alstom
TRANSCRIPT
Seminario InternacionalSoluciones 2006
Santiago de Cali, Colombia 2 y 3 de Noviembre de 2006
NovNoviiembembrere 20020066
Soluciones de Aire Limpioen la
Industria del Hierro y el Acero
Linda Ayala y Nelson Izquierdo
NovNoviemiembbrere 20020066
Environmental Control Systems
Air pollution control systems & products for power & industrial applications
A business driven by increasingly strict emissions regulations
Serving new plants & retrofitting existing plants
Our Business
Bringing you a World of Experience in Clean Air Solutions
Environmental Control Systems
Employs around 1000air pollution controlprofessionals
Located in 13 countriesaround the world
Dedicated R&D facilities
70 years experience inair pollution control
Our Organization
ALSTOMALSTOM EnvironmentalEnvironmental ControlControl SystemsSystems
1989 200019991922
DanecoItaly
1996
-- Long history in air pollution control Long history in air pollution control --
Origin and background:
ECS Corporate Headquarters + French Unit, Paris, France
Our Locations
Total: approx. 1000 employees
Knoxville
São Paulo
Kolkata
Sydney
Oslo Växjö
Helsinki
Milan
Moscow
Butzbach
Paris
Kobe
Beijing
ECS LAM Headquarters
Our Locations Latin America
Santiago
Caracas
BuenosAires
Bogotá
São Paulo
MexicoNew Office Locations
Industries we Serve
AluminiumCementGlassIron & SteelIndustrial Incineration PlantsNon-ferrousPulp & PaperPower
Iron & Steel at a Glance
Leading position worldwide as supplier of APC plants for the Iron & Steel Industry.
Over 30 years experience
More than 600 successful installations world wide
280 references for Electric Steel Shop / Mini Mill
320 references in Integrated Steel Plants
Technical excellence achieved by long experience and focused R&D efforts
Scope of Business - Air Pollution Control:
Electric Steel Shop / Mini Mills
Electric Arc Furnace (E.A.F.) - primary & secondary emissions
Argon Oxygen De-carbonisation (A.O.D.) converters -primary & secondary emissions
Ladle Furnace (L.F.) - primary & secondary emissions
Scope of Business - Noise Proofing System:
Dog-house enclosure for E.A.F.Elephant-house enclosure for E.A.F.
Scope of Business - Air Pollution Control:
Integrated Steel Plants
Sinter band (primary & secondary emissions)
Dedusting with Electrostatic precipitator or Fabric Filter
SO2 and dioxin control with NID (dry de-SOx)
Pelletising plants
Secondary ventilation for stock house
Secondary ventilation for converter and mixer hall
Coke pushing de-dusting
Lime kiln de-dusting
Blast Furnace cast house ventilation
Water-Cooled Hoods and Ducting
Post-combustion Chambers
Gas Coolers - forced-draft and natural-draft types
Hot Quenching Towers
Hoods for secondary emissions
Cyclone & spark-arrestors - axial and vertical types
Fabric Filters (FF) - pulse-jet and reverse-air types
Electrostatic Precipitators (ESP) - dry and wet types
Wet Scrubbers
Product Portfolio
In House technology:
Scope of Activities
Supply of complete plants
Supply of dedicated Products
Turn-key installations of dedicated Products
Modernisation and retrofit of existing installations
Equipment and system supply:
Scope of Activities
Engineering service for complete plants and for dedicated Products
Supervision service to erection, start-up and commissioning
Post start-up services (i.e. spare parts, technical assistance, etc.)
Services:
Iron & Steel - references
Project Process Contract
Aceralia - Gijon, Spain - 2 ESPs for sinter primary gases 06 / 2004Arcelor - Fos sur Mer, France - FDA for sinter primary gases 01 / 2004Mechel, Chelyabinsk, Russia - 4 ESPs for sinter primary gases 01 / 2004
Gerdau-Cosigua, Brazil - EAF primary and secondary gases 11 / 2003Gerdau-Sao Paolo, Brazil - EAF primary and secondary gases 11 / 2003Outokumpu-Tornio, Finland - EAF primary and secondary gases 06 / 2003
Rautaruukki-Raahe, Finland - BOF and mixer secondary ventilation 05 / 2003Concast-EASRCO, Egypt - EAF primary and secondary gases 03 / 2003
List of recent references:
Selected references
Arcelor DunkerqueFRANCE
Sinter band (Secondary)start up 2000
Rautaruukki RaaheFinland
Mixer hall secondary ventilationstart up 2004
Selected references
Henningsdorfer ElektrostahlwerkeGERMANY
EAF and LF (Primary & Secondary)start up 1992
Outokumpu Stainless TornioFinland
EAF (Primary & Secondary)LF (Primary)AOD (Primary & Secondary)
start up 2003
Acerinox SPAIN
EAF (Primary & Secondary)start up 1997
Elbe StahlwerkeGERMANY
EAF and LF (Primary & Secondary)start up 1992
Selected references
Selected references
ALPA (Riva Group)FRANCE
EAF (Primary & Secondary)start up 2000
Gerdau PiratiniBRAZIL
EAF and LF (Primary & Secondary)start up 1999
Linda Ayala y Nelson Izquierdo
NovNoviemiembbrere 20062006
Integrated Steel Plants at a Glance
More than 300 references globally
Combination of air pollution control and process know-how
Leading supplier for Sinter Band air pollution control
No. 1 supplier of ESPs for sinter band
Breakthrough technology for gas cleaning using dry FGD (SOx , HCl and dioxin removal)
Technical excellence achieved by long experience and focused R&D efforts
-- Integrated Steel Plants Integrated Steel Plants --
Scope of Business - Air Pollution Control:
Integrated Steel Plants
Sinter band - primary & secondary emissions
Dedusting with Electrostatic precipitator or Fabric Filter
SO2 and dioxin removal with NID/FDA
Pelletising plants
Secondary ventilation for stock house
Secondary ventilation for converter and mixer hall
Blast Furnace cast house ventilation
Coke pushing de-dusting
Lime kiln de-dusting
-- Integrated Steel Plants Integrated Steel Plants --
Integrated steel plants
Sinter band - primary and secondary gases
-- Integrated Steel Plants Integrated Steel Plants --
Sinter band - primary and secondary gases
Traditionally ESPs used for primary de-dusting and fabric filter for secondary de-dusting
Proven technology - references
more than 50 ESPs in operation for sinter primary
more than 70 installations (ESP and FF) of sinter secondary
ESP collecting efficiency strongly related to chloride content in dust
Integrated steel plants - Sinter band
-- Integrated Steel Plants Integrated Steel Plants --
ESP emission comparison - sinter primary gases
Integrated steel plants - sinter band
-- Integrated Steel Plants Integrated Steel Plants --
CST ARCELOR - Ougree ARCLEOR - Charleroi
Brazil Belgium Belgium
Production rate (ton/h) 680 750 310
Gas flow (Nm3/h) 1 230 000 1 100 000 500 000
ESP type 3-field 3-field 4-field
ESP control EPIC II EPIC II EPIC II
Start up year 1997 1996 2002
Measured emission (mg/Nm3) < 30 < 100 < 100
Comments Very low chloride content Dust bleed of Micropulse in 4th field
ESP performance improvements
Integrated steel plants - Sinter band
Reduce load of alkali chlorides to ESPReduce feed of raw materials with high Cl content to sinter
band.Reduce re-circulation of ESP dust (dust bleed of)
Advanced energisationAdvanced ESP control technology (EPIC II)
Power down rappingSemipulse
Micropulse Technology
Reduction of dust resistivity SO3-injection
Integrated steel plants - Sinter band
ALSTOM is forerunner in developing flue gas cleaning of sinter band primary gases
More stringent requirements for SOx, HCl, HF, Heavy Metals and Dioxins
ALSTOM Research and Development
Filosorption for dioxin removal - extensive pilot testing at site in Arcelor-Ougree site
FDA/NID technology for dioxin and acid gases removal -site testing, 1st installation start up in May 2005
-- Integrated Steel Plants Integrated Steel Plants --
Integrated steel plants - Sinter band
FDA/NID - single unit operation to control HCl, HF, SOx, Heavy metals and Dioxin
-- Integrated Steel Plants Integrated Steel Plants --
Acid gases and dioxin removal
Lime and activated carbon as reagents
Extremely low particulate emission
Compact design with small footprint
Few, simple and well proven components
No effluent, dry end-product
TC ESP or Fabric Filter
Recirculation
Humidifier
Water
Reagent End Product
Integrated steel plants - Pelletising
Electrostatic precipitator (ESP) for de-dusting
-- Integrated Steel Plants Integrated Steel Plants --
Low pressure drop (250 Pa)
Low investment and maintenance cost even for large gas flows
High availability >99%
Integrated steel plants
Coke oven batteries - coke pushing dedusting
-- Integrated Steel Plants Integrated Steel Plants --
Trav-L-Vent duct
Quench car hood
Trav-L-Vent car
Coke guide top suction
Coke guide front suction
Belt
Integrated steel plants - coke pushing
Excellent alternative when retrofitting the existing coke batteries
Effective & efficient capture of fumes during door opening and pushing sequence
Reduced air volume enables savings in Fabric Filter size
Compliance with Authority Rules for coke pushing emission control
Patented trav-l-vent technology for fume capturing
-- Integrated Steel Plants Integrated Steel Plants --
Integrated steel plants - coke pushing
In house competence for effective fume capturing
Complete system with in-house technology
Movable TRAV-L-VENT fume capturing hood
Spark arrestor
Fabric Filter
Opacity increase during pushing sequence maximum 20%
Stack emission guarantee is 10 mg/Nm3
-- Integrated Steel Plants Integrated Steel Plants --
Integrated steel plants - coke pushing
High efficiency dedusting - ALSTOM LKPB
Spark arrestors ensures reliable and safe operation
Safety dampers for unexpected process situation ( green push )
Fabric filter design based on ALSTOM world class technology
Pulse jet or reverse air fabric filters
-- Integrated Steel Plants Integrated Steel Plants --
Integrated steel plants
Secondary ventilation
-- Integrated Steel Plants Integrated Steel Plants --
Integrated steel plants
Secondary ventilation - number of references
Blast Furnace cast house ventilation
28 Fabric Filter references
26 ESP references
Mixer and Converter secondary ventilation
28 Fabric Filter references
Stock house ventilation
7 Fabric Filter references
Material handling
20 Fabric filter references
-- Integrated Steel Plants Integrated Steel Plants --
Integrated steel plants
Secondary ventilation - the solution
What is required to have a efficient de-dusting?Proper hood arrangement (lay out, placement, tilting/stationary)
Correct gas flow at each suction point
Total gas flow (mixing of the gases from various sources)
Control system - different process phases to be respected
Selection of de-dusting equipment - ESP or FF
Guarantees achieved at working areas and at stack
Satisfied customer
Integrated steel plants
Tailor made hood arrangement for each single sources
Computerised Flow Dynamics (CFD) modelling used in hood design
Fabric Filter typically used for de-dusting
Low dust emission achieved (<10 mg/Nm3)
Secondary ventilation - ALSTOM s competence
-- Integrated Steel Plants Integrated Steel Plants --
Iron & Steel - references
Project Process Contract
Aceralia - Gijon - 2 ESPs for sinter primary gases 06 / 2004Arcelor - Fos sur Mer, France - NID for sinter primary gases 01 / 2004Mechel, Chelyabinsk, Russia - 4 ESPs for sinter primary gases 01 / 2004
Rautaruukki-Raahe, Finland - BOF and mixer secondary ventilation 05 / 2003
List of recent references for integrated steel plants:
-- Integrated Steel Plants Integrated Steel Plants --
Recent references - sinter primary
ARCELOR - Fos Sur Mer, France
-- Integrated Steel Plants Integrated Steel Plants --
Sinter primary gases
FDA/NID system with activated carbon and lime injection
Gas flow 800 000 m3/h
Emission guarantees
Dust 50 mg/Nm3
SOx 225 mg/Nm3
Dioxin 0,1 ng/Nm3
Start up May 2005
Recent references - Pelletising
-- Integrated Steel Plants Integrated Steel Plants --
COMPANHIA VALE DO RIO DOCE (CVRD)COMPANHIA VALE DO RIO DOCE (CVRD)
Location: São Luiz - MA, BrazilGas flow : 2 365 000 Nm3/hESP-type: 2 +1 ESP's, 3 fieldESP-control: EPIC IIStart up: 2002Inlet dust concentration: 1 500 mg/Nm3
Guaranteed emission: 70 mg/Nm3
Two ESPS for windboxes and one for hood.
Recent references - sinter primary
ARCELOR - Aceralia, Spain
Contract signed in June 2004
ESP for Sinter band A (375 ton/h)
Gas flow 800 000 m3/h
4 field ESP
Micro-pulsing energisation
Emission 50 mg/Nm3
Turn key installation
Start up June 2005
-- Integrated Steel Plants Integrated Steel Plants --
Linda Ayala y Nelson Izquierdo
NovNoviiembembrere 20062006
Mini Mills at a Glance
In-house technology for complete (primary and secondary gases) air pollution control systems
Technology originated from Daneco and Fläkt
280 references within Electric Steel Shop / Mini Mill
more than 80 complete plant installed for E.A.F.
References at all continents
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Mini Mills at a Glance
Recent product developments/improvements
Hot Quenching Tower - up flow design
Computerised Flow Dynamics (CFD) modelling for canopy hood
Fabric Filter cleaning valve design - patented OPTIPOW cleaning valve
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Scope of Business - Air Pollution Control:
Electric Steel Shop / Mini Mill
Electric Arc Furnace (E.A.F.) - primary & secondary emissions
Argon Oxygen De-carbonisation (A.O.D.) converters - primary & secondary emissions
Ladle Furnace (L.F.) - primary & secondary emissions
Scope of Business - Noise Proofing System:
Dog-house enclosure for E.A.F.Elephant-house enclosure for E.A.F.
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
E.A.F - primary and secondary de-dusting
Electric Steel Shop / Mini Mills
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Water Cooled Ducting (W.C.D.) - efficient cooling & energy production
High pressure design (12 bar) enables more efficient energy production
Combustion chamber is integrated to water cooled ducting
W.C.D. length is highly dependent on cooling method downstream of the ducting (draft coolers vs. hot quenching tower)
Cooling of primary gases
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Water Cooled Ducting - Typical design features
Flue gas temperature (HQT downstream of WCD):Inlet: 1600 °COutlet: 900 °C
Flue gas temperature (Draft type Cooler downstream of WCD):Inlet: 1600 °COutlet: 500 °C
Water temperature (low pressure, 2-4 bar):Inlet: 50 °COutlet: 60 °C
Water temperature (low pressure, 8-10 bar):Inlet: 80 °COutlet: 110 °C
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Cooling of primary gases
Cooling of primary gases
Hot Quenching Tower (H.Q.T.):
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Cooling of primary gases
Hot Quenching Tower - design features
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Two media nozzles
Typical flue gas temperaturesInlet: 900...1000 °COutlet: 250...350 °C
Design is optimised by using CFDtools
Both up-flow & down-flow design available
Up-flow design enables more efficient lay out >> savings in investment
Primary fumes quick cooling with the injection of finely atomised droplets of water. The high amount of the water evaporation heat allows the cooling of the fumes with a reduced amount of water.
Avoid the PCDD de-novo synthesis with the immediate cooling of the fumes below 250 °C just after the combustion chamber.
Connection of the primary fumes ducts to the secondary ventilation ducts just at short distance from the EAF, resulting in a more compact layout.
H.Q.T. - Advantages :
Cooling of primary gases
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
No need of installation of very long Water cooled Ducts, with the consequent reduction of the Water Treatment Plant Power consumption and running cost.
No need of Forced or Natural Draft Cooler reducing the system pressure losses (and consequently the main fan power consumption), and avoiding dust clogging in the cooler s tubes.
Very easy cleaning operations.
Rarely maintenance operation.
H.Q.T. vs. Draft coolers :
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Cooling of primary gases
Typical design features for HQT :
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Cooling of primary gases
Acc. di Verona 1Riva Group
(Italy)
Acc. di Verona 2Riva Group
(Italy)
Von Moss Stahl(Switzerland)
Acc. Stefana(Italy)
ALPA FranceRiva Group
(Italy)
ACIPco(USA)
GAS FLOW Nm3/h 130.000 130.000 100.000 200.000 110.000 190.000
PRESSUREAIR PEAK
Nm3/h 2.400 2.400 2.200 4.600 2.850 2.800
WATER PEAK m3/h 35 35 28 60 40 52
TEMPERAT.IN/OUT
°C 850-275 850-275 800-250 950-250 935-265 1.000-350
HQTDIAM./H
mm 2.300 / 8.350 2.300 / 8.350 3.000 / 7.500 4.000 / 13.000 3.000 / 12.000 2.500 / 40.000
RETENTIONTIME
sec 0.41 0.41 0.67 1.04 0.98 1.03
HQT TYPE Up Flow Up Flow Down Flow Down Flow Up FlowHorizontalFlow
E.A.F - primary and secondary de-dusting
Electric Steel Shop / Mini Mills
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Cooling of primary gases
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Natural - and Forced Draft - Coolers
Natural draft cooler Forced draft cooler
Cooling of primary gases
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Cleaning of the pipes essential important for efficient cooling and prevention of clogging
Typically used in processes with good scrap quality and stainless steel mills
Forced draft coolers requires smaller footprint compared to natural draft coolers.
Natural - and Forced Draft - Coolers
E.A.F - primary and secondary de-dusting
Electric Steel Shop / Mini Mills
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Secondary ventilation - canopy hood
Canopy hood - tailor made design
Optimised design for effective suction during all process sequences
CFD modelling based design
Proven technology with more than 70 installations world wide
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Safe operation
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Spark arrestors and safety dampers
Optimised pressured drop (400 - 700 Pa)
Efficient reduction of glowing particles
Enables safe operation for FF
Double safety dampers givesextra safety for FF operation
De-dusting
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Fabric Filter - heart of the cleaning system
ALSTOM is the leading fabric filters supplier
More than 200 fabric filter installations in Iron&Steel industry
Both reverse air or pulse jet type fabric filter in product portfolio
Patented OPTIPOW cleaning valve design for pulse jet FF
EFFIC control system with broken bag detection
Excellent reliability and availability
Noise enclosures
Noise limits of 85 dB(A) in working areasNoise limits of 45 dB(A) in facilities boundaries
Noise enclosure SOLUTIONS that can:
retrofitted to existing meltshops, or
adapted to new plant layouts
RESPECT:
Project Process Contract
Gerdau-Cosigua, Brazil - EAF primary and secondary gases 11 / 2003Gerdau-Sao Paolo, Brazil - EAF primary and secondary gases 11 / 2003Outokumpu-Tornio, Finland - EAF primary and secondary gases 06 / 2003
Concast-EASRCO, Egypt - EAF primary and secondary gases 03 / 2003De Acero-Saltillo, Mexico - EAF primary and secondary gases 11 / 2002
List of recent references for Mini Mills:
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Recent references
Recent references
Outokumpu Stainless Tornio - Finland EAF (150tons)
Water cooled ductingForced draft coolersCanopy hoodSpark arrestorFabric Filter
AOD (150 tons) Water cooled ductingForced draft coolersCanopy hoodSpark arrestorFabric Filter
Ladle furnaceCanopy hoodFabric Filter
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Recent references
De Acero S.A. - Saltillo
EAF (55 tons) primary and secondary gasesRefurbishment of the existing flue gas treatmentStart up 2003 Delivery consisted:
New Hot Quenching tower - up-flow designAdditional fabric filter - pulse jet typeID fans
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Recent references
Gerdau - Sao Paolo
EAF (100 tons) and LF primary and secondary gases
Complete flue gas handling system consisting Water Cooled ductingHot Quenching tower - up-flow designCanopy hood for capturing secondary fumesSpark arrestorReverse air type of fabric filter (700 000 m3/h)ID fans (2 * 1200 kW)Stack
Start up 2005
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
Recent references
Gerdau - Cosigua
EAF (170 tons) primary and secondary gases
Rebuilding of existing flue gas treatment Hot Quenching tower - up-flow design
Spark arrestorExtension of existing Reverse air type of fabric filter
Start up 2005
-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --
www.environment.power.alstom.com
This document was created with Win2PDF available at http://www.daneprairie.com.The unregistered version of Win2PDF is for evaluation or non-commercial use only.