88.92 51.89 59.50 73.72 83.12 76.26 77.96
BAMKBAMK-
F3 84.71 84.71 82.11 79.71 51.60 63.25 73.86 86.92 83.85 83.00
BAMKBAMK-
F4 81.86 79.24 76.70 71.77 35.71 48.29 71.14 82.58 81.48 82.25
lal Bazar LB-F1 70.32 70.32 70.02 67.04 11.98 10.28 54.40 68.13 67.65 70.51
lal Bazar LB-F2 67.77 66.96 69.40 66.55 47.13 54.00 55.29 82.74 80.56 74.60
lal Bazar LB-F3 82.94 81.38 78.22 74.04 26.07 26.92 54.55 77.96 78.82 78.78
Nameof
Su
bdivision
Div
ision Name of
the
ReceivingStation
Nameo
fthe
Fee
der T&D Losses (in %age)
Hawal
-
7/28/2019 08.02.2013 as Per Divisonal Formate
30/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Fateh Kadal F 3 72.7
78.2
87.8 65.5
79.0 72.5
73.9 68.9 81.9 89.1
Fateh Kadal F4 77.778.1
91.2 45.664.4 61.2
81.0 76.8 85.4 82.6
Khanyar F3 71.585.0
92.7 62.881.1 68.6
50.4 84.6 80.3 83.4
Khanyar F4 80.487.3
93.6 68.768.7 76.9
84.1 67.3 74.2 89.9
Khanyar F7 63.1
73.0
81.9 70.647.7 34.3
59.0 53.4 73.4 58.0
Khanyar F566.9 75.5 88.8 48.4 58.7 58.2
78.1 64.9 82.1 88.9
Khanyar F676.2 78.9 89.3 72.3 80.0 77.3
73.1 71.3 90.7 91.6
Rainawari F2 67.5 80.7 97.2 67.9 58.6 70.7 74.8 39.1 69.1 73.5
Statement Showing Division Wise Feeder Wise Trajectory of T&D losses and AT&C Losses
Name of
the
Receiving
Station
Khanyar
AT&C Loss (in %age)
NameoftheFee
der
NameofSubdivi
sion
Division
-
7/28/2019 08.02.2013 as Per Divisonal Formate
31/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12
Zakura Z-1 79.28 18.15 66.45 6.90 46.50 65.81 -8.93 53.67 24.90 44.89
Zakura Z-2 96.49 79.39 49.19 56.67 65.84 67.48 54.12 60.91 64.73 59.82
Zakura Z-3 96.58 82.97 91.05 70.41 60.52 68.23 65.37 73.17 74.49 74.66
Zakura Z-4 95.46 77.15 84.35 62.47 39.63 14.29 37.52 74.73 80.98 76.12
Pandach P-2 91.1731.15
62.77 11.5523.89 37.26
34.62 85.38 82.30 75.94
Burzahama B-1 98.5193.94
96.76 74.9579.27 74.27
72.32 87.78 84.54 82.04
Burzahama B-2 99.0596.06
96.99 78.8874.48 68.70
72.20 87.07 85.88 77.50
Burzahama B-3 98.6993.78
97.94 95.6288.30 92.12
90.09 91.55 89.69 94.52
Burzahama B-4 98.6393.49
95.89 77.6184.36 42.40
54.97 89.88 88.24 86.29
Habak H-4 78.6439.72
62.29 17.3621.33 20.88
-0.68 41.87 50.06 53.45
NameofSubdivi
sion
Division Name of
the
Receiving
Station
AT&C Loss (in %age)
Zakura
Statement Showing Division Wise Feeder Wise Trajectory of T&D losses and AT&C Losses
NameoftheFee
der
-
7/28/2019 08.02.2013 as Per Divisonal Formate
32/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12
Habak F "2" 82.20 77.37 86.93 67.92 68.98 70.60 23.10 78.11 72.41 74.25
Habak F "3" 81.31 89.92 92.96 79.55 74.33 82.33 69.24 82.59 80.67 81.25
Habak F "5"91.39 86.37 91.01 76.28 83.03 65.63
73.08 80.69 79.87 77.83
Hazratbal F "1"98.70 19.10 99.18 -136.78 81.78 92.80 -158.88 99.65 -136.31 99.69
Hazratbal F "2" 74.35 -39.72 91.68 -1.15 -54.35 24.80 55.60 79.41 -70.26 55.45
Hazratbal F "3"87.13 82.07 91.32 72.09 72.39 70.36
76.50 69.56 62.14 79.82
Kathidar waza F "1" 96.17 87.66 83.79 62.88 74.49 67.54 78.89 83.20 81.48 82.38
Kathidar waza F "2"94.80 91.78 97.50 81.82 81.46 82.83
75.33 90.18 85.40 76.74
Kathidar waza F "3" 99.60 35.71 100.00 -117.93 -411.70 -469.24 98.38 -167.31 -27.29 48.25
Kathidar waza F "5" 95.76 93.69 99.63 86.44 92.39 92.39 88.45 93.97 86.36 80.36
Rainawari F "1" 95.43 89.24 100.00 -170.94 88.15 91.46 99.86 -484.71 36.14 -87.09
Rainawari F "2" 91.76 94.54 99.40 84.98 89.53 88.95 89.87 88.28 89.44 80.31
Rainawari F "3" 92.27 89.16 99.18 80.16 84.39 84.70 69.88 89.12 89.08 86.56
Rainawari F "4" 94.26 91.42 98.34 79.57 85.47 88.39 90.62 91.97 89.00 90.31
NameofSubdivision
Divi
sion Name of
the
ReceivingStation
AT&C Loss (in %age)
Rainawari
Nameoft
heFeeder
-
7/28/2019 08.02.2013 as Per Divisonal Formate
33/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12
Fateh Kadal F1 87.56
84.10
90.23 59.42
73.78 75.20
76.67 82.88 74.08 80.03
Fateh Kadal F4 86.6283.46
90.13 61.3971.92 75.25
76.79 78.06 73.61 74.84
Fateh Kadal F5 69.71
55.67
100.00 -138.18
100.00 -230.80
100.00 100.00 11.75 -133.49
Khayam F2 87.00
83.22
90.27 49.95
72.86 81.37
82.73 85.30 74.29 81.12
K.K.moulla
AT&C Loss (in %age)
Nameoft
heFeeder
NameofSubdivision
Division Name of
the
ReceivingStation
-
7/28/2019 08.02.2013 as Per Divisonal Formate
34/35
Base line
Data (FY
2011-12
ending
March
2012)
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12
ellahi Bagh EB-F1 77.70 77.70 75.60 53.16 53.70 56.11 55.32 74.44 71.25 79.22Owantabawan OB-F2 90.81 90.81 90.57 80.23 84.23 85.04 74.61 83.85 75.80 79.95Owantabawan OB-F1 81.45 81.45 79.51 76.82 70.82 73.51 74.79 82.41 76.11 84.23Bagwanpora BP-F2 73.73 73.73 76.49 66.93 54.50 55.58 45.51 79.51 44.60 67.48Soura Soura SR-F5 61.49 61.49 75.72 57.98 46.78 48.51 57.85 68.80 64.35 63.59
Soura Soura SR-F3 66.17 66.17 65.57 65.13 48.47 40.49 38.84 69.82 59.37 69.14BAMK
-
F1 33.78 33.78 33.78 -37.61 57.91 55.35 9.01 -12.07 43.13 31.89
BAMKBAMK-
F6 88.25 95.87 52.17 97.09 86.42 94.62 88.53 69.00 61.05 71.81
Soura Soura SR-F1 81.54 81.54 84.32 78.18 71.98 73.53 74.39 87.82 80.94 87.52Soura Soura SR-F2 41.24 41.24 62.65 32.66 11.56 30.38 21.76 83.36 57.53 69.70Soura Soura SR-F4 82.18 82.18 86.23 79.43 73.33 70.04 76.57 88.85 82.10 85.15ellahi Bagh EB-F2 85.55 85.55 83.13 66.26 72.82 74.30 72.32 83.19 84.63 84.29Bagwanpora BP-F1 76.62 76.62 78.52 71.33 61.75 57.88 61.23 34.91 71.27 76.48Bagwanpora BP-F3 79.61 85.17 88.37 79.17 71.75 75.76 73.87 89.61 74.66 81.10mughal masjid MM-F1 67.35 82.45 85.07 76.81 62.00 64.02 63.76 85.97 75.90 70.87
mughal masjid MM-F3 83.93 85.20 90.89 75.32 77.21 75.99 69.92 85.65 76.97 83.45Zoonimar ZN-F1 82.63 82.63 83.07 81.62 64.92 77.44 64.62 80.22 72.20 80.61
BAMK F2 84.67 90.90 89.59 89.48 76.91 86.96 73.94 84.19 67.01 77.39
BAMK F3 80.75 84.42 88.57 76.22 71.59 79.95 74.75 84.15 81.81 85.20
BAMK F4 79.09 79.29 82.31 67.09 65.74 73.34 73.25 82.18 75.14 77.40lal Bazar LB-F1 68.99 69.07 68.01 62.14 55.73 57.54 52.56 75.20 62.51 69.76lal Bazar LB-F2 62.91 70.59 73.78 62.76 55.77 52.70 54.74 79.93 75.50 78.22lal Bazar LB-F3 71.33 71.70 80.40 71.69 63.18 55.90 57.95 80.06 78.8995 70.1823
AT&C Loss (in %age)
Hawal
Nameoft
heFeeder
NameofS
ubdivision
Division Name of
the
ReceivingStation
-
7/28/2019 08.02.2013 as Per Divisonal Formate
35/35
1 1013 28 2.76 21 2.07 14 1.38 23 2.27 21.00 2.07 30 2.96 29 2.86 23 2.27 52 5.13 14 1.38
TOTAL
s 28 2.76 21 2.073 14 1.382 23 2.27 21 2.0731 30 2.96 29 2.8628 23 2.27 52 5.133 14 1.38
No.
ofTransformersDamagedinJan
2013
%agedamage
Division Wise Distribution Transformer Damage Rate from April 2012 to January 2013
TotalNo.
OfTransforme
rs
No.
ofTransformersDamaged
inApril
2012
%agedamage
No.
ofTransformersDamag
edin
December2013
%agedamage
No.
ofTransformersDamagedinJuly
2012
No.
ofTransformersDamag
edin
NOvember2013
Electric Division -IV Khanyar
Executive Engineer
%agedamage
No.
ofTransformersDamagedinAugust
2012
No.
ofTransformersDamagedinoctober
2013
%agedamage
No.
ofTransformersDamaged
inJune
2012
%agedamage
S.N
O
%agedamage
No.
ofTransformersDamaged
inMay
2012
%agedamage
%agedamage
%agedamage
No.
ofTransformersDamagedinSep2013
top related