am transition approach
TRANSCRIPT
-
8/7/2019 AM Transition Approach
1/16
Transition Approach
Application Management Services
-
8/7/2019 AM Transition Approach
2/16
Transition ApproachApplication Management Services
TABLE OF CONTENTS
I. INTRODUCTION.......................................................................................................................................... 2
II. TRANSITION MODEL............................................................................................................................... 2
III. TYPICAL PLAN......................................................................................................................................... 7
IV. CRITICAL SUCCESS FACTORS..........................................................................................................11
V. APPENDIX -SAMPLE TEMPLATES USED DURING TRANSITION PHASE...............................13
A. STEADY STATE READINESS MATRIX.........................................................................................................13B. INTERFACE DETAILS MATRIX..................................................................................................................14C. FORM DETAILS.....................................................................................................................................14D. INTERFACE FMEA...............................................................................................................................14
-
8/7/2019 AM Transition Approach
3/16
Transition ApproachApplication Management Services
I. IntroductionUnisys has developed a standard methodology for implementing andmanaging the point services comprising our global portfolio weutilize our powerful 3 Dimensional Visual Enterprise (3D-VE)methodology... The differentiator is enterprise visibilityor linkingholistically across all dimensions of an enterprise. 3D-VEs poweris traceability. This will allow clients the ability to see the cascadingeffects that change has across all layers of a business. This visibility
turns change from an adversary into a competitive advantageandlessens risk, empowering clients to transform the way they dobusiness.
Unisys will use the metrics based tools set and methodology totransition Application Managementservices to Unisys that are eitherprovided by current employees or other service providers. Some ofthe benefits of the approach are:
1. Organizational visibility using traceability. (Throughcause and effect analysis)
2. Intellectual property as a competitive differentiator (Bymodeling business knowledge)
3. Impact analysis (The ability to understand the impactthat change has on both business processes and ITapplications)
4. Redundancy elimination (Reducing costs andstreamlining processes and applications by eliminatingredundant functions)
-
8/7/2019 AM Transition Approach
4/16
-
8/7/2019 AM Transition Approach
5/16
Transition ApproachApplication Management Services
to whether they can be left as-is, consolidate with anotherredundant application, migrate to standard or current
technologies using the migration model, retire theapplication, move the application to offshore or replacewith a new application.
10
Develop high-level implementation plan.
11
Identify service levels and finalize.
12
Consolidate and summarize the portfolio analysis results.
13
Review with project stakeholders.
Application Analysis
The Application Analysis phase follows a three-step process fortransitioning support
# Process Description
1 CompleteApplicationAssessment
This consists of analyzing all non-infrastructure aspects of theapplication, including functionality,programming standards, QAprocesses, organizational dynamicsand others.
2 CompleteInfrastructureAssessment
This consists of analyzing allinfrastructure aspects includingnetwork, hosting, system software,
hardware, multiple environments andothers.
3 Define Transitionexecution andSOW
Provide a detailed plan for thetransitioning of the application to theoffshore team and the Statement of
-
8/7/2019 AM Transition Approach
6/16
Transition ApproachApplication Management Services
Introduction Phase
The purpose of the Introduction Phase is to give the Unisys team a
basic understanding of the application to be supported and theinfrastructure and communications requirements to move the supportoffshore. This phase also optionally includes tasks to address anydeficiencies in the current documentation, regression test bed,maintenance processes, etc. so that the maintenance can beeffectively transitioned offshore. The major activities of this phaseinclude:
# Activities1 Study the current applications and production environment
2 Understand the design, data structures and source codefrom a technical perspective
-
8/7/2019 AM Transition Approach
7/16
Transition ApproachApplication Management Services
The main activities in this phase are as follows:
# Activities1 Client staff to assign and prioritize support activities to
Unisys resources
2 Execute the support activities
3 Ensure project deliverables meet agreed-uponrequirements
4 Interact with client staff to resolve issues
5 Refine the support and maintenance process
Primary Contact
After obtaining hands-on experience in supporting the application,Unisys will take responsibility for complete support andmaintenance activities from the client location. Members of theexisting support team will continue to participate in supporting theapplication, but primarily from a coaching and review perspective.This activity would also typically include performing some
maintenance work from offshore to test out the offshoreinfrastructure and communications set-up.
The major activities in this phase are:
# Activities
1 Unisys project manager to assign and prioritize supportactivities to Unisys staff
2 Execute the support activities
3 Ensure project deliverables meet agreed-uponrequirements
4 Interface with client staff to resolve issues
5 Perform representative support tasks from offshore
-
8/7/2019 AM Transition Approach
8/16
Transition ApproachApplication Management Services
Steady State Activities
After the successful knowledge transfer from the customer staff toUnisys staff, the support and maintenance activities are started fromoffshore with the environment that is setup separately or throughconnectivity to the customers environment through secureconnectivity or communication links. The following activities arecarried out during the Steady State phase:
# Activities
1 Raise a Service request (ticket) in the problem management tool.
2 Understand the Ticket and collect the relevant diagnostic dataand steps to replicate error
3 Assign the ticket to the appropriate agent
4 Proactive customer follow-ups thru ticket closeout
5 Trouble ticket is routed to the Level 2 staff by the level 1 supportteam
6 The Level 2 staff will identify the severity of the request as perthe classification
7 Perform Real-time troubleshooting and provide resolution
8 Identify workaround for the issues reported9 Provide feedback to user with proper usage information (where
required)
10
If a code change has to be done, then the request is delegated tothe Level 3 staff.
11
The level 3 staff includes Software engineers who will go throughthe SDLC lifecycle to implement the changes.
12
The requests are serviced as per the SLAs; the users are informedas soon as their issue is resolved.
13
Generate status reports that have been discussed and agreedwith the customer.
14
Review the project progress and take corrective actions atperiodic intervals.
-
8/7/2019 AM Transition Approach
9/16
Transition ApproachApplication Management Services
A. Transition Plan for ApplicationsBased upon its past experiences of running support engagementsUnisys has identified certain activities, which needs to be completedduring transition of an application to support. These are outlinedbelow.
Introduction Phase
During the introduction phase following is the information, which iscollected by the transition team:
# Category Information
-
8/7/2019 AM Transition Approach
10/16
Transition ApproachApplication Management Services
with which UOP applications interact
4 People
knowledge,through:
Knowing about various stakeholders
such as End Users and IT Team andtheir roles and responsibilities.Process to be used for communicationwith various stakeholders.Other stakeholders and their roles andresponsibilitiesCritical Process knowledge through:- Understanding what are the businesscritical processes for the site, and
escalation path in case an issue cropsup in one of these.- What are the current issue resolutionmechanisms in place for these issues?Deliverables of Introduction phasewould be inventory on all knowledgethat Unisys collects during thesubsequent phases
Hands-On PhaseDuring the Hands-on phase Unisys transition team goes to each andevery individual item identified in the introduction phase, andstudies them in detail to understand the building blocks ofapplications to be supported. Clear deliverables have been identifiedfor each and every phase and the client evaluates effectiveness ofeach of these deliverables.
Item Deliverables Means of vetting the
effectiveness of
d li bl
-
8/7/2019 AM Transition Approach
11/16
Transition ApproachApplication Management Services
Item Deliverables Means of vetting the
effectiveness of
deliverables
Thirdparty/Clientcontactprocess
details matrix to theclient and get thesign off from theclient for theircorrectness.
Enhancement Study
Enhancement Knowledgespreadsheet
Transition team tosubmitenhancementknowledgespreadsheet and getthem signed off fromthe client for theireffectiveness andaccuracy.
Forms Forms Details Matrix Transition team tosubmit the formsdetails matrix to theclient and get thesign off from theclient for theircorrectness.
Client:
Roles andResponsibilities
Roles and responsibility
Matrix
Transition team to
submit roles andresponsibility matrixto the client and getit signed off for its
-
8/7/2019 AM Transition Approach
12/16
Transition ApproachApplication Management Services
in a lot of problem solving. This would be a period where Unisyssupport team would be testing waters in terms of their
effectiveness in resolving support issues. This phase will act as a testcase for the transition documentation created in the Hands-On phaseas well as give the applications support team critical customer facingexperience. This phase would also identify pointers in terms of mid-course corrections to be undertaken if any.
During this phase Unisys transition team will also understand theprocesses/applications, which have not been mapped completely, or
are currently work in progress. Unisys support team will understandthe roadmap of these processes/applications to production andtransition to support.
Ownership Phase
At the end of the Primary Contact Phase, Unisys would assume fullresponsibility for support of the applications in scope as per thepredetermined SLAs. Application Support team will ensure that all
the documentation generated during the transition study is keptcurrent and up to date.
During the entire transition process Unisys measures the progress oftransition using Steady State Readiness Matrix under Appendix.Please also refer to some artifact samples provided for as anillustration under Appendix viz.:
Interface Details Matrix (Please referInterface Details
Matrix)Form Details (Please referForm Details)
Interface Failure Mode Effects Analysis (Please referI t f FMEA)
-
8/7/2019 AM Transition Approach
13/16
Transition ApproachApplication Management Services
# Domain Description
7 Project Management Clear Points of Contact Joint
Governance Model in place8 Project Management Effective Co-ordination between on-
site/offshore/near shore and recordingof changes
9 Decision makinginformation
Decision making metrics
10
Decision makinginformation
Decision to operational transparency Predefined review milestones,
reports & acceptance criteria
11
Decision makinginformation
Proactive Decision making Service standardization with
associated effort, costs,dependency & constraints
12
Decision makinginformation
Management reports Health, tolerances and
escalation1
3
Decision making
information
Early Client involvement
Forecast planning Milestone based reviews Issue tracking Escalation Procedure
-
8/7/2019 AM Transition Approach
14/16
V. Appendix -Sample Templates Used During Transition Phase
A. Steady State Readiness Matrix
13
Steady StateReadiness
XXXXX DeploymentDate:
Status:Green: Above 90%,Yellow- 90%-80%,Red- Less than 80%, White - Yet to start Summary
StatusStatusStatusStatus Green 403 70%30-Mar6-Apr13-Apr20-Apr CompleteTotal Yellow 157 27%
Red 19 3%
Business ProcessMeasured based on completion status of transition-
in tasks for process areas (total 65) 67% 70% 70% 70% 70% 403 579
about 4 % of theprocess/ BPP arenot completelyfinalised anddocumented
the yellow and green canbe supported, but yellowmeans the process is notdocumented or we havenot been able to loacte
any documents
59 tcodes/processwere removed from
scope White 0 0%
Interfaces
Measured based on completion status ofinterfacetransition-in tasks (inclusive of Interface FMEAs,error handling process and details matrix)80% 80% 80% 80% 100% 20 20 Total 579 100%
Enhancements
Measured based on completion status of study ofenhancements
and clarification for anyissues/questions. 74% 74% 74% 74% 74% 104 1 40
36 enhancementsdont have
documentation
Support processMeasured as completion status of support manual 0%
Power Users &End Users
Users familiarity on executing various transactionsin SAP related to their business function. Thesemetrics are based on the End User Assessment
Report publi shed by Honeywel l. 87% 87% 87%Finalized Access
LevelsAccess levels/restrictions as dictated by exportcontrol and seggregation of duties (SOD) 0%
Ticket resolutionMeasured as % of tickets closed (# tickets
closed/Total # of tickets) 74 81% 378 468
Sev 1ticket resolution
Measured as % of sev 1 tickets closed (# sev 1tickets closed/Total # of Sev-1tickets)
Indicator of the stability of the system andreadiness for steady state support 83% 83% 25 30
12-May-05
Support Readiness
Process Readiness
System Readiness
Actions Required CommentsStatus
5/2Definition Impact
Tasks
-
8/7/2019 AM Transition Approach
15/16
B. Interface Details Matrix
Interfacenumber
DescriptionApplication
AreaPartnerSystem
ExportControlData?
Interfaceerror
severitylevel
InterfaceCritical
Timings/Days
24X7supportrequired?
After Hourscontact
(business)
After hourscontact (3rd
Party)
PartnerSystemticketingprocess
Source Direction Destination FrequencySAP
ProcessingSchedule
SAP BusinessAnalyst
INF300XX SAP to XYZ Today'sShipments +2weeks
(PSSHIP)
OM MasterData
No 1 Mon - Fri. Y ABC000-111-5782. N/A N/A SAP Outbound WSC Daily/Nightly XXXXXX
INF300YY
ABC to SAP - Additonal
Material Master ACDd
(Many to Many Cage Code)
SC MM ODS No 2 Mon - Fri. Y
ABC
000-111-5782. N/A N/A MM ODS Inbound SAPNightly batch
processingYYYYY
INF300ZZ
Material Master Main
Update Interface to SAP
(including Quality)
SC MM ODS No 2 Mon - Fri. Y
ABC
000-111-5782. N/A N/A MM ODS Inbound SAPNightly batch
processingZZZZZZ
INF300AAABC Interface Prgram to
update Rev. LevelSC MM ODS No 2 Mon - Fri. Y
ABC
000-111-0712N/A N/A MM ODS Inbound SAP
Nightly batch
processingAAAAAA
INF300BBSAP Material Master to
ABCSC MM ODS No 2 Mon - Fri. Y
ABC
000-111-0712N/A N/A SAP Inbound MMODS
Nightly batch
processingBBBBBB
C. Form Details
Form Print Program Sapscript Optio DCL File Name Output Type SAP Transaction
Purchase Order YSCR_FRMxxxx3 YSC_FRMxxx03 Non Optio Form NEU ME22N
Invoice P1 YOMR_FRMxxxx2 YOM_FRMxxx02 Non Optio Form ZXYZ VF02
Packing List Tag XXXXX
P1YOMR_FRMxxx26 YOM_FRMxxx26 Non Optio Form ZAWS VL02N / VL71
Production form
XXXXXXX P1YAFR_FRMxxxx039 FRMXXX1_rdui.dcl ZWEW IW32
Packing List P3 YOMR_FRMxxxx47 FRMXXX2_rdui.dcl ZPL2 VT02N / VT70
Pick List P3 YAFR_FRMxxxx031 FRMXXX3_rdui.dcl Z204 IW32 / IW3DWork Order BOM P3 YAFR_FRMxxxx043 FRMXXX4_rdui.dcl Z502 IW32 / IW3D
Master Bill of Lading P4 YAFR_FRMxxxx046 FRMXXX5_rdui.dcl ZF15 VT02N / VT70
AAAAAAAAA Labels P2 YOMR_FRMxxxx045 YOM_FRM00045 Non Optio Form ZS2K, ZS2L, ZS2M VL02N / VL71
D. Interface FMEA
14
-
8/7/2019 AM Transition Approach
16/16
INFXXXXX_XXXXXXX_OUTBOUND_YYYYYYYY_FMEAPrepared By: Mr. AAA BBB Partner Contact: XYZ AAA Partner System: Speck2K
Date: 1/31/2005 Business John Doe Middleware: EDIPower User: Direction: Outbound
Middleware Contact:
External Support:
Process Step/Input (What is
the process step/input?)
Potential
Failure Mode
(What can go
wrong with the
process
step/input?)
OUTPUTS
Potential
Failure Effects
(What is the impact on
the customer (output
variables) or internal
requirements?)
Potential
Causes
(What are the root
cause reasons for the
process step/input to
go wrong?) INPUTS
Existing Controls
(What are the existing
controls that prevent or
detect either the cause or
the FM prior to leaving the
process step?)
Preventive Actions
Recommended
(How to prevent the
occurrence of the
potential cause?)
Corrective Actions
Recommended
(How to identify and
resolve issue?)
Plans /
Responsibility
(What is the target
completion date
and who is
responsible?)
Change or create Invoice
through VF01,VF02 with o/p type
ZCIN Invoice is not
created/Change
d
Invoice is not Posted to
Partner System
O/p type (ZCIN ) not
maintained
Check whether o/p type is
maintained or not through
VV33
Monintor the o/p type
availability
Notify the Business
process owner and
maintain o/p type
throug VV31 with
the approval of BPO
SAP Help Desk
Change or create Invoice
through VF01,VF02 with o/p type
ZCINInvoice is not
created/Change
d
Invoice is not Posted to
Partner System
SAP Server
Unavailable Monitor data by help desk None
Notify the SAP
Request about SAP
server Unvailability SAP Help Desk
Change or create Invoice
through VF01,VF02 with o/p type
ZCINInvoice is not
created/Change
d
Invoice is not Posted to
Partner System Data Missing error
Monitored all the Fields of
Transaction
Monitored the
Transaction and
redefine the Process
Redefine the Data
and Run The
process again SAP Help Desk
15