(07)004 level c+ ga floor plan - the university of …/file/floor_cplus.pdf · the church studio...

Post on 18-Sep-2018

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Level C+ GA Floor Plan

Level C+ G

A Floor Plan

UNIVERSITY OF SHEFFIELD

job no (category) dwg no revision

FACULTY OF ENGINEERINGGRADUATE SCHOOLSHEFFIELD

This drawing is © Bond Bryan Architects Ltd. If in doubt ASK. Drawingmeasurements shall not be obtained by scaling. Verify all dimensionsprior to construction. Immediately report any discrepancies on thisdrawing to Architect. This drawing shall be read in conjunction withassociated specifications and related consultant's documents.

the church studio springvale road sheffield S10 1LP

+44 (0)114 266 2040+44 (0)114 268 7021

TF

E info@bondbryan.co.ukW www.bondbryan.com

11-003

11-003

(07)004 (07)004

scale date drawn checked

revisions

notesD

ESIGN

D

TD

C

- - -

--

--

designtenderconstruction

PLPR

planningpreliminaryrecord

PT pre-tender

5 6 7 8

5859

6061

5960

6162

63

41 42 43 44 45 46 47

12

34

56

1 2

1 2 3 4 5 6

12

34

56

1234567

12

34

56 1

23

45

6

1 2 3 4

6263

6465

6667

6869

7071

7273

7475

7677

7879

4849505152535455565758596061

62 63 64 65 66 67 68

1,390 7,250 2,895 4,670 1,600 3,2375

2,76

56,

320

6,00

06,

640

6,32

01,

730

4,59

55,

6875

2,02

5

CHEM ENG E

Dis

able

d R

efug

e14

00 x

900

Disabled Refuge1400 x 900

NoteExisting window openingsto be blocked up

2640 x 3390 Clear Shaft1700 x 2350 Lift Car2000KG max load

1300mm Door Width

Fume Cupboard Fume Cupboard

Fum

e C

upbo

ard

Fum

e C

upbo

ard

Resin Table

Weighing

Bench

Pla

sma

Pol

ymer

isat

ion

Furnace

Pre-P

regM

achine

Curing

Oven 1

Con

ditio

ning

Ove

n O

P30

Dia

mon

dW

heel

Cut

ting

2no.

Vac

uum

pum

p ov

ens

Cur

ing

Ove

n 2

Conditioning

Oven 3

ConditioningOven 5

Che

st F

reez

er 1

DMARheometer

Rheom

eterC

ompressor

Fridge1

Fridge2

MicroscopeFibreSpectrometer PCB/Exposure

Machine

Chem

istryP

rep

ElectronicsPCB/EtchingMachine

Glass Oven

Chem

icalS

tore

NDT &Fractography

SmallLloyd

Large Lloyd

Che

st F

reez

er 4

Ther

mal

Con

trol

Cab

inet

VacuumPumpOven 3

Oven 7ThermoplasticProcessing

Cutting TrolleyLaminating/bagging Trolley

Laminating/bagging Trolley

AirCompressor

AutoclaveNote; weighs 1.5tnsufficent structurerequired

Small CreepMachine

CreepMachine

CreepMachine

Small CreepMachine

Aut

ocla

veC

onsu

mab

les

Hot Press

Hot Press

Che

st F

reez

er 2

Fum

e C

upbo

ard

Che

st F

reez

er 3

C Mezzanine Lab

OfficeOfficeOfficeOfficeOfficeOfficeOffice

Heavy Structures Lab(double height space)

Larg

e P

lotte

r

TW

waterfountain

Fum

e C

upbo

ard

WHB &eye washDrench

Shower

Position of Temporary External Fire EscapeDuring Construction Serving Floors D, E & F

N E

W C

A S

T L

E

S T

R E

E T

B R O A D L A N E

WHB

Fire rated roller shutterconnected to fire alarmto lift door

Stair 2RDS N20-19A: 26 m2C+02

Stair 1 LobbyRDS N20-22A: 31 m2C+21

Lift

Ele

c R

iser

RD

S N

21-1

8A

: 3 m

2C

+22

Female ToiletRDS N19b-12A: 11 m2C+24

Access WC incl BidetRDS N19b-11A: 3 m2C+25

Stair 2 LobbyRDS N20-18A: 18 m2C+03

PGR/PDRARDS N12-12A: 31 m2Occupancy: 7C+01

AD OfficeRDS N12-13A: 12 m2Occupancy: 1C+04

AD OfficeRDS N12-14A: 10 m2Occupancy: 1C+05

Sto

re/F

utur

e R

iser

RD

S N

14-1

1A

: 4 m

2C

+06

Mech RiserRDS N21-15A: 8 m2C+07

Research Lab 3 - WetRDS B1-03A: 217 m2Occupancy: 48C+09

Prep RoomRDS N11-07A: 23 m2Occupancy: 2C+11

PGR/PDRARDS N12-18A: 64 m2Occupancy: 14C+14

AD OfficeRDS N12-15A: 12 m2Occupancy: 1C+30

AD OfficeRDS N12-16A: 10 m2Occupancy: 1C+31

CirculationRDS N20-21A: 60 m2C+32

Heating RiserRDS N21-19A: 2 m2C+15

Stair 1RDS N20-23A: 34 m2C+23

Smoke ShaftC+17

OfficeRDS N12-19A: 8 m2C+20

CICSRDS A3-01A: 106 m2Occupancy: 46C+19

Mech RiserRDS N21-16A: 8 m2C+12

CICS RiserRDS N21-17C+29

StoreRDS N14-12A: 2 m2C+16

PGR/PDRARDS N12-17A: 58 m2Occupancy: 13C+13

CleanersRDS N19b-10A: 3 m2C+26

Instrument RoomRDS N11-05A: 23 m2Occupancy: 2C+08

Break OutRDS A2-06A: 10 m2Occupancy: 5C+10

CirculationRDS N20-24A: 32 m2C+18

Mech RiserRDS N21-36C+28

Male ToiletRDS N19b-26A: 9 m2C+27

A B DC CaAa Ab

7

6

5

4

3

2

1

1a

8

5a

TWTW

Wall Type 1 - 140mm blockwork, plaster finisheither side

Wall Type 2 - 140mm blockwork, plaster finishto one side, fairface/painted finish to one side

Wall Type 3 - 140mm blockwork, fairface/paintedfinish to either side

Wall Type 4 - 250mm concrete shear wall,Fermacell metal frame drylining to either side

Wall Type 5 - 250mm concrete shear wall,Fermacell metal frame drylining to one side,fairface/painted to one side

Wall Type 5 - 250mm concrete shear wall,fairface/painted to either side

Wall Type 6 - Fermacell metal stud partition

Existing wall/structure

Internal Partition Legend

15.04.11

15.04.11SP KR

KR

Revised in accordance withend user comments. Structureupdated in accordance withlatest SE information

D0

SP

19.04.11SP KRRevised in accordance withend user comments.

D1

26.04.11SP SMRevised in accordance withend user comments.

D2

28.04.11SP SMRevised in accordance withend user comments.

D3

06.05.11SP KRRevised in accordance withend user comments. Stair 1reconfigured. RDS Numbers added.

D4

09.05.11SP KRStair 1 reconfigured to suitjunction detail to Broad LaneBuilding

D5

13.05.11CC KRDoor to Research Lab 3repositioned and glazed screenadded, windows added to stair 1.

D6

1:100 & A0

24.05.11SP KRRevised in accordance withlatest end user comments.Planning alterations undertaken.

D7

31.05.11SP KRMissing RDS numbers added,occupancy numbers updated

D8

13

03.06.11SP KRStage D IssueToilet Cores revised to providemale & female facilities. Clientcomments incorporated. Sitecontext shown.

D9

21.06.11SP KRFurniture shown to CICs A3-01.Male toilet N19b-26 rearranged

D10

12.07.11SP KRExternal facades amended tosuit vent strategy. RiserN21-15 increased.

D11

22.07.11SP KRExisting building surveyinformation integrated ontoplan. External wall & gridposition adjusted.

D12

Existing connecting adjacent building layouts based on thirdparty survey information dated May 2011 supplied by METSurveys Ltd on behalf of Sheffield University. The accuracyof existing building layouts cannot be verified by Bond BryanArchitects Ltd. Site dimensions to be checked prior tocommencement of work.

16.08.11SP KRPlanning IssueLift shaft size adjusted. Roomsnumbers added.

D13

top related