ahmad luthfee ahmad zaki-aug16 (2)
TRANSCRIPT
Updated November 2014
Page 1 of 7
AHMAD LUTHFEE AHMAD ZAKI LEAD MECHANICAL ROTATING ENGINEER
Born: 10th March 1979
Nationality: Malaysian
Marital Status: Married
Address: Lot 4387B Jalan Lengkong Zooview 68000 Ulu Klang
Selangor, Malaysia
Telephone (Mobile): +6 0192891290
Email: [email protected] or
QUALIFICATIONS B. Eng (Hons) in Mechanical and Offshore Engineering, Robert Gordon University, Aberdeen, United Kingdom, 2002
PROFESSIONAL AFFILIATION Registered as a Member with Board of Engineers Malaysia (BEM)
PROFESSIONAL COURSES Offshore Cranes by DNV Course on Pump at IEM BOSET Sea Survival Course Rolls Royce Gas Turbine & Compressor Workshop
WORK EXPERIENCE PETROFAC ENGINEERING SERVICES (FORMERLY RNZ INTEGRATED (M) SDN BHD) (Sep 2011 – Present) Menara Great Eastern, Kuala Lumpur
Role as Senior/Lead Rotating Engineer
- Overseeing Mechanical Rotating Team of Engineers to ensure timely delivery and quality of project documents.
- Plan, coordinate and supervise major engineering work / activities carried out on an oil & gas project. Identify and resolve engineering issues.
- Able to effectively communicate technical solutions and concepts to other engineers and non-engineers.
- Ensures effective communications among other engineering disciplines and with clients/end users.
- Provide technical expertise/service to the Project for development of design for rotating equipment packages for offshore facilities with special attention to FEED, Detailed Design and in EPIC Execution stage.
- Develop machinery selection reports, application and sizing studies and select best techno-commercial solutions to ensure designs are optimal, safe, cost effective and in compliance with the latest Codes, Standards, National and Client Corporate requirements and Procedures.
- Lead machinery material handling and lifting studies.
- Support FEED execution and procurement of Long Lead Items, review and provide input to Technical deviations, support tendering activities
EXPERIENCE SUMMARY Since graduation in 2002, Luthfee has been
working for fourteen (14) years in Oil and Gas,
Petrochemical and Power Plant.
He had worked for Ranhill WorleyParson Sdn
Bhd for three (3) years as Mechanical/Piping
Engineer, Aker Kvaener Engineering for (one)
year as Senior Mechanical Engineer, RNZ for
one (1) year as Senior Mechanical Engineer
and MMC Oil and Gas for three (3) years as
Senior Mechanical Engineer (Machinery).
He has been working with PETROFAC
Engineering Service (Formerly RNZ since
September 2011 as Senior Mechanical
Engineer.
He has been involved in various stages of
design such as Conceptual, FEED, Detailed
Design, and Independent Design Assessment
for Green Fields, Brown Fields and
Debottlenecking projects.
He has strong backgrounds in mechanical
design engineering work on various oil & gas
projects for offshore and onshore facilities with
consultancy and EPCC firms. Knowledge in
preparing Specifications, Material Requisitions,
Technical Bid Evaluations Reports, Material
Handling Study Reports, Design Basis, Driver
Selection Philosophy, Rotating Equipment Life
Cycle Cost (TCOO) Study and Datasheets for
various mechanical rotating equipment /
packages.
Familiar with range of proprietary software
including Microsoft Office (Words, Excel &
PowerPoint), AutoCAD, PIPESIM, CIMCAD and
CAESAR II (pipe stress analysis) and familiar
with relevant international codes and standards
including ASME, ANSI, API, NFPA, MAERSK
Oil (MITS), PTS, TEMA and DEP.
Updated November 2014
Page 2 of 7
(including tendering preparation, pre-qualification, bid evaluation and award) for FEED and EPIC contracts.
- Undertake various Rotating equipment package design, selection/application and sizing studies, as well as studies for existing facilities revamp/upgrade as necessary.
- Provide rotating equipment technical support to Project in various phases of the Project lifecycle i.e. LDR Reviews, Study, SOW preparation, Pre-award evaluations, Engineering, Procurement, Construction, Commissioning and Start-up phases.
- Ensure full life cycle costs are taken into consideration during the decision- making process for design. Carry out in-house Mechanical design related to optimization and selection studies, TCOO life cycle cost analysis, prepare data sheets and specifications for Rotating Equipment.
Position : Senior Mechanical / Rotating Equipment Engineer
Provision of Baronia Rejuvenation Workscoping and Engineering
Rotating Lead Engineer
Feasibility Study for
Gas Turbine Generator Study Crude Oil Transfer Pumps Driver Selection Crude Oil Transfer Pumps TCOO Life Cycle Cost Analysis Sump Pump Driver Selection
Overseeing Mechanical Rotating Team of Engineers to ensure timely delivery and quality of project documents as listed below:
Specification for Gas Turbine Compressor Refurbishment Scope of Work (Kawasaki/Rolls Royce)
Specification for Gas Turbine Generator (Siemens SGT 200 formerly Ruston Tornado)
Specification for Crude Oil Export Pumps (API 610 BB3) Specification for Centrifugal Pumps (API 610) Specification for Reciprocating Pumps (API 674) Specification for Chemical Injection Pumps (API 675) Specification for H2S Scavenger Pumps
Detailed Design For Replacement of D18MP-A Instrument Air Compressor Package For Petronas Carigali Sdn Bhd – Sarawak Operations
Lead for Mechanical Rotating Feasibility Study Report for Air Compressor Specification for Air Compressor
Provision Of Engineering, Procurement, Construction And Commissioning (EPCC) Of Garagol Deniz West Development Project For Petronas Carigali (Turkmenistan) Sdn Bhd (PCTSB) / ILK INŞAAT
Package Engineer and Checker for: Pedestal Crane (41m Boom) Gas Engine Driven Multiphase Pumps (1700kW) Centrifugal Pumps (API 610) Air Operated Diaphragm Pump Reciprocating Pumps Air Compressor and Dryer Package Prepared Reports for: Material Handling Study Report Equipment Layout Study Option
Multiphase Pump Feasibility Study Prepared Material Requisitions, Specifications and Datasheets for: Pedestal Crane (41m Boom) Gas Engine Driven Multiphase Pumps (1700kW) Centrifugal Pumps (API 610) Air Operated Diaphragm Pump Reciprocating Pumps
Updated November 2014
Page 3 of 7
Air Compressor and Dryer Package Technical Bid Evaluation for Packages listed below: Pedestal Crane (41m Boom) Gas Engine Driven Multiphase Pumps (1700kW) Centrifugal Pumps (API 610) Air Operated Diaphragm Pump Reciprocating Pumps Air Compressor and Dryer Package Vendor Data Review for: Pedestal Crane (41m Boom) Gas Engine Driven Multiphase Pumps (1700kW) Centrifugal Pumps (API 610) Air Operated Diaphragm Pump Reciprocating Pumps Air Compressor and Dryer Package
Concept Refinement, Front End Engineering Design and Detailed Design of Magtymguly Gas Recycling Development Project For Petronas Carigali Turkmenistan Sdn Bhd (PCTSB)
Package Engineer for: Gas Re-Injection Compressor Package (250 mmscfd /
20MW Gas Turbine) Condensate Export Pump (209m3/hr, 730kW) Seawater Lift Pumps Firewater Pump Centrifugal Pumps (API 610) Air Operated Double Diaphragm Pumps Reciprocating Pump
Provision of Front End Engineering Design Services for SK310 B15
Field Development for Sapura Kencana Energy
Package Engineer and Checker for: Firewater Pump Package Reciprocating Pumps Centrifugal Pumps Gas Turbine Generator Package Emergency Diesel Generator Package
Provision Of Engineering, Procurement, Construction And
Commissioning (EPCC) Of For Central Diyarbekir Development Project Topsides And Jacket For Petronas Carigali (Turkmenistan) Sdn Bhd (PCTSB) / ILK INŞAAT
Package Engineer for: Pedestal Crane (41m Boom) Gas Engine Driven Multiphase Pumps (1700kW) Centrifugal Pumps (API 610) Air Operated Diaphragm Pump Reciprocating Pumps Air Compressor and Dryer Package
Prepared Reports for:
Material Handling Study Report Equipment Layout Study Option Multiphase Pump Study
Prepared Material Requisitions, Specifications and Datasheets for:
Pedestal Crane (41m Boom) Gas Engine Driven Multiphase Pumps (1700kW) Centrifugal Pumps (API 610) Air Operated Diaphragm Pump Reciprocating Pumps Air Compressor and Dryer Package
Technical Bid Evaluation for Packages listed below:
Pedestal Crane (41m Boom) Gas Engine Driven Multiphase Pumps (1700kW) Centrifugal Pumps (API 610) Air Operated Diaphragm Pump Reciprocating Pumps Air Compressor and Dryer Package
Updated November 2014
Page 4 of 7
Provision Of Engineering Design For PMO Pipeline Replacement Project (PPRP) For Petronas Carigali Sdn Bhd (PCSB) (Bekok A Upgrade & Topsides Modification)
Package Engineer for Crude Oil Transfer Pumps. Prepared Reports for: Pump Selection Report Material Handling Study Report
Prepared Material Requisitions, Specifications and Datasheets for:
Crude Oil Transfer Pumps
Prepared Material Requisitions, Specifications and Datasheets for: Crude Oil Transfer Pumps
Technical Bid Evaluation, Assist Procurement and Vendor Data Review for:
Crude Oil Transfer Pumps Provision to Upgrade and Refurbish Client Supplied MOPU on an EPCIC Contract for the West Desaru Development
Project, Block PM304.
Package Engineer for: Pedestal Crane (New and Refurbished) Water Injection Booster Pump (Centrifugal) Seawater Lift Pump (Submersible motor)
Prepared Reports for:
Material Handling Study Report
Prepared Material Requisitions, Specifications and Datasheets for: Pedestal Crane Water Injection Booster Pump Seawater Lift Pump
Technical Bid Evaluation, Assist Procurement and Vendor Data Review for Packages listed below:
Pedestal Crane (New) Pedestal Crane Refurbishment (Existing on the MOPU) Water Injection Booster Pump Seawater Lift Pump
MMC OIL & GAS ENGINEERING SDN BHD (May 2008 – Aug 2011)
Position : Senior Mechanical Engineer
Provision of Conceptual and Front End Engineering Design (FEED) For Semarang Redevelopment Phase 2 Projects for PETRONAS Carigali Sdn Bhd
Samarang field produce via the seven drilling platforms and satellite jackets (i.e. SMDP-A, SMDP-B, SMJT-C, SMJT-D, SMJT-E, SMJT-F and SMJT-G). The producers are predominantly gas lifted dual completion wells.
The proposed Samarang Redevelopment Project is anticipated to increase recoverable reserves by as much as 78MMstb from 17MMstb to 95MMstb within 2026. If implemented and executed as recommended, the field will achieve a state of zero continuous venting within 2015, and result in a remaining oil production rate of 6000 forecast of 41%, to 51% in 2026.
The developments include one new gas compression platform (SMG-AA), a new water injection platform (SMW-B) and a new drilling platform (SMJT-AA).
Prepared Reports for:
Mechanical Design Basis Report (for SMG-AA, SMW-B & SMJT-AA Platforms) Equipment & Driver Recommendation Philosophy Report Technical Notes – Crude Oil Transfer Pumps Driver Selection (Gas Engine/ Electric Motor)
Prepared Material Requisitions, Specifications/ Report and Datasheets for mechanical equipment packages listed below:
Gas Turbine Generators (3.67MW Centaur 50) LP Gas Compressors (50 MMSCFD Taurus 60)
Gas Lift Compressors ( 50 MMSCFD Taurus 60) Gas Injection Compressors(50 MMSCFD Mars 90) Crude Oil Transfer Pumps (100m3/hr, 110kW) Platform Cranes Electric Submersible Firewater Pump (1100m3/hr)
Engineering Design Services for ANGSI Phase IV Development, Procurement Assistance and Post AFC Support Services
ANGSI – B Gas Facilities Development Detailed Design for PETRONAS Carigali Sdn Bhd
Updated November 2014
Page 5 of 7
Prepared Material Requisitions, Specifications/ Report and Datasheets for mechanical equipment packages listed below:
Multiphase Pumps 2 x 50% Twin Screw API 676 with variable speed drive system (39 mmcfd/HC 154Am3/hr / H2O 78 Am3/hr .200kW motor)
Oil Transfer Pumps 2 x 100% lead lag config. Api 674 Horizontal Reciprocating Positive Displacement Pumps (5m3/hr 10 kw motor)
Wellhead Equalisation Pump 1x100% API 674 Horizontal Reciprocating Positive Displacement Pumps (3m3/hr 20 kw motor) Malampaya Asset Integrity and Debottlenecking Project for Shell Philippines Exploration B.V
Prepare Reports for:
HPU Study Report Solar Turbine Enclosure Review Report Material Handling Study Report
Consortium of MMCOG, PECD, ELNUSA - Jabung Gas Booster Station Project Jambi Indonesia
Factory Acceptance Test for Centrifugal Pumps listed below:
Potable Water Distribution Pumps (22-P-2490A/B) Utility Water Distribution Pumps (22-P-2460A/B) Fire Water Feed Pump (22-P-2440) Fire Water Jockey Pump (22-P-4120) Downhole Pump (22-P-2410A/B)
Conceptual Design and Detailed Design of F6 Tie-In for F28 Development Project for Sarawak Shell Berhad
Prepared Material Requisitions, Specifications/ Report and Datasheets for mechanical equipment packages listed below:
Constructability, Installation Study Host Tie-In F6K-A Report Material Handling Study Report
PCPP Operating Company Sdn Bhd – Conceptual, Front End Engineering and Detailed Design Services for D1 Cluster
Development Project
Prepared Material Requisitions, Specifications/ Report and Datasheets for mechanical equipment packages listed below:
Specification for Crude Booster Pumps Specification for Closed Drain Transfer Pumps
MALAYSIAN REFINING COMPANY SDN. BHD – EPCC of Additional PSR-2 Crude Storage Tanks (APCST) Project
Vendor Data Review for mechanical packages listed below:
Specification for Oily Waste Water Pumps (Centrifugal) Specification for Stripping Pumps (Screw Type) Specification for Condensate Recovery Pump
NIPPON Oil Exploration Sdn Bhd – FEED For Layang Development Project
Prepared Material Requisitions, Specifications/ Report and Datasheets for mechanical equipment packages listed below:
Specification for Diesel Generator Specification for Centrifugal Pumps Specification for Diaphragm Pumps Specification for Platform Crane Design Basis Report Material Handling Study Report Constructability Study Report
Updated November 2014
Page 6 of 7
RNZ INTEGRATED (M) SDN BHD (Feb 2007 - Apr 2008)
Position : Senior Mechanical Engineer
Maersk Oil Qatar As Block 5 Field Development Project 2000 - Package 16, BE Process And BG Utility Platforms For Sime Darby Engineering Sdn Bhd (SDE)
Prepared Material Requisitions, Specifications, Datasheets, Technical Bid Evaluations, Purchase Specifications and Vendor Data Review for mechanical equipment packages listed below:
Pedestal Cranes (36MT API 2 C Cranes) Crude Oil Export Pumps (496m3/h@120m,182kW) Water Injection Booster Pumps (1670m3/hr@155m, 900kW) Sea Water Lift Pumps (1148m3/[email protected], 301kW) Firewater Pumps (1428m3/h@124m, 682kW) Fuel Gas Treatment Package Nitrogen Bottle Skid Package Material Handling Equipment Material Handling Study Report
Engineering Detailed Design Services For Betty Revisit – 4 Project For PETRONAS Carigali Sdn Bhd (PCSB)
Prepare specification for:
Launchers and Receivers Pressure Vessel (Less than 32mm thickness)
AKER KVAERNER ENGINEERING (Feb 2006 - Jan 2007)
Position : Senior Mechanical Engineer
Vasai East BCPA2 Platform, Oil and Natural Gas Consortium India (ONGC) Samsung Heavy Industries (SHI)
Vasai East was an EPCC Project whereby I am responsible of preparing Material Requisitions, Specifications, Datasheets, Technical Bid Evaluations, Purchase Specifications and Vendor Data Review for mechanical equipment packages listed below:
Diesel Engine Driven Fire Water Pump Ejectors and Knock Out Pot Deck Cranes (API2C) Hot Oil Circulation Pumps (API 610 Cent Pump) Main Oil Line Pumps Main Injection Pumps Material Handling Equipment. Material handling Study Report
RANHILL WORLEYPARSON SDN BHD (Jan 2003 - Jan 2006)
Position : Mechanical / Piping Engineer
RESPONSIBILITIES:
Assisting Lead Engineers with the development of conceptual and detailed mechanical piping design of offshore projects Preparing specification, technical documentation and reports within the given timeframe. Familiarization of international codes and standards, Company codes such an DEP and PTS Assist lead commissioning engineer during commissioning of gas turbine compressors. Sabah Gas Conservation Project, Shell Sabah
Site visit to South Furious and Saint Joseph Platform:
To verify tie-in points and material handling survey Prepare Site Visit Report Prepare Material Handling Study Report
Angsi A Gas Procession upgrade Conceptual Study, PETRONAS Carigali Sdn Bhd
Site visit to Angsi-A platform (ANPG-A & ANDR-A)
To verify piping tie in points. To conduct surrey on space availability for the new compression module. To data search on equipment datasheets Assist Lead Mechanical Engineer to prepare Feasibility Study Report Dulang-B Feasibility Study of Gas Enhancement Project, PETRONAS Carigali Sdn Bhd Prepare presentation material Assist Lead Mechanical Engineer presenting the Feasibility Study to PCSB EOR. Prepare Feasibility Study Report
Updated November 2014
Page 7 of 7
Penara North Lukut Compressor Commissioning for PETRONAS Carigali Sdn Bhd Provide engineering services for PETRONAS Carigali. Prepare Pre-Commissioning, Commissioning and Post-Commissioning report for Bunga Kertas Centaur 50 Gas Compressor. Coordinate commissioning of compressor activities. Melut Basin Development Project for Petrodar Operating Company Ltd. Assist Senior Pipe Stress in Pipe Stress Analysis using CAESAR II. Detailed Engineering Design For Well Test Facilities Upgrade at Semarang Complex for PETRONAS Carigali Sdn Bhd Site visit to F23 Platform. Prepare Specification for various Rotating and Static Mechanical Equipment, such as vessel, SS
Potable Water Storage Tank, Electric Submersible Pumps, High Pressure Centrifugal Pumps, Pedestal Cranes, Material Handling Studies, Material Handling Study for Drilling, Production and Living Quarter Platforms, Manual Trolley Hoist, Stress Analysis using CAESAR II, Assist Lead Engineer in Project Management, prepare and update progress report and project fillings.
E11 Rejuvenation Detailed Design Services for Shell Sarawak Berhad (SSB) Compile and verify data for Pipes, Fittings, Valves and Flanges used in Ell platform, which was then used in PDMS for
modeling and designing of replacement materials. Prepare a Material Take-Off for valves, pipes and pipe fittings. Familiarize with international Codes and Standards such as ANSI, ASME and ASTM Prepare Specification, Datasheets and Scope of Supply for Static and Rotating mechanical Equipment like vessels, pumps and
tanks. Familiarize with OSHA, Shell Standard Engineering Specification (SES), Shell Design and Engineering Practice (DEP) and
PETRONAS Technical Specifications (PTS) for Fire fighting and safety equipment. Detailed Design for Shallow Clastic Compression (SCK-A) Module and Pipeline for Sarawak Shell Berhad (SSB) Prepare Specification, Datasheets and Scope of Supply for Fire Fighting & Safety Equipment for SCK-A platform. Detailed Engineering Design for MCOT Rejuvenation Project (Phase1) for PETRONAS Carigali Sdn Bhd Prepare Specification and Datasheets for
Mechanical Specialty List Master Equipment List Piping System Foam Storage Tank
Putrajaya Prescient 1 COGEN / DCS Annex Plant Project
Detailed Design Study Prepare Material Take-Off for mechanical equipment, pipes, flanges, valves and pipe fittings.
STENA DRILLING LTD ABERDEEN June 2002 - Sept 2002
Position : Internship
Stena Dee (Semi-Submersible Drilling Rig) Rejuvenation Project. Assist Lead Design Engineer during site visits (twice) on Stena Dee (North Sea). Assist Lead Design Engineer preparing site visit report. Assist Lead Design Engineer updating as built drawing for three other submersible rigs owned by Siena Drilling (Stena Clyde, Don
and Spey)