Soluciones de Aire Limpioen la

Industria del Hierro y el Acero

Linda Ayala y Nelson Izquierdo

NovNoviemiembbrere 20020066

Page 3: alstom

Environmental Control Systems

Air pollution control systems & products for power & industrial applications

A business driven by increasingly strict emissions regulations

Serving new plants & retrofitting existing plants

Our Business

Bringing you a World of Experience in Clean Air Solutions

Page 4: alstom

Environmental Control Systems

Employs around 1000air pollution controlprofessionals

Located in 13 countriesaround the world

Dedicated R&D facilities

70 years experience inair pollution control

Our Organization

Page 5: alstom

ALSTOMALSTOM EnvironmentalEnvironmental ControlControl SystemsSystems

1989 200019991922

DanecoItaly

1996

-- Long history in air pollution control Long history in air pollution control --

Origin and background:

Page 6: alstom

ECS Corporate Headquarters + French Unit, Paris, France

Our Locations

Total: approx. 1000 employees

Knoxville

São Paulo

Kolkata

Sydney

Oslo Växjö

Helsinki

Milan

Moscow

Butzbach

Paris

Kobe

Beijing

Page 7: alstom

ECS LAM Headquarters

Our Locations Latin America

Santiago

Caracas

BuenosAires

Bogotá

São Paulo

MexicoNew Office Locations

Page 8: alstom

Industries we Serve

AluminiumCementGlassIron & SteelIndustrial Incineration PlantsNon-ferrousPulp & PaperPower

Page 9: alstom

Iron & Steel at a Glance

Leading position worldwide as supplier of APC plants for the Iron & Steel Industry.

Over 30 years experience

More than 600 successful installations world wide

280 references for Electric Steel Shop / Mini Mill

320 references in Integrated Steel Plants

Technical excellence achieved by long experience and focused R&D efforts

Page 10: alstom

Scope of Business - Air Pollution Control:

Electric Steel Shop / Mini Mills

Electric Arc Furnace (E.A.F.) - primary & secondary emissions

Argon Oxygen De-carbonisation (A.O.D.) converters -primary & secondary emissions

Ladle Furnace (L.F.) - primary & secondary emissions

Scope of Business - Noise Proofing System:

Dog-house enclosure for E.A.F.Elephant-house enclosure for E.A.F.

Page 11: alstom

Scope of Business - Air Pollution Control:

Integrated Steel Plants

Sinter band (primary & secondary emissions)

Dedusting with Electrostatic precipitator or Fabric Filter

SO2 and dioxin control with NID (dry de-SOx)

Pelletising plants

Secondary ventilation for stock house

Secondary ventilation for converter and mixer hall

Coke pushing de-dusting

Lime kiln de-dusting

Blast Furnace cast house ventilation

Page 12: alstom

Water-Cooled Hoods and Ducting

Post-combustion Chambers

Gas Coolers - forced-draft and natural-draft types

Hot Quenching Towers

Hoods for secondary emissions

Cyclone & spark-arrestors - axial and vertical types

Fabric Filters (FF) - pulse-jet and reverse-air types

Electrostatic Precipitators (ESP) - dry and wet types

Wet Scrubbers

Product Portfolio

In House technology:

Page 13: alstom

Scope of Activities

Supply of complete plants

Supply of dedicated Products

Turn-key installations of dedicated Products

Modernisation and retrofit of existing installations

Equipment and system supply:

Page 14: alstom

Scope of Activities

Engineering service for complete plants and for dedicated Products

Supervision service to erection, start-up and commissioning

Post start-up services (i.e. spare parts, technical assistance, etc.)

Services:

Page 15: alstom

Iron & Steel - references

Project Process Contract

Aceralia - Gijon, Spain - 2 ESPs for sinter primary gases 06 / 2004Arcelor - Fos sur Mer, France - FDA for sinter primary gases 01 / 2004Mechel, Chelyabinsk, Russia - 4 ESPs for sinter primary gases 01 / 2004

Gerdau-Cosigua, Brazil - EAF primary and secondary gases 11 / 2003Gerdau-Sao Paolo, Brazil - EAF primary and secondary gases 11 / 2003Outokumpu-Tornio, Finland - EAF primary and secondary gases 06 / 2003

Rautaruukki-Raahe, Finland - BOF and mixer secondary ventilation 05 / 2003Concast-EASRCO, Egypt - EAF primary and secondary gases 03 / 2003

List of recent references:

Page 16: alstom

Selected references

Arcelor DunkerqueFRANCE

Sinter band (Secondary)start up 2000

Rautaruukki RaaheFinland

Mixer hall secondary ventilationstart up 2004

Page 17: alstom

Selected references

Henningsdorfer ElektrostahlwerkeGERMANY

EAF and LF (Primary & Secondary)start up 1992

Outokumpu Stainless TornioFinland

EAF (Primary & Secondary)LF (Primary)AOD (Primary & Secondary)

start up 2003

Page 18: alstom

Acerinox SPAIN

EAF (Primary & Secondary)start up 1997

Elbe StahlwerkeGERMANY

EAF and LF (Primary & Secondary)start up 1992

Selected references

Page 19: alstom

Selected references

ALPA (Riva Group)FRANCE

EAF (Primary & Secondary)start up 2000

Gerdau PiratiniBRAZIL

EAF and LF (Primary & Secondary)start up 1999

Page 20: alstom

Linda Ayala y Nelson Izquierdo

NovNoviemiembbrere 20062006

Page 21: alstom

Integrated Steel Plants at a Glance

More than 300 references globally

Combination of air pollution control and process know-how

Leading supplier for Sinter Band air pollution control

No. 1 supplier of ESPs for sinter band

Breakthrough technology for gas cleaning using dry FGD (SOx , HCl and dioxin removal)

Technical excellence achieved by long experience and focused R&D efforts

-- Integrated Steel Plants Integrated Steel Plants --

Page 22: alstom

Scope of Business - Air Pollution Control:

Integrated Steel Plants

Sinter band - primary & secondary emissions

Dedusting with Electrostatic precipitator or Fabric Filter

SO2 and dioxin removal with NID/FDA

Pelletising plants

Secondary ventilation for stock house

Secondary ventilation for converter and mixer hall

Blast Furnace cast house ventilation

Coke pushing de-dusting

Lime kiln de-dusting

-- Integrated Steel Plants Integrated Steel Plants --

Page 23: alstom

Integrated steel plants

Sinter band - primary and secondary gases

-- Integrated Steel Plants Integrated Steel Plants --

Page 24: alstom

Sinter band - primary and secondary gases

Traditionally ESPs used for primary de-dusting and fabric filter for secondary de-dusting

Proven technology - references

more than 50 ESPs in operation for sinter primary

more than 70 installations (ESP and FF) of sinter secondary

ESP collecting efficiency strongly related to chloride content in dust

Integrated steel plants - Sinter band

-- Integrated Steel Plants Integrated Steel Plants --

Page 25: alstom

ESP emission comparison - sinter primary gases

Integrated steel plants - sinter band

-- Integrated Steel Plants Integrated Steel Plants --

CST ARCELOR - Ougree ARCLEOR - Charleroi

Brazil Belgium Belgium

Production rate (ton/h) 680 750 310

Gas flow (Nm3/h) 1 230 000 1 100 000 500 000

ESP type 3-field 3-field 4-field

ESP control EPIC II EPIC II EPIC II

Start up year 1997 1996 2002

Measured emission (mg/Nm3) < 30 < 100 < 100

Comments Very low chloride content Dust bleed of Micropulse in 4th field

Page 26: alstom

ESP performance improvements

Integrated steel plants - Sinter band

Reduce load of alkali chlorides to ESPReduce feed of raw materials with high Cl content to sinter

band.Reduce re-circulation of ESP dust (dust bleed of)

Advanced energisationAdvanced ESP control technology (EPIC II)

Power down rappingSemipulse

Micropulse Technology

Reduction of dust resistivity SO3-injection

Page 27: alstom

Integrated steel plants - Sinter band

ALSTOM is forerunner in developing flue gas cleaning of sinter band primary gases

More stringent requirements for SOx, HCl, HF, Heavy Metals and Dioxins

ALSTOM Research and Development

Filosorption for dioxin removal - extensive pilot testing at site in Arcelor-Ougree site

FDA/NID technology for dioxin and acid gases removal -site testing, 1st installation start up in May 2005

-- Integrated Steel Plants Integrated Steel Plants --

Page 28: alstom

Integrated steel plants - Sinter band

FDA/NID - single unit operation to control HCl, HF, SOx, Heavy metals and Dioxin

-- Integrated Steel Plants Integrated Steel Plants --

Acid gases and dioxin removal

Lime and activated carbon as reagents

Extremely low particulate emission

Compact design with small footprint

Few, simple and well proven components

No effluent, dry end-product

TC ESP or Fabric Filter

Recirculation

Humidifier

Water

Reagent End Product

Page 29: alstom

Integrated steel plants - Pelletising

Electrostatic precipitator (ESP) for de-dusting

-- Integrated Steel Plants Integrated Steel Plants --

Low pressure drop (250 Pa)

Low investment and maintenance cost even for large gas flows

High availability >99%

Page 30: alstom

Integrated steel plants

Coke oven batteries - coke pushing dedusting

-- Integrated Steel Plants Integrated Steel Plants --

Page 31: alstom

Trav-L-Vent duct

Quench car hood

Trav-L-Vent car

Coke guide top suction

Coke guide front suction

Belt

Integrated steel plants - coke pushing

Excellent alternative when retrofitting the existing coke batteries

Effective & efficient capture of fumes during door opening and pushing sequence

Reduced air volume enables savings in Fabric Filter size

Compliance with Authority Rules for coke pushing emission control

Patented trav-l-vent technology for fume capturing

-- Integrated Steel Plants Integrated Steel Plants --

Page 32: alstom

Integrated steel plants - coke pushing

In house competence for effective fume capturing

Complete system with in-house technology

Movable TRAV-L-VENT fume capturing hood

Spark arrestor

Fabric Filter

Opacity increase during pushing sequence maximum 20%

Stack emission guarantee is 10 mg/Nm3

-- Integrated Steel Plants Integrated Steel Plants --

Page 33: alstom

Integrated steel plants - coke pushing

High efficiency dedusting - ALSTOM LKPB

Spark arrestors ensures reliable and safe operation

Safety dampers for unexpected process situation ( green push )

Fabric filter design based on ALSTOM world class technology

Pulse jet or reverse air fabric filters

-- Integrated Steel Plants Integrated Steel Plants --

Page 34: alstom

Integrated steel plants

Secondary ventilation

-- Integrated Steel Plants Integrated Steel Plants --

Page 35: alstom

Integrated steel plants

Secondary ventilation - number of references

Blast Furnace cast house ventilation

28 Fabric Filter references

26 ESP references

Mixer and Converter secondary ventilation

28 Fabric Filter references

Stock house ventilation

7 Fabric Filter references

Material handling

20 Fabric filter references

-- Integrated Steel Plants Integrated Steel Plants --

Page 36: alstom

Integrated steel plants

Secondary ventilation - the solution

What is required to have a efficient de-dusting?Proper hood arrangement (lay out, placement, tilting/stationary)

Correct gas flow at each suction point

Total gas flow (mixing of the gases from various sources)

Control system - different process phases to be respected

Selection of de-dusting equipment - ESP or FF

Guarantees achieved at working areas and at stack

Satisfied customer

Page 37: alstom

Integrated steel plants

Tailor made hood arrangement for each single sources

Computerised Flow Dynamics (CFD) modelling used in hood design

Fabric Filter typically used for de-dusting

Low dust emission achieved (<10 mg/Nm3)

Secondary ventilation - ALSTOM s competence

-- Integrated Steel Plants Integrated Steel Plants --

Page 38: alstom

Iron & Steel - references

Project Process Contract

Aceralia - Gijon - 2 ESPs for sinter primary gases 06 / 2004Arcelor - Fos sur Mer, France - NID for sinter primary gases 01 / 2004Mechel, Chelyabinsk, Russia - 4 ESPs for sinter primary gases 01 / 2004

Rautaruukki-Raahe, Finland - BOF and mixer secondary ventilation 05 / 2003

List of recent references for integrated steel plants:

-- Integrated Steel Plants Integrated Steel Plants --

Page 39: alstom

Recent references - sinter primary

ARCELOR - Fos Sur Mer, France

-- Integrated Steel Plants Integrated Steel Plants --

Sinter primary gases

FDA/NID system with activated carbon and lime injection

Gas flow 800 000 m3/h

Emission guarantees

Dust 50 mg/Nm3

SOx 225 mg/Nm3

Dioxin 0,1 ng/Nm3

Start up May 2005

Page 40: alstom

Recent references - Pelletising

-- Integrated Steel Plants Integrated Steel Plants --

COMPANHIA VALE DO RIO DOCE (CVRD)COMPANHIA VALE DO RIO DOCE (CVRD)

Location: São Luiz - MA, BrazilGas flow : 2 365 000 Nm3/hESP-type: 2 +1 ESP's, 3 fieldESP-control: EPIC IIStart up: 2002Inlet dust concentration: 1 500 mg/Nm3

Guaranteed emission: 70 mg/Nm3

Two ESPS for windboxes and one for hood.

Page 41: alstom

Recent references - sinter primary

ARCELOR - Aceralia, Spain

Contract signed in June 2004

ESP for Sinter band A (375 ton/h)

Gas flow 800 000 m3/h

4 field ESP

Micro-pulsing energisation

Emission 50 mg/Nm3

Turn key installation

Start up June 2005

-- Integrated Steel Plants Integrated Steel Plants --

Page 42: alstom

Linda Ayala y Nelson Izquierdo

NovNoviiembembrere 20062006

Page 43: alstom

Mini Mills at a Glance

In-house technology for complete (primary and secondary gases) air pollution control systems

Technology originated from Daneco and Fläkt

280 references within Electric Steel Shop / Mini Mill

more than 80 complete plant installed for E.A.F.

References at all continents

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 44: alstom

Mini Mills at a Glance

Recent product developments/improvements

Hot Quenching Tower - up flow design

Computerised Flow Dynamics (CFD) modelling for canopy hood

Fabric Filter cleaning valve design - patented OPTIPOW cleaning valve

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 45: alstom

Scope of Business - Air Pollution Control:

Electric Steel Shop / Mini Mill

Electric Arc Furnace (E.A.F.) - primary & secondary emissions

Argon Oxygen De-carbonisation (A.O.D.) converters - primary & secondary emissions

Ladle Furnace (L.F.) - primary & secondary emissions

Scope of Business - Noise Proofing System:

Dog-house enclosure for E.A.F.Elephant-house enclosure for E.A.F.

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 46: alstom

E.A.F - primary and secondary de-dusting

Electric Steel Shop / Mini Mills

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 47: alstom

Water Cooled Ducting (W.C.D.) - efficient cooling & energy production

High pressure design (12 bar) enables more efficient energy production

Combustion chamber is integrated to water cooled ducting

W.C.D. length is highly dependent on cooling method downstream of the ducting (draft coolers vs. hot quenching tower)

Cooling of primary gases

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 48: alstom

Water Cooled Ducting - Typical design features

Flue gas temperature (HQT downstream of WCD):Inlet: 1600 °COutlet: 900 °C

Flue gas temperature (Draft type Cooler downstream of WCD):Inlet: 1600 °COutlet: 500 °C

Water temperature (low pressure, 2-4 bar):Inlet: 50 °COutlet: 60 °C

Water temperature (low pressure, 8-10 bar):Inlet: 80 °COutlet: 110 °C

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Cooling of primary gases

Page 49: alstom

Cooling of primary gases

Hot Quenching Tower (H.Q.T.):

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 50: alstom

Cooling of primary gases

Hot Quenching Tower - design features

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Two media nozzles

Typical flue gas temperaturesInlet: 900...1000 °COutlet: 250...350 °C

Design is optimised by using CFDtools

Both up-flow & down-flow design available

Up-flow design enables more efficient lay out >> savings in investment

Page 51: alstom

Primary fumes quick cooling with the injection of finely atomised droplets of water. The high amount of the water evaporation heat allows the cooling of the fumes with a reduced amount of water.

Avoid the PCDD de-novo synthesis with the immediate cooling of the fumes below 250 °C just after the combustion chamber.

Connection of the primary fumes ducts to the secondary ventilation ducts just at short distance from the EAF, resulting in a more compact layout.

H.Q.T. - Advantages :

Cooling of primary gases

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 52: alstom

No need of installation of very long Water cooled Ducts, with the consequent reduction of the Water Treatment Plant Power consumption and running cost.

No need of Forced or Natural Draft Cooler reducing the system pressure losses (and consequently the main fan power consumption), and avoiding dust clogging in the cooler s tubes.

Very easy cleaning operations.

Rarely maintenance operation.

H.Q.T. vs. Draft coolers :

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Cooling of primary gases

Page 53: alstom

Typical design features for HQT :

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Cooling of primary gases

Acc. di Verona 1Riva Group

(Italy)

Acc. di Verona 2Riva Group

(Italy)

Von Moss Stahl(Switzerland)

Acc. Stefana(Italy)

ALPA FranceRiva Group

(Italy)

ACIPco(USA)

GAS FLOW Nm3/h 130.000 130.000 100.000 200.000 110.000 190.000

PRESSUREAIR PEAK

Nm3/h 2.400 2.400 2.200 4.600 2.850 2.800

WATER PEAK m3/h 35 35 28 60 40 52

TEMPERAT.IN/OUT

°C 850-275 850-275 800-250 950-250 935-265 1.000-350

HQTDIAM./H

mm 2.300 / 8.350 2.300 / 8.350 3.000 / 7.500 4.000 / 13.000 3.000 / 12.000 2.500 / 40.000

RETENTIONTIME

sec 0.41 0.41 0.67 1.04 0.98 1.03

HQT TYPE Up Flow Up Flow Down Flow Down Flow Up FlowHorizontalFlow

Page 54: alstom

E.A.F - primary and secondary de-dusting

Electric Steel Shop / Mini Mills

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 55: alstom

Cooling of primary gases

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Natural - and Forced Draft - Coolers

Natural draft cooler Forced draft cooler

Page 56: alstom

Cooling of primary gases

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Cleaning of the pipes essential important for efficient cooling and prevention of clogging

Typically used in processes with good scrap quality and stainless steel mills

Forced draft coolers requires smaller footprint compared to natural draft coolers.

Natural - and Forced Draft - Coolers

Page 57: alstom

E.A.F - primary and secondary de-dusting

Electric Steel Shop / Mini Mills

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 58: alstom

Secondary ventilation - canopy hood

Canopy hood - tailor made design

Optimised design for effective suction during all process sequences

CFD modelling based design

Proven technology with more than 70 installations world wide

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 59: alstom

Safe operation

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Spark arrestors and safety dampers

Optimised pressured drop (400 - 700 Pa)

Efficient reduction of glowing particles

Enables safe operation for FF

Double safety dampers givesextra safety for FF operation

Page 60: alstom

De-dusting

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Fabric Filter - heart of the cleaning system

ALSTOM is the leading fabric filters supplier

More than 200 fabric filter installations in Iron&Steel industry

Both reverse air or pulse jet type fabric filter in product portfolio

Patented OPTIPOW cleaning valve design for pulse jet FF

EFFIC control system with broken bag detection

Excellent reliability and availability

Page 61: alstom

Noise enclosures

Noise limits of 85 dB(A) in working areasNoise limits of 45 dB(A) in facilities boundaries

Noise enclosure SOLUTIONS that can:

retrofitted to existing meltshops, or

adapted to new plant layouts

RESPECT:

Page 62: alstom

Project Process Contract

Gerdau-Cosigua, Brazil - EAF primary and secondary gases 11 / 2003Gerdau-Sao Paolo, Brazil - EAF primary and secondary gases 11 / 2003Outokumpu-Tornio, Finland - EAF primary and secondary gases 06 / 2003

Concast-EASRCO, Egypt - EAF primary and secondary gases 03 / 2003De Acero-Saltillo, Mexico - EAF primary and secondary gases 11 / 2002

List of recent references for Mini Mills:

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Recent references

Page 63: alstom

Recent references

Outokumpu Stainless Tornio - Finland EAF (150tons)

Water cooled ductingForced draft coolersCanopy hoodSpark arrestorFabric Filter

AOD (150 tons) Water cooled ductingForced draft coolersCanopy hoodSpark arrestorFabric Filter

Ladle furnaceCanopy hoodFabric Filter

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 64: alstom

Recent references

De Acero S.A. - Saltillo

EAF (55 tons) primary and secondary gasesRefurbishment of the existing flue gas treatmentStart up 2003 Delivery consisted:

New Hot Quenching tower - up-flow designAdditional fabric filter - pulse jet typeID fans

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 65: alstom

Recent references

Gerdau - Sao Paolo

EAF (100 tons) and LF primary and secondary gases

Complete flue gas handling system consisting Water Cooled ductingHot Quenching tower - up-flow designCanopy hood for capturing secondary fumesSpark arrestorReverse air type of fabric filter (700 000 m3/h)ID fans (2 * 1200 kW)Stack

Start up 2005

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 66: alstom

Recent references

Gerdau - Cosigua

EAF (170 tons) primary and secondary gases

Rebuilding of existing flue gas treatment Hot Quenching tower - up-flow design

Spark arrestorExtension of existing Reverse air type of fabric filter

Start up 2005

-- Electric steel shop / Mini Mill Electric steel shop / Mini Mill --

Page 67: alstom

www.environment.power.alstom.com

Page 68: alstom

This document was created with Win2PDF available at http://www.daneprairie.com.The unregistered version of Win2PDF is for evaluation or non-commercial use only.