(07)004 level c+ ga floor plan - the university of …/file/floor_cplus.pdf · the church studio...
TRANSCRIPT
Level C+ GA Floor Plan
Level C+ G
A Floor Plan
UNIVERSITY OF SHEFFIELD
job no (category) dwg no revision
FACULTY OF ENGINEERINGGRADUATE SCHOOLSHEFFIELD
This drawing is © Bond Bryan Architects Ltd. If in doubt ASK. Drawingmeasurements shall not be obtained by scaling. Verify all dimensionsprior to construction. Immediately report any discrepancies on thisdrawing to Architect. This drawing shall be read in conjunction withassociated specifications and related consultant's documents.
the church studio springvale road sheffield S10 1LP
+44 (0)114 266 2040+44 (0)114 268 7021
TF
E [email protected] www.bondbryan.com
11-003
11-003
(07)004 (07)004
scale date drawn checked
revisions
notesD
ESIGN
D
TD
C
- - -
--
--
designtenderconstruction
PLPR
planningpreliminaryrecord
PT pre-tender
5 6 7 8
5859
6061
5960
6162
63
41 42 43 44 45 46 47
12
34
56
1 2
1 2 3 4 5 6
12
34
56
1234567
12
34
56 1
23
45
6
1 2 3 4
6263
6465
6667
6869
7071
7273
7475
7677
7879
4849505152535455565758596061
62 63 64 65 66 67 68
1,390 7,250 2,895 4,670 1,600 3,2375
2,76
56,
320
6,00
06,
640
6,32
01,
730
4,59
55,
6875
2,02
5
CHEM ENG E
Dis
able
d R
efug
e14
00 x
900
Disabled Refuge1400 x 900
NoteExisting window openingsto be blocked up
2640 x 3390 Clear Shaft1700 x 2350 Lift Car2000KG max load
1300mm Door Width
Fume Cupboard Fume Cupboard
Fum
e C
upbo
ard
Fum
e C
upbo
ard
Resin Table
Weighing
Bench
Pla
sma
Pol
ymer
isat
ion
Furnace
Pre-P
regM
achine
Curing
Oven 1
Con
ditio
ning
Ove
n O
P30
Dia
mon
dW
heel
Cut
ting
2no.
Vac
uum
pum
p ov
ens
Cur
ing
Ove
n 2
Conditioning
Oven 3
ConditioningOven 5
Che
st F
reez
er 1
DMARheometer
Rheom
eterC
ompressor
Fridge1
Fridge2
MicroscopeFibreSpectrometer PCB/Exposure
Machine
Chem
istryP
rep
ElectronicsPCB/EtchingMachine
Glass Oven
Chem
icalS
tore
NDT &Fractography
SmallLloyd
Large Lloyd
Che
st F
reez
er 4
Ther
mal
Con
trol
Cab
inet
VacuumPumpOven 3
Oven 7ThermoplasticProcessing
Cutting TrolleyLaminating/bagging Trolley
Laminating/bagging Trolley
AirCompressor
AutoclaveNote; weighs 1.5tnsufficent structurerequired
Small CreepMachine
CreepMachine
CreepMachine
Small CreepMachine
Aut
ocla
veC
onsu
mab
les
Hot Press
Hot Press
Che
st F
reez
er 2
Fum
e C
upbo
ard
Che
st F
reez
er 3
C Mezzanine Lab
OfficeOfficeOfficeOfficeOfficeOfficeOffice
Heavy Structures Lab(double height space)
Larg
e P
lotte
r
TW
waterfountain
Fum
e C
upbo
ard
WHB &eye washDrench
Shower
Position of Temporary External Fire EscapeDuring Construction Serving Floors D, E & F
N E
W C
A S
T L
E
S T
R E
E T
B R O A D L A N E
WHB
Fire rated roller shutterconnected to fire alarmto lift door
Stair 2RDS N20-19A: 26 m2C+02
Stair 1 LobbyRDS N20-22A: 31 m2C+21
Lift
Ele
c R
iser
RD
S N
21-1
8A
: 3 m
2C
+22
Female ToiletRDS N19b-12A: 11 m2C+24
Access WC incl BidetRDS N19b-11A: 3 m2C+25
Stair 2 LobbyRDS N20-18A: 18 m2C+03
PGR/PDRARDS N12-12A: 31 m2Occupancy: 7C+01
AD OfficeRDS N12-13A: 12 m2Occupancy: 1C+04
AD OfficeRDS N12-14A: 10 m2Occupancy: 1C+05
Sto
re/F
utur
e R
iser
RD
S N
14-1
1A
: 4 m
2C
+06
Mech RiserRDS N21-15A: 8 m2C+07
Research Lab 3 - WetRDS B1-03A: 217 m2Occupancy: 48C+09
Prep RoomRDS N11-07A: 23 m2Occupancy: 2C+11
PGR/PDRARDS N12-18A: 64 m2Occupancy: 14C+14
AD OfficeRDS N12-15A: 12 m2Occupancy: 1C+30
AD OfficeRDS N12-16A: 10 m2Occupancy: 1C+31
CirculationRDS N20-21A: 60 m2C+32
Heating RiserRDS N21-19A: 2 m2C+15
Stair 1RDS N20-23A: 34 m2C+23
Smoke ShaftC+17
OfficeRDS N12-19A: 8 m2C+20
CICSRDS A3-01A: 106 m2Occupancy: 46C+19
Mech RiserRDS N21-16A: 8 m2C+12
CICS RiserRDS N21-17C+29
StoreRDS N14-12A: 2 m2C+16
PGR/PDRARDS N12-17A: 58 m2Occupancy: 13C+13
CleanersRDS N19b-10A: 3 m2C+26
Instrument RoomRDS N11-05A: 23 m2Occupancy: 2C+08
Break OutRDS A2-06A: 10 m2Occupancy: 5C+10
CirculationRDS N20-24A: 32 m2C+18
Mech RiserRDS N21-36C+28
Male ToiletRDS N19b-26A: 9 m2C+27
A B DC CaAa Ab
7
6
5
4
3
2
1
1a
8
5a
TWTW
Wall Type 1 - 140mm blockwork, plaster finisheither side
Wall Type 2 - 140mm blockwork, plaster finishto one side, fairface/painted finish to one side
Wall Type 3 - 140mm blockwork, fairface/paintedfinish to either side
Wall Type 4 - 250mm concrete shear wall,Fermacell metal frame drylining to either side
Wall Type 5 - 250mm concrete shear wall,Fermacell metal frame drylining to one side,fairface/painted to one side
Wall Type 5 - 250mm concrete shear wall,fairface/painted to either side
Wall Type 6 - Fermacell metal stud partition
Existing wall/structure
Internal Partition Legend
15.04.11
15.04.11SP KR
KR
Revised in accordance withend user comments. Structureupdated in accordance withlatest SE information
D0
SP
19.04.11SP KRRevised in accordance withend user comments.
D1
26.04.11SP SMRevised in accordance withend user comments.
D2
28.04.11SP SMRevised in accordance withend user comments.
D3
06.05.11SP KRRevised in accordance withend user comments. Stair 1reconfigured. RDS Numbers added.
D4
09.05.11SP KRStair 1 reconfigured to suitjunction detail to Broad LaneBuilding
D5
13.05.11CC KRDoor to Research Lab 3repositioned and glazed screenadded, windows added to stair 1.
D6
1:100 & A0
24.05.11SP KRRevised in accordance withlatest end user comments.Planning alterations undertaken.
D7
31.05.11SP KRMissing RDS numbers added,occupancy numbers updated
D8
13
03.06.11SP KRStage D IssueToilet Cores revised to providemale & female facilities. Clientcomments incorporated. Sitecontext shown.
D9
21.06.11SP KRFurniture shown to CICs A3-01.Male toilet N19b-26 rearranged
D10
12.07.11SP KRExternal facades amended tosuit vent strategy. RiserN21-15 increased.
D11
22.07.11SP KRExisting building surveyinformation integrated ontoplan. External wall & gridposition adjusted.
D12
Existing connecting adjacent building layouts based on thirdparty survey information dated May 2011 supplied by METSurveys Ltd on behalf of Sheffield University. The accuracyof existing building layouts cannot be verified by Bond BryanArchitects Ltd. Site dimensions to be checked prior tocommencement of work.
16.08.11SP KRPlanning IssueLift shaft size adjusted. Roomsnumbers added.
D13