Project
Management
Team
Meeting #1
Project Update
I-494
Corridor
Commission
11/13/2015 1
Agenda
• Welcome
• Project Background
• Schedule and Scope
• Detailed Study Tasks
• Next Steps
211/13/2015
11/13/2015
2
PROJECT BACKGROUND
11/13/2015 3
Study Area
411/13/2015
11/13/2015
3
Study Background
• MnPASS System Study – Phase II
• Met Council Transportation Policy Plan
• MnDOT Congestion Maps (5+ hours of congestion per day)
A.M. Peak Hour P.M. Peak Hour
511/13/2015
SCHEDULE AND SCOPE
11/13/2015 6
11/13/2015
4
Study Schedule
Updated: 09-30-15 2015 2016
1.0 Project Management
2.0 Assess & Documennt Operational Needs in the I-494/TH 62
Corridors
3.0 Develop Concept Layouts and Cost Estimates
4.0 Multi-Resolution Modeling & Analysis
5.0 Benefit Cost Analysis
6.0 Develop Short and Long Term Recommendations &
Implementation Plan
7.0 Community Outreach & Education
- Development of Public Outreach Plan
- Phase I Outreach
- Phase II Outreach
- Phase III Outreach
Docum
enta
tion
Corrid
or Conce
pt
Develo
pmen
t
Targ
et "S
pot"
Opera
tional
Impro
vem
ents
Benefit
Cost
Analys
is
Imple
menta
tion
Plan
Corrid
or Eva
luatio
n &
Analys
is
Backg
round
711/13/2015
Study Goals
• Increase person throughput and travel time reliability
• Enhance economic vitality of the region
• Enhance safety and mobility by providing congestion free options
• Enhance/maintain advantages for transit, taxi cabs, airport shuttles,
park and ride, ride sharing, and non-motorized connections
• Use existing infrastructure, right-of-way, and performance based
principles to the maximum extent possible as well as lower cost-high
return on investment strategies
• Coordinate and provide synergies with other planned and programmed
investments
• Educate, inform, involve, and adapt to public stakeholders at strategic
decision making points throughout the duration of the study
811/13/2015
11/13/2015
5
Study Scope
• Project Management
• Assess operational needs on both study corridors
• Develop conceptual layouts
• Multi-resolution modeling
• Benefit-cost analysis
• Short- and long-term recommendations and
implementation plan
• Community outreach and education
911/13/2015
DETAILED STUDY TASKS
11/13/2015 10
11/13/2015
6
Project Management
• Project Management Team
• Technical Steering Committee
• Public Outreach Committee
o Public Involvement Plan
• Modeling Committee
• Coordination with the TH 169 Mobility Study
1111/13/2015
• Develop Public Involvement Plan
• Three Phase Approach
o Phase I – Educate, inform, and engage
� Study process
� MnPASS
� Existing conditions, corridor uses, perceived issues
o Phase II – Engage
� Alternative input
o Phase III – Inform
� Study recommendations
� Corridor vision
Community Outreach and Education
1211/13/2015
11/13/2015
7
Existing Operations Assessment
• Existing Congestion Causes
• Reliability Analysis
• Safety Assessment
• Transit Service
• Origin-Destination
• Needs Assessment
1311/13/2015
Existing Congestion Causes
• Operations
o MnDOT Metropolitan Freeway System 2014 Congestion Report
1411/13/2015
11/13/2015
8
Existing Congestion Causes
• Eastbound I-494 at France Avenue – Lane drop/entering traffic
AM Peak
PM Peak
1511/13/2015
Existing Congestion Causes
• Westbound I-494 at I-35W – Ramp to ramp weaving
o Downstream TH 100 be new bottleneck
AM Peak
PM Peak
1611/13/2015
11/13/2015
9
Existing Congestion Causes
• Eastbound TH 62 at France Avenue – Entering traffic (P.M.
Peak)
PM Peak
1711/13/2015
Existing Congestion Causes
• Westbound TH 62 at Valley View Drive – Entering traffic
(A.M. Peak)
AM Peak
1811/13/2015
11/13/2015
10
Existing Congestion Causes
• Westbound TH 62 at France Avenue – Entering
traffic (P.M. Peak)
PM Peak
1911/13/2015
Existing Congestion Causes
• Eastbound TH 62 at Portland Avenue – Entering
traffic
2011/13/2015
11/13/2015
11
Existing Congestion Causes
• Additional congestion causes
2111/13/2015
A.M
. P
ea
k H
ou
rP.
M. P
ea
k H
ou
r
Safety Assessment
2211/13/2015
11/13/2015
12
Reliability Analysis
• Causes of nonrecurring congestion
o Weather
o Crash
o Incident
o Roadwork
o Overlap/Combination
2311/13/2015
Reliability Analysis
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
An
nu
al D
ela
y (h
ou
rs)
I-494
Rd Work
Incident
Overlap
Crash
Weather
Normal Conditions
EB
WB
EB WB
EB
WB
EB
WB
EB
WB
EB WB
11/13/2015 24
11/13/2015
13
Reliability Analysis
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
An
nu
al D
ela
y (h
ou
rs)
TH 62
Rd Work
Incident
Overlap
Crash
Weather
Normal Conditions
EB WB
EB
WB
EB
WB
EB
WB
EB
WB
EB WB
11/13/2015 25
Reliability Analysis
• EB I-494 from TH 100 to I-35W
2611/13/2015
11/13/2015
14
Reliability Analysis
• EB I-494 from TH 62 to US 212
2711/13/2015
Reliability Analysis
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
E494 W494 E62 W62
An
nu
al D
ela
y (h
ou
r)
Year 2014 Total Corridor Delay
Rd Work
Incident
Overlap
Crash
Weather
Normal Conditions
2811/13/2015
11/13/2015
15
Reliability Analysis
0
2
4
6
8
10
12
E494 W494 E62 W62
Ave
rag
e D
ela
y p
er
Ve
hic
le-M
ile (
se
con
ds)
Average Delay per Vehicle-Mile
Rd Work
Incident
Overlap
Crash
Weather
Normal Conditions
2911/13/2015
Existing Transit Issues
3011/13/2015
11/13/2015
16
Existing Origin-Destination
3111/13/2015
Existing Origin-Destination
11/13/2015 32
11/13/2015
17
Existing Origin-Destination
11/13/2015 33
Existing Origin-Destination
• A.M. and P.M. Peaks for each segment by direction
11/13/2015 34
11/13/2015
18
Concept Development
• Develop managed lane design concepts
• Spot mobility improvements
• Transit advantage design concepts
• Develop evaluation criteria
o MnPASS System Study
o Agency Long Range Plans
o TSC Input
• Cost Estimates
3511/13/2015
Multi-Resolution
Modeling and Analysis
• Travel demand forecasting
• O-D assessment (INRIX vs. RTDM)
• Revenue analysis
• Transit operations and ridership
forecasts
• Mesoscopic dynamic traffic
assignment model
• Microsimulation analysis
36
11/13/201511/13/2015
11/13/2015
19
Benefit-Cost Analysis
Benefits
• Travel Time Savings
• Vehicle Operations
• Safety
Costs
• Capital Costs
• Maintenance Costs
3711/13/2015
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
Add General Purpose Add MnPASS Add HOV
Pe
ak
Pe
rio
d P
ers
on
Tri
ps
Reliability by Person Trips - Peak Period/Peak Direction
4.0 x Free Flow
3.5 x Free Flow
3.0 x Free Flow
2.5 x Free Flow
2.0 x Free Flow
1.5 x Free Flow
Free Flow
Managed Lane
Benefit-Cost Analysis
12,00012,000
21,00021,000 18,00018,000
Increase
reliability by
9,000 trips
Additional
4,000 people
throughput
Travel Times
I-35W North Managed Lane Study
3811/13/2015
EXAMPLE
11/13/2015
20
Recommendations and
Implementation Plan• Short- and long-term recommendations
• Develop preferred concept
• Identify logical groups of spot improvements that can be coordinated
as isolated projects
• Implementation plan
• Use planned investments to leverage funds
3911/13/2015
EXAMPLE
NEXT STEPS
11/13/2015 40
11/13/2015
21
Schedule Look Ahead
• Mid November – Project Websitehttp://www.dot.state.mn.us/metro/projects/i494and62study/
• Mid November – Needs Assessment
• Late November – Public Outreach Phase I
• December 17 – PMT #4
• Mid January – TSC #3
4111/13/2015
Contact Information
• Mike Sobolewski
MnDOT – Project Manager
(651) 234-7795
• Todd PolumSRF Consulting – Project Manager
(763) 249-6721
• Ryan LoosSRF Consulting – Deputy Project Manager
(763) 452-4764
4211/13/2015